PROFILE MONITORS FOR 700 + kW PROTON BEAM G. Tassotto, S. Childress, D. Jensen, D. Schoo Sept 24, 2014 NBI2014.

Slides:



Advertisements
Similar presentations
Radiopharmaceutical Production Target Foil Characteristics STOP.
Advertisements

TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Pion yield studies for proton drive beams of 2-8 GeV kinetic energy for stopped muon and low-energy muon decay experiments Sergei Striganov Fermilab Workshop.
Slide 1 Diamonds in Flash Steve Schnetzer Rd42 Collaboration Meeting May 14.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
 A GEANT4-based simulation was performed of the production target, solenoid, selection channel, and spectrometer.  The acceptance was found to be 8.3x10.
Instrumentation Specifications July 26, 2001 S. Childress Page 1 NuMI Specifications for NuMI Primary Beam Instrumentation.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
Apex Target Marco Oriunno, April 23, Design and fabrication by: Marco Oriunno, Dieter Walz, Jim McDonald, Clive Field, Douglas Higginbotham, and.
A Fiber Profile Monitor for Low Beam Intensities * G. Tassotto †, H.Nguyen, G. Sellberg, D. Schoo, Fermi National Accelerator Laboratory, Batavia, IL 60510,
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 19 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits With.
A study of systematic uncertainties of Compton e-detector at JLab, Hall C and its cross calibration against Moller polarimeter APS April Meeting 2014 Amrendra.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
NEW NEW Ionization Chamber Technology Anne Dabrowski Results on behalf of Mayda Velasco’s Hardware Research group. P. Ball 3, A. Darowski 1, G. Graham.
Study of Pion Capture Solenoids for PRISM H.Ohnishi AB M. Aoki C, Y. Ajima A, N. Fukasawa AD, K. Ishibashi B, Y. Kuno C, T. Miura A, K. Nakahara C, T.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Beam Instrumentation for Future High Intensity Hadron Accelerators at Fermilab Manfred Wendt Fermilab 8/25/2008HB2008 WG F: Diagnostics1.
V.Grishin, A.Koshelev, A.Larionov A.Pushkarev, V.Seleznev, M.Sleptsov A.Sytin.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
NuMI NBI03 November 7-11, 2003 FNAL thin beam windows Jim Hylen / FNAL Page 1 FNAL experience with thin beam windows Issue is: Survival of window in high.
Beam-based vacuum observations and their consequences Sergei Nagaitsev August 18, 2003.
BNL E951 BEAM WINDOW EXPERIENCE Nicholas Simos, PhD, PE Neutrino Working Group Brookhaven National Laboratory.
Dan Peterson, Cornell University Presented at the Workshop on Detector R&D Development of a Low-Material TPC Endplate for the ILD Experiment at.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
Calculation of Beam loss on foil septa C. Pai Brookhaven National Laboratory Collider-Accelerator Department
The Stripping Foil Test Stand in the Linac4 Transfer Line
Beam line Experiment area SC magnet Pion production target
The RHIC C-CNI polarimeter upgrade for 2009 Run. RSC Meeting, December 16, 2008 Anatoli Zelenski for polarimeter upgrade group. T.Russo, T.Curcio, D.Lehn,
Beam Halo Monitor : Q-bars+SiPMMike Albrow, 26 Aug 2010 A Beam Halo Monitor for the LHC based on Quartz Cherenkov Counters Mike Albrow (Fermilab) Features:
IEEE NSS 2007 D.Kramer 1 Very High Radiation Detector for the LHC BLM System based on Secondary Electron Emission Daniel Kramer, Eva Barbara.
NuMI Primary BooNE / NuMI S. Childress (FNAL) Primary Beams for Mini-BooNE & NuMI 18 March, 2002 Mini-BooNE inputs from Craig Moore and Al Russell Includes.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
P-Carbon CNI polarimeter upgrades. Vacuum system. Target drives. Targets. Polarimetry Workshop, July 31, 2009 A.Zelenski for polarimetry group.
10/5/2005 jrz1 Not quite “All” you want to know about Flying Wires At Fermilab Jim Zagel 10/5/2005.
High Intensity Beam Test of Beryllium for Target and Beam Window Applications Presented by: Brian Hartsell Contributors: Kavin Ammigan, Patrick Hurh NBI.
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
ATLAS Transition Radiation Tracker End-cap Quality Control and the Characterization of Straw Deformations Michael Kagan University of Michigan Supervisor:
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
Measurements of Intense Proton Beams using Optical Transition Radiation Vic Scarpine, Fermilab TIPP 2011 Chicago, IL June 10, 2011.
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
NuMI PS Specs June 2001 S. Childress Page 1 NuMI NuMI requirements are for a very large fraction of the available Main Injector intensity over a period.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
Progress of gas-filled RF hadron monitor study K. Yonehara APC, Fermilab 2/10/16K. Yonehara1.
ESS wire scanner Benjamin Cheymol
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
Scintillating Fiber Profile Monitor The M-Test Experience Gianni Tassotto 112/15/2014.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Primary Design Parameters July 13,2001 S. Childress Page 1 NuMI Besides design specifications driven by physics and Main Injector beam parameters, significant.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
Planar Edgeless Silicon Detectors for the TOTEM Experiment
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Use of Beam Loss Monitor type detectors in CNGS muon station
Variable distance from beam.
Review of Quench Limits
Presentation transcript:

PROFILE MONITORS FOR kW PROTON BEAM G. Tassotto, S. Childress, D. Jensen, D. Schoo Sept 24, 2014 NBI2014

Evolution of Fermilab Secondary Emission Profile monitor Prior to NuMI: Fixed Target Beamlines – The FNAL design saw a transformation from SWICs to SEMs where the vacuum windows and bias foils were deleted from the original SWIC design for two reasons: – much less beam scattering. – negligible signal change when a clearing field was applied to the foils. – Fig. 1, 2 and 5 show a SWIC, a vacuum can that houses SEM board. – Material - Started with 75 μ AuW wires at a pitch of 0.5 to 2 mm depending on beamline requirements. Special case is KTeV where the wire pitch was 125 μ for the target and 250 and 500 μ for the beamline detectors. AD Transfer Beamlines - Separate H,V planes on a G-10 frame. Later the frame was replaced with ceramic board. Also used 25 μ Ti wire wound at 2 wires/pad to increase signal while minimizing material. Key improvement “Flash- test” (Fig. 3, 4). Pbar Beamline – Designed in early ‘80’s. The detectors were designed for 2 and 3 mm pitch using 10 μ thick Ti strips (Fig. 6). 2 Fig. 1 FNAL SWIC Fig. 3 8 GeV transfer line (G-10)Fig. 4 8 GeV transfer line ceramic u wires/pad Fig 2 Typ. Vac Can Fig. 5 Ceramic frameFig. 6 Pbar SEM 3 mm pitch G. Tassotto NBI2014

Pbar Target SEMs G. Tassotto NBI20143 First detector was designed by J. Krider, C. Hoivat and Curtis Crawford for position resolution of 20 μ in 1986 [1]: Specifications: μ Dia. Ti wire/plane. The 12 center wires have a pitch of 250 μ, the outer 500 u μ Ti electron collection foils - Spring Tension: 50 g Fig 7 shows the construction of the first SEM A new detector was built by Patrick Hurh in the nineties [2] having the following specifications: - 16 center Ti wires 50 μ Dia., pitch 125 um. - Outer region 14 wires at a pitch of 250 um. -Resolution in position of the wires is maintained by two “V” shaped arrays of stainless steel pegs inserted into the ceramic board. Each wire is bent around a peg, crimped to a spring. - The springs supplied around 95 g of tension. Fig. 8 shows the central section of the upgraded Pbar SEM. Fig. 7 First Pbar SEM Fig. 8 Upgraded Pbar SEM FNAL DRW #

Some NuMI Requirements & Specifications Profile monitors have a dual use application in the 0.4 – 0.7 MW 120 GeV NuMI/NOvA primary proton line. An essential requirement has been to be able to use them readily at operational beam power. – Determination of beam size and shape along the transport and for targeting. This provides the primary diagnostic for emittance and optics understanding. – Continuing precision calibration for the BPM’s and BLM’s. This imposes additional requirements for profile monitor position reproducibility vs. BPM accuracy A robust solution for moving profile monitors in or out of the intense beam seamlessly has been implemented, utilizing the combination of: – vacuum can mounted at 45 deg. – ceramic C-frame wire mount also at 45 deg. resulting in horizontal and vertical beam profile measurements. Monitors are automatically moved into the beam on a once per shift basis. 4G. Tassotto NBI2014

SPECIFICATIONS DETAILS Must withstand beam heating by the 700 kW beam, and radiation dose of ~ 1x protons /cm 2. Secondary emission properties should not age significantly in the NOvA beam. Required fractional beam loss < 2.5x10 -6 for beam transport and < 5.0 x10 -6 for targeting monitors. No material should be exposed to the beam during monitor movement beyond that of the SEM signal strips. Accuracy for placement of monitors into the beam should be < 20 µm, for a lifetime total of 20,000 insertions. Gas load after 100 deg. C bake-out of < 3x10 -7 Torr liters/sec. All gaskets/seals should be metal. G. Tassotto NBI20145

Early NuMI Profile Monitor R&D Initial design work was performed by University of Texas, Austin (UTA). Key features: – Linear drive – 5 um Ti strips, 150 u wide – Clearing field foils (3) – Strip tension using “accordion” imparts 1-2 g tension Target SEM was stationary and operated flawlessly for many years. Beamline SEMs developed operational problems: – Linear drive took many pulses to move the detector IN/OUT of the beam. 10X too much mass in beam during motion requiring to stop the beam – Too little tension on the strips which caused them to randomly short to each other during motion For more information about UTA SEMs see DIPAC Fig. 9 UTA SEM design Fig. 12 PM-101 installed Fig. 10 Ti foil ass’y Fig. 11 Clearing field foil Fig. 13 Accordion spring system G. Tassotto NBI2014

NuMI/NOvA Profile Monitor Development Following the original monitor limitations, we performed R&D to improve the reliability of the moveable SEMs & to reduce SEM grid mass.  Upgraded NuMI/NOvA Profile Monitor Design:  Rotary instead of linear drive. o More robust version of existing Fermilab rotary drive design. o Mount vacuum can at 45 deg. with ceramic C- frame SEM grid mount also at 45 deg. Enables seamless insertion of monitor during beam operation. o Tested to 500,000 cycles with no noticeable drive degradation or positioning accuracy.  Wires instead of foils for operational intensity monitors. o Enables reduced SEM grid mass, but more robust. o Do not need the extra signal provided by foils. o Conductive epoxy, EPO-TEK H20E used to insure mechanical and electrical contact for SEM grid. Fig. 14 shows the target station with 2 SEMs: the first has 20 μ Ti (grade 5) wires, used for actual beam. operation, and the second has 75 μ Ti (grade 1) used for optimizing tuning at low intensities [3]. Fig. 15 shows a 1 mm pitch wire plane ass’y. Fig. 16 shows a 0.5 mm pitch target wire plane. Fig. 17 show the set up used for assembling 7.5 μ Ti foil strips. Planned for the low intensity tgt. monitor. 7 G. Tassotto NBI2014 Fig. 16 TGT SEM, 0.5 mm pitch Fig. 14 NuMI Target Station Fig mm pitch Fig. 17 Ti foil ass’y

Properties for Different SEM Materials Wire/Strip Atomic number Atomic mass density(g/cm 3 ) Melting point(C/F) Emissivity W / Ti / C (filament) / Yield strength for Ti wire options Ti grade 1 has the mechanical properties listed above. Charts of yield strength vs. temperature stop around 300 C. By using a Ti grade 5 (Ti-6AL-4V) the yield curve is much higher. A tension of about 20 g/wire is applied to the 25 μ wires. A tension of 16 g is applied to 20 μ Ti grade 5 wires. For a ΔT of 300 ο C yield strength change is 62% for Ti grade 1 and 31% for Ti grade 5. The 300 ο C residual strength is 4.4 times greater for Ti grade 5. Ti - Grade 1Ti alloy - Grade 5 G. Tassotto NBI2014

Wire Heating Simulations Both UTA and Fermilab performed simulations. UTA simulated the temperature raise of 5 μ foil and 50 μ Ti wire. Data from: G. Tassotto NBI20149 Shown to the right is the Temperature analysis using MARS15 for a 25 μ Ti wire made by Nikolai Mokhov. The temperature rise (left plot) and the energy deposition (right plot) for a single pulse at the NoVA beam energy are shown. The center wire (red) show a temperature raise of about 450 degree C. for a 120 GeV beam pulse of 5 x

SEM sensitivity vs Beam Exposure Measurements for the target SEMs have been made for Ti (wires and strips) and Carbon [4]. 10 Measurements made by Doug Jensen G. Tassotto NBI2014 SEM 118, 33 u carbon Total POT = 4.5 x Original UTA SEM 5 u thick foil Total POT = 14.2 x New SEM 20 u Ti grade 5 Total POT = 3.5 x SEM sensitivity ages much more slowly as exposure increases.

BPM – SEM Beam Resolution The plot below shows data comparison between the target BPM and SEM. Measured beam positions agree within 20 μm rms for 1 hour of data considered. 11G. Tassotto NBI2014

Profile Monitors in the NuMI Beam The list below shows the present SEM materials in the NuMI beam. Various material combinations have been installed to determine the robustness of each. Below-right a display of the detectors is shown having the following proton beam parameters: -Energy: 120 GeV -Intensity: 3.2 x POT -Cycle time 1.33 sec 12G. Tassotto NBI2014 NameMaterial/DimensionWire pitch (mm)Comment PM-10125µ Dia. Ti wire1mmV, 1mmHGrade 1 PM-1055µ thick Ti foil1mmV, 1mmHFoil PM-10733µ Carbon filament1mmV, 1mmH PM-10825µ Dia. Ti wire1mmV, 1mmHGrade 1 PM-11220µ Dia. Ti wire1mmV, 1mmHGrade 5 PM-11420µ Dia. Ti wire1mmV, 1mmHGrade 5 PM-11533µ Carbon filament1mmV, 1mmH PM-11733µ Carbon filament1mmV, 1mmH PM-11833µ Carbon filament1mmV, 1mmH PM-12120µ Dia. Ti wire.5mmV,.5mmHGrade 1 PM-TGT20µ Dia. Ti wire.5mmV,.5mmHGrade 5 PM-TGTL75µ Dia. Ti wire.5mmV,.5mmHGrade 1

Conclusions We have proven that these profile monitors are reliable and can be exercised repeatedly without failure. They are readily moved seamlessly in or out of the beam during high intensity operation. The multiwire detectors can be baked at 100 degree C. Vacuum level reached is into mid Torr thereby satisfying vacuum requirements. Given the temperature rise estimates made and the beam results obtained so far we are confident that the 20 μ Ti grade 5 will survive the 700 KW beam. R & D will continue to make sure that SEM grids will survive a 2 MW beam, consists of: - Model the Temperature rise for Ti grade 5 and carbon monofilaments. In the latter case, devise a manufacturing process to lay 48 wires (possibly having a diameter as low as 5 μ ) across the ceramic board. - Continue beam testing to verify survivability. 13G. Tassotto NBI2014

References [1] J. Krider & C. Hoivat, “A multiwire Secondary Emission Beam Profile Monitor with 20 um Resoluton,” Nuclear Instruments and Methods in Physics Research, A247, pp (1986) [2[ P. Hurh et al, “A 10 um Resolution Secondary Emission Monitor For Fermilab’s Targeting Station,” 1993 PAC, pp [3] [4] AKNOWLEDGEMENTS: We would like to acknowledge the effort done by many people in Fermilab too numerous to list. G. Tassotto NBI201414