Capstone Design Smart CCC ASAP A person doing a presentation JIN GUK KIM.

Slides:



Advertisements
Similar presentations
Please login now.
Advertisements

Project Management. Main Phases of Project Development.
New Release Announcements and Product Roadmap Chris DiPierro, Director of Software Development April 9-11, 2014
BEYOND SMARTPHONES WITH RASPBERRY PI BY - ASHISH KSHIRSAGAR.
11 About me and my university & Design Indoor Location Based Service Provider Platform Kohei Ogawa Graduate School of System Design and Management Keio.
Location based Streaming Topics for our 1 st presentation  Thesis Description  Positioning System  Streaming over positioning  Questions Session.
Department of Electrical and Computer Engineering MDR Presentation Team Frij.
Moira Team Again_ Dongjoon Lee Changyun Kim Sangeun Kwon 1 st proposal presentation : Smart Phone App. for grouping people.
Raspberry Pi Garden Monitoring System: Current Progress The Garden Gnomes: Stacy Mar, Brandon Meyers, Devin Mullins.
Project Management and Scheduling
Systems Design. Systems Design Skills People skill (25%) - Listening, understanding others, understanding between two lines, conflict resolution, handling.
Honours Project Proposal Developing Country E-Commerce Portal Konstantin MasalovShiraaz Moollatjie Supervisors: Prof. Ken MacGregor Tiro Sethate.
CIS 499 Senior Seminar IT project management. Exercise. Write a testable problem statement in subject verb format. Who? Are the people going to use this.
CRITICAL DESIGN REVIEW Gregory LaFlash Patrick O’Loughlin Zachary Snell Joshua Howell Hao Sun Kira Jones THAT ONE SPECIAL SHOT TOSS
WEB-BASED DEAL LOG DATABASE PROJECT REVIEW Presented to SHEPHERD VENTURES By Sylvia Szubrycht.
By Mircea Jivoin. Objectives Achieving the warehouse management over the internet using the SOAP Web Services Achieving the warehouse management over.
Pi In The Sky (Web Interface) Gaston Seneza Philander Smith College, Little Rock, AR SIParCS Intern Mentors: Dr. Richard Loft & Dr. Raghu Raj Kumar 1.
R.O.M. System Team: RISC Takers Team Members: Paul Banks, Yorick Robinson, Evan Tu, & Hans Weggeman Louisiana State University – Senior Design October.
Topic Cafeteria Management System
GEOREMINDERS ANDROID APPLICATION BY: ADRIENNE KECK.
Project Presentation eProcurement System. M.TECH S16- Team S03 Institute of Systems Science Table of Content Project Background Project Requirement User.
Facility Integration Project Update Chelsea Smith – Project Manager Lake Shore Solutions.
Starting Comparing different projects that need to be done in the company Make project selection: Coding Performance Improvement Project.
ECE 477 Final Presentation Team 12  Spring 2013 Xirong Ye Zongyang Zhu Chun Ta Huang Libo Dong.
Smart Surveillance Technology Javier OcasioPerezWilliam Sanchez Rosa Mariel Martinez MarreroAbraham Diaz Santiago.
Logic Analyzer ECE-4220 Real-Time Embedded Systems Final Project Dallas Fletchall.
Intel SECSIMPro Script Editor Introductory Presentation E N S C R Y P T The E N S C R Y P T Team Brian Crampton, Eric Miles, & Yoshani Thiruvilangam.
CD Collection Hector Urtubia Fall Summary Motivation and Objective Technologies Used Project Design Database Design and Integration Demo.
Milestone Presentation CS 410 Red Team Presenters: Olga Stubbs, Adrian Clark 7 April 2005.
CONFIDENTIAL WMS Automation for Warehouses using Handheld device and Internet of Things (IOT) – Phase 1.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
ECE 477 Final Presentation Team 1  Spring 2013 Zelun Tie Xin Jin Ranmin Chen Hang Xie.
Monthly progress report So far we have completed the following:  weighted decision matrix  scope statement  Business case analysis  team contract 
PROJECT BATTLEDSHIP TEAM GAY AVENUE MELODY KIDD (FALL TEAM LEADER) SCOTT MATSUO KELLY MCFARLANE (WEB TRAINEE) RAPHAEL RAMOS.
Capstone Design 박차영 김동연 설인수.
Network Monitoring Through Mobile (MOBTOP) Developed By : Akanksha Jain. (102199) Shikha Arora (101319) Team Name: Beans Course: CS532 Guided By:Prof.
Equations for Ecademy Client: ISU Computation Center Faculty Advisor: Dr. Robert Anderson Technical Advisor: Dr. Pete Boysen Team Members:  Tim Arganbright,
Final Presentation Smart-Home Smart-Switch using Arduino
Capstone design Remote manless probe Kim Jinkwang Han Seongkyu.
May 5, 2004Slide 2 OmnAuto TMS Solution May 5, 2004Slide 3 OmnAuto TMS Dataflow.
Capstone Design Camera for Security App - Final Report Kim Sang Min Jeon Byeong Yong.
Capstone Design Project - 1 / 11 Project Proposal ● Built-up-type RC car with augmented reality 정윤용 ( , ) 이석동 ( , )
Capstone Design Project - 1 / 13 Rubik’s cube solver by AR Project Proposal Team Mojojojo Kim Dong Hwi Cho Min Ji Yoon Ji Young
Home Control System by web and SMS Son Jin Ho. Contents Home network concept System features System flow diagram Database diagram Component diagram of.
(Patrol vehicle controlling remotely)
Final Report Yijie Xiao Project Title: Design and Development of a Continuous Monitoring System based on Wearable Devices Page 1.
SMART HOME Capstone project introduction Capstone project _Star team. Dec-12 1.
Capstone Design Project - 1 / 20 Project Mid-Term Report ● Built-up-type BC car with augmented reality (Graduation Work) FM TEAM JUNG YOON YONG ( )
Sharique Ali Khan. THE HUNTERS:  seekers of ??  Friends searches THE PROVIDERS:  Ordinary people in need of some help  Friends / Employers  Emergency.
H.I.T.S. Helmet Impact Tracking System
Smart Trash Bin Project
<Add team picture or relevant project picture here>
IoT 101 with Raspberry Pi and Azure
Energy saving for home (Graduation work)

Prepared by: Raghad J Foqha Supervisor: Dr. Saed Tarapiah
Design and Implementation of versatile ebot using raspberry pi
* Continued on next slide
Internet of Things.
Raspberry Pi.
License Plate Recognition SystemMay 13-17
“Would I have to do this all by myself …….?”
Ecosystem for Smart Glass Technologies: Proposal Presentation
Computer Systems INPUT PROCESS OUTPUT.
Intelligent HVAC Control
Tareq Khan, Ph.D. Assistant Professor,
John Thomas Dimitropoulos Team and website: Lostoneprodigy.com
Interactive Mirror Display
Lesson 5 Operating Systems.
Project Management Essentials
Presentation transcript:

Capstone Design Smart CCC ASAP A person doing a presentation JIN GUK KIM

Contents Motivation Theoretical Background Problem Statement Goal Statement Problem Scope Team Gantt Chart Budget Risk Management References

요즘 장거리 여행이나 출장 등 집을 오랫동안 비우는 경우가 많아 많은 범죄 가 일어나고 있습니다. 이로 인해 스마트 CCC 를 통해 실시간으로 누군가 집에 침입하면 센서가 인지해 카메라가 작동합니다. 캡쳐된 이미지를 스마트폰으 로 보고 이미지에 수상한 사람이 찍히면 근처 경찰서에 연락할 수 있도록 목 적으로 만든 작품입니다. MOTIVATION

Historical Background MOTIVATION IOT content and advertising business has been increasing year by year. We think of any way to incorporate advertising content and IOT.

 Why the Project is Required - We need to facilitate crime prevention.  Limitation of the Current Technology - It requires fast data processing through the socket. MOTIVATION

Ubuntu server Server (golang) GCM ServerMoblie (Android) Raspberry Pi Client (Q’t) Client (Java) GCM client key registeration DB (MYSQL) Push message request Push message send Client key request Rest API Camera module customer Theoretical Background

Problem & Goal Statement Problem Statement Goal Statement Data processing is too slow. The fast data processing through the socket.

SI P O C Supplier Input Output CustomerProcess -Bluetooth -Rasberry Pi -Python -Java -Database -Andorid -Device Mart -A.S.A.P -Open source -The accuracy of the sensor -socket technology with minimal error -Convenience Base data setting socket, purchase data save break continue connecting NO Yes -A.S.A.P -B2B -B2C Socket programming method using the OpenCV Problem Scope

Member KIM JIN GUK The server side using the Raspberry Pi Member LEE JU HYEON Input the advertising using database Director Prof. KimTeam

Milestone - Gantt Chart Date Feb.Mar.Apr.MayJuneJulyAug.Sep.Oct. Group and select topic Make a plan Search and collect data Make first report and buy materials Design and make hardware develop software and produce product Announce middle and final report Make prototype Test and analyst data Improve and update product Summit result and conclusion 2 nd schedule1 st schedule 3 rd schedule

Budget  Rasberry Pi Kit SET  PIR Sensor  HDMI CABLE  RPI CAMERA 7,454won 70,000won 2,760won Total Budget : 111,914won 31,700won

Risk Management ※ Schedule ※ Budget ※ Goal We can interfere with schedule because parts were temporarily out of stock We expect additional costs for this server. Our goal is to reduce the cost and the experimental error in the server as possible.

References ograming/Documents/Socket_Sample pdf