LOI # 08-5130 Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.

Slides:



Advertisements
Similar presentations
Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
Advertisements

St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
ODOT Structure Project Manager Training
Structural Steel Construction
Investigating Structures and Materials Structures Activity.
Bridge Building 101 Presented by KEEN.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
Bridge Engineering (6) Superstructure – Concrete Bridges
By : Prof.Dr.\Nabil Mahmoud
Structural System Overview
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
ENG-1010 Lecture 16 Bridge Design.
Chapter 34 Bridge Construction.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
Johnson Street Bridge Replacement Project Technical Briefing April 8, 2015.
PREFABRICATED BRIDGE ELEMENTS & SYSTEMS (PBES), DECISION- MAKING FRAMEWORK Claude Napier Sr. Structural Engineer Resource Center - Structures TST.
Research Advisory Committee Annual Meeting FHWA Briefing Michael Trentacoste Associated Administrator Research, Development, & Technology Director, Turner.
POWERPOINT PRESENTATION
The Millennium Science Complex
Reconstruction of the Eads Bridge Highway Deck
Module 15: Railway Structures
 Project Delivery  Design Considerations  Lessons Learned.
Module 1 What are Prefabricated Bridge Elements & Systems for Accelerated Bridge Construction (ABC/PBES)? Module 1 What are Prefabricated Bridge Elements.
There are more than 500,000 bridges in the United States!
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
BRIDGE DESIGN SAIF HAROON BY Post-Doctoral Research Associate
There are many types of bridges including:
8 th Grade Industrial Technology 8 th Grade Industrial Technology.
NE Regional statistics and discussion guide report Summary
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Other Construction Projects
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
TYPICAL member spot checks & alternate systems design study
International Partnership Day.  An SPMT is used for transporting massive structures that are too large or heavy for normal trucks  The SPMT consists.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
What do you think civil engineers do?
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Bridges. A bridge is a structure built to span a gorge, valley, road, railroad track, river, body of water, or any other physical obstacle.structurespangorgevalleyroadrailroad.
Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Engineers and bridges. Just the facts The four main factors are used in describing a bridge. By combining these terms one may give a general description.
DIFFERENT TYPE OF BRIDGES
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Cross Wall Construction
A CCELERATING B RIDGE C ONSTRUCTION (ABC) WITH P REFABRICATED B RIDGE E LEMENTS & S YSTEMS (PBES)
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 G4 Design.
FHWA Updates/News Benjamin Beerman, PE Federal Highway Atlanta, GA
Offsite manufactured Bridges
Replacement of Vehicle Bridge over Spring Creek
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
New Bridge Construction
Sandra Larson, P.E. Iowa Department of Transportation
Chapter 5: Substructure
Ben, Jonathan, Mason, Kambriea Design Team 1
Offsite Applications for Rail Overbuild Part 1
Accelerated Bridge Construction; Raising the Bar
Presentation transcript:

LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction

Program Objective To implement Accelerated Bridge Construction (ABC) techniques in the repair/replacement of County Bridges and to standardize the design and construction of new bridges. To implement Accelerated Bridge Construction (ABC) techniques in the repair/replacement of County Bridges and to standardize the design and construction of new bridges.

Program Goals 1.Reduce on-site construction time. 2.Reduce traffic and environmental Impacts 3.Reduce life-cycle costs. 4.Improve worker and vehicle safety and 5.Enhance the quality of the constructed bridges.

Accelerated Bridge Construction is: To build the bridge first before you set cones, then quickly move it into place – like a weekend!

What is driving the change for Collier County  The infrastructure is aging  Goal: A minimum 75- yr service life  Currently: 1.Average bridge life is 42 years 2.Average bridge deck life is year  Standardization to achieve lower costs

Commitment to National Vision Commitment to National Vision Means: Innovative Technology Goals Durability Safety Efficiency and Quality

3-Phase ABC Project  Phase 1 – Develop ABC Standards  Phase 2 – Develop Pilot Project  Phase 3 – Construction of Pilot Project

“County-Scale” Solutions  Various solutions are deployed by counties to accelerate construction –Prefabricated arches (Bebo / ConSpan) –County-built flat slab segments –Short span double-T w/o topping –Inverted T beams –Pre-engineered trusses –Inverset steel beams –Various sawn or manufactured timber products –Slab bridges or deck panels

Pilot Project Golden Gate Main Canal 23 ST SW White Blvd.

Pilot Project  Complete roadway closure  Detour alternative  Connect 23 rd Ave. SW across the Golden Gate Main Canal

Pilot Project White Boulevard Bridge Replacement Major rural collector – built in Span prestressed concrete slab Functionally Obsolete Sufficiency Rating 44.2 Health Index ST SW Bridge Approved by GMP for new Bridge connection Provide better connection for Emergency services and Potential emergency evacuation route

Precast Decks on PS Beams

Precast Decks on Steel Framing

Precast Abutments

Precast Piers

Retaining Walls  Mechanically Stabilized Earth Walls  Precast Gravity Walls  Precast Cantilever

Total Bridge Prefabrication

Construction Considerations  Activities sequenced/scheduled appropriately to optimize time and accelerate construction  Contractor to be familiar with new technologies or materials being used  It may effect scheduling of activities  Adequate upfront time allowed  Shop drawings  Shop drawing approval  Fabrication  Full curing of all precast elements

Construction Considerations  Plan for space in the staging area for all required equipment  Provide space for demolition of the existing structural elements

Questions?