TH36 Closing Options Study Presented by: Market Research March, 2006 Maps from Google.

Slides:



Advertisements
Similar presentations
4.13 Jacob.
Advertisements

Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
Construction Communications. Communication is an expectation Inform our customers about improvement projects Raise awareness of: Construction zone locations.
2-10 ODOT Sign Policy and Guidelines for the State Highway System Ch. 6 – Construction and Maintenance Signs Oregon Department of Transportation Traffic-Roadway.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
1 The Potential For Implementing Demand Response Programs In Illinois Rick Voytas Manager, Corporate Analysis Ameren Services May 12, 2006.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
A Public Opinion Research Project Exploring Attitudes About Government Emily Ekins | Polling Director at Reason Foundation reason.com/poll.
Texas has a long legacy of good roads Symbol of our economic prosperity, attracting jobs and people to the State Our roads are used by you to get to work,
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1 Traveler Information on 2010 Construction Route 7 over I-87 (Exit 6) Bridge Replacement Town of Colonie.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
2013 Survey of California Home Buyers. Survey Methodology 1,400 telephone interviews conducted in March 2013 Respondents are home buyers who purchased.
Complete Streets Policy and Implementation Jason Ridgway February 11, 2014.
Design Speed and Design Traffic Concepts
A127 Ardleigh Green Bridge replacement - update EPAGRA Meeting 2 July 2015 Ardleigh Green Bridge replacement – update.
2012 Survey of California Home Sellers. Methodology Telephone surveys conducted in August/September of 600 randomly selected home sellers who sold in.
Craft is what we are expected to do; art is the unexpected use of our craft. Ed Catmull President of Walt Disney Animation Studios.
2012 Survey of California Home Buyers. Survey Methodology 800 telephone interviews conducted in August 2012 Respondents are home buyers that purchased.
2015 CALIFORNIA HOME BUYERS SURVEY 1. Survey Methodology 700 telephone interviews and 567 online surveys conducted in February – April 2015 Respondents.
Transportation Operations/Mobility in the Baltimore Region Customer Satisfaction Survey AMPO Operations Work Group September 28-29, 2006 Las Vegas.
1 Section III Day 2 DMV Manual p. 5-6, Write a scenario about how the driver of the white truck managed to keep his truck on the edge of the.
Texas has a long legacy of good roads Symbol of our economic prosperity, attracting jobs and people to the State Our roads are used by you to get to work,
1 Colorado Transportation Issues July 10, These unique polling results are based on 1,001 live telephone surveys among likely 2014 voters statewide.
Client Satisfaction Survey what’s possible Belgrade, July 2010 Report on the findings of the CSAI Success Grants Applicants’ Satisfaction with the Grant.
Summary of Key Results from the 2013/2014 Survey of Visa Applicants Who Used a Licensed Adviser Survey undertaken by: Premium Research Report prepared:
AGA 2009 Tracking Survey Perceptions of Governmental Financial Management Prepared for the Association of Government Accountants December 29, 2009 © Harris.
NAU ALUMNI What Do We Know About Them & What Are They Telling Us?
Measure 27 City Centre Access Control Katerina Oktabcova Usti nad Labem Municipality.
UNDERSTANDING CALIFORNIA HOME BUYERS Presented by Carmen Hirciag, MBA Senior Research Analyst.
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
Putting Market Research to Work! Chris McMahon Mn/DOT St. Paul, MN July 22, 2010.
City of Sarasota 2008 National Citizen Survey Conducted by the National Research Center (NRC) for the City of Sarasota.
FHWA TOP Survey Virginia November 2005.
Chapter 9 Driving in City Traffic More Complex!! Why? 1.Traffic is more dense – more cars, trucks, buses and pedestrians per mile than on rural roads.
September 2015 Town of the Blue Mountains Citizen Satisfaction Survey.
MODEL FOR SURVEYING PARENTS AND YOUTH ABOUT OST Presented by Dr. Julie Pokela Market Street Research
Purpose of Work Shop Share Ohio’s experience with a full closure reconstruction: the rationale, challenges, implementation and benefit.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Survey conducted: November 6th, 8th – 10th,
Pulsar Advertising Southeastern Institute of Research 1 I-66 Corridor: Westbound Traffic Issues Within the I-495 Beltway Community Involvement Survey December.
Asleep at the Wheel: The Prevalence and Impact of Drowsy Driving.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
New Business Overall Satisfaction Ratings Rating Scale = Extremely Satisfied 6 = Very Satisfied 5 = Satisfied 4 = Neither Satisf. nor Dissatisfied.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
Presentable Market Data. Understanding three views of the current market allows Buyers to maximize their ability to evaluate properties, receiving the.
Safety Recommendation A “Revise 14 CFR Part 91, 135, and 121 to require that all occupants be restrained during takeoff, landing, and turbulent conditions,
I-394 MnPASS Express Lanes Project Update Guidestar Board Meeting September 7th, 2005.
Transportation Finance Advisory Committee May 18, 2012.
Intersections.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
The SIPDE and Smith System “Defensive Driving Techniques”
Moving Ahead The American Public Speaks on Roadways and Transportation in Communities Federal Highway Administration Industry Briefing March 20, 2001.
North Dakota’s Experience Work Zone Focus State Workshop April 19, 2005.
Alternate Work Schedule Update Presented by: Robbie Berg, HR Director On November 5, 2009.
2011 RTD Customer Satisfaction Research Results: Executive Summary – Ops Committee March 2013.
CAPE ROAD SURGERY Patient Questionnaire 2013 / 2014.
2012 Citizen Survey Results Presentation City of Twin Falls, Idaho.
Four Winds Condominium Association August 2, 2017
Downtown Valdosta Truck Traffic Mitigation Study
The Oakton Condominium Association September 12, 2017
Highway 169 Bridge Replacement & Pavement Resurfacing
Student Satisfaction Spring 2006 (Short version)
M14A/D Select Bus Service
4.13 Explain characteristics of effective data-collection instruments.
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Presentation transcript:

TH36 Closing Options Study Presented by: Market Research March, 2006 Maps from Google

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Agenda About the study Results  Key Findings  Reaction to the scenarios  Stated Preference--Letting them choose  By respondent type Thoughts

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Background and Methods Planning construction on TH36 2 scenarios, each with pros and cons Wanted public input to the selection process Methods  Telephone interviews by Cook Research  February 2006

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Who Local Residents n = 400 Through Commuters n = 400 I694/35E Users n = 200 Local businesses n = 74

Key Findings

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Key Findings Residents  In favor of construction  Likely to be moderately supportive of either  If asked, more likely to pick 5 month closure Through commuters  In favor of construction  Likely to be moderately supportive of either Slightly more favorable to 2 year off peak delays  If asked, split 50-50

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Key Findings I694/35E Users  In favor of construction  Slightly more favorable reaction to 2-year non-peak delays  If asked, split Businesses  In favor of construction—but less so than other groups  More favorable to 2-year non-peak delays More likely to react negatively to 5-month closure  If asked, prefer 2-year non-peak delays

Current Feelings

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Current Satisfaction Levels Q2: Using a scale from 1 to 4 where 1 means very dissatisfied, 2 means somewhat dissatisfied, 3 means somewhat satisfied, and 4 means very satisfied, how satisfied or dissatisfied are you overall with [your current trip on] highway 36 between White Bear Av and Century Avenues?

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Inconvenience of TH36 Q3. Using a 5-point scale this time…how inconvenient is travel on Highway 36 in both directions between Century Avenue and White Bear Avenue? Thinking about the roadway itself and traffic, what number would you give it?

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified I694-35E Satisfaction & Inconvenience Q2: Using a scale from 1 to 4…how satisfied or dissatisfied are you overall with the I-694/35-E commons area? Q3: Using a 5-point scale…how inconvenient is travel on the I-694/35-E commons area?

The Idea of Construction

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Interest in Project Overall Q4. Mn/DOT is considering reconstruction of Hwy 36 from Century Av to White Bear Av. [See questionnaire for full description.] Based on this description alone, how do you feel about this project?

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Reasons for Reactions

Reaction to Scenarios

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Scenario 1 Highway 36 from Century Avenue to White Bear Avenue would be completely closed for a 5 month period in 2007 within April and September. It would then be open to one lane in either direction from September to November 2007, when it would again be opened to two lanes each direction. McKnight Road would also be one lane in either direction from April to September of Margaret Street would be closed and a vehicle bridge completed in A pedestrian bridge will be built near First Street and is expected to be completed in the fall of Project cost for this construction scenario is 15% lower than the other scenario.

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Scenario 2 In this scenario, Highway 36 from Century Avenue to White Bear Avenue would remain open to traffic with constant lane closures and delays during non-peak hours for 2007 and 8. McKnight Road would be one lane in either direction from April, 2007 through November, 2007, and Margaret Street would be closed, with the vehicle bridge completed in the second year. The pedestrian bridge near First Street is expected to be completed in the second year as well. The McKnight signal would remain until July, 2008 when it will be removed. Project cost for this construction scenario is 15% higher than the other scenario.

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Reaction to Scenarios S1: 2 year project with 5 month TH36 closure S2: 2 year off peak delays

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Reaction to Scenarios (cont’d) S1: 2 year project with 5 month TH36 closure S2: 2 year off peak delays

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Comparisons Current Satisfaction/ Reaction Inconvenience Pos. Neg. Extremely Not at all See questionnaire for question wording. Residents Commuters 694/35E Users

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Comparisons—continued Current Satisfaction/ Reaction Inconvenience Pos. Neg. VeryNot too See questionnaire for question wording. Residents Commuters 694/35E Users

Stated Preference

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Stated Preference Q10: Given that the construction will last two years either way, which of the scenarios we’ve discussed would you prefer? Close it down and divert highway 36 traffic for 5 months, or constant non peak delays on 36 for two years?

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Reasons for Stated Preference 11. Why do you say that? 5 Month Closure

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Reasons for Stated Preference 11. Why do you say that? 2 Year Off Peak Delays

Communications

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Usefulness of Communications Tools Q12: How useful would each of the following communications from Mn/DOT be to you, prior to and during the reconstruction of Hwy 36? Would each be…? Percent Very or Somewhat Useful

Thoughts

TH36 Closing Options Study 2006 Base = 400 residents, 400 through commuters, /35E users, 74 businesses unless otherwise specified Thoughts There doesn’t seem to be clear direction either way, for residents, through commuters, or I E users  Could argue either way However, businesses clearly favor the 2-year delay option  This is not disfavored by the other groups Biggest bang for the buck  Media with most universal appeal  Use other media to target specific groups

TH36 Closing Options Study Presented by: Market Research March, 2006 Maps from Google