Building Committee Presentation March 03, 2015. MAIN ENTRANCE.

Slides:



Advertisements
Similar presentations
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
Advertisements

PM – TECHNICAL ANALYSIS WORK BREAKDOWN STRUCTURE PRESENTED BY: RASHMI TAK PGDM 09/40.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
SCHEMATIC DESIGN PRESENTATION
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Recycle North Building Renovation and Design Senior Capstone Design Project Civil and Environmental Engineering Scott Hamshaw Presenting.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Chapter 2b Foundations Shallow & Deep Foundations.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
Building Plans.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Construction Drawings
F ACILITIES, P LANNING, AND C ONSTRUCTION April 14, 2014 Construction Report.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Lesson 5-1 Construction Technology Foundations of Technology.
North Augusta High School Design Development Presentation.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
Wilton Public Schools Town of Wilton, Connecticut Miller-Driscoll School Public Presentation Public Presentation October 14, 2015.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
Miller Driscoll Building Committee Update Tuesday, January 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations Miller-Driscoll.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Miller Driscoll Building Committee Construction Update Thursday February 4, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions &
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
1 Update on Off-Campus Development in South County: Update to FPP CAC – August 25, 2015 Siteman Cancer Center Expansion Phase II Development.
Foundations of Technology Construction
Bond Oversight Committee
2015 School Bond Construction Program
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Construction Documents
PAT MEETING HISD JACK YATES HIGH SCHOOL February 16, 2017 PAT MEETING.
Design of a Commercial Shopping Center
Most Construction FY 2013 Frequently Cited Violations
MONTHLY STATUS REPORT– May 2013
Pinole-Hercules Water Pollution Control Plant Upgrade Project
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Minuteman Vocational Technical Regional High School Progress
Progress Report 11/10/11.
Value of contract: Length of contract: Contract start date:
Most Construction FY 2013 Frequently Cited Violations
Woodlane Timber, Hucknall
Foundations of Technology Construction
Minuteman Vocational Technical Regional High School Progress
North Augusta High School – Phase 2A and 2B
Mount Vernon Community School
Troy School District 2013 Bond Program – Series 1 Construction Update June 2016 Barton Malow | TMP.
The New Leavelle McCampbell Middle School
Presentation transcript:

Building Committee Presentation March 03, 2015

MAIN ENTRANCE

TYPICAL CLASSROOM ELEVATION

Miller Driscoll Building Committee Construction Update Thursday March 3, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 5 Additions & Alterations Miller-Driscoll School

Current Monthly Activity – Continued Concrete Foundations – Completed Demolition at Miller Connection – Started Mass Site Cuts & Fills – 50% Complete with Foundations – Underground Utilities in Pre-K wing Complete – Administration relocated storage area in Miller Lower Level 6

7 Additions & Alterations Miller-Driscoll School Construction at Miller ConnectorConstruction at Driscoll Connector

8 Additions & Alterations Miller-Driscoll School New Mechanical Room Foundations New Addition Foundations

Additions & Alterations Miller-Driscoll School March - Monthly Activity – Complete Foundations – Start Steel Erection – Pour Slab in Pre-K – Relocate Access Road into Site South of Current Access – Install Water, Gas, Electrical and IT conduits from Wolfpit – Start demolition and layout in Lower Level Miller Storage area 9

10 Miller Lower Level – Storage Area Additions & Alterations Miller-Driscoll School

Storm-water Erosion Control – Complaint to Mr. Mike Conklin, Environmental Affairs about erosion control from the Rainstorm – 1.57” of Rain; – Erosion Control Breech in six locations on site. – Wilton Environmental Affairs Noted a Violation formally – Repairs and additional silt fence, hay bales and check dams were installed when the area dried out – Mr. Conklin has reviewed repairs and has requested a few precautionary measures and will continue to be monitoring the site on a regular basis 11

12 Additions & Alterations Miller-Driscoll School Erosion Control Looking NorthSediment leaving the site

13 Additions & Alterations Miller-Driscoll School Erosion Control Breech NE

14 Additions & Alterations Miller-Driscoll School Repaired Silt FenceRepaired Silt Fence/Silt Sock

15 Additions & Alterations Miller-Driscoll School Secondary Lines of Silt Fence installedStone Check Dams

Critical Schedule Planning – Roof & Exterior Shell Installation starts in April 2016 – Planning with Administration for Summer Renovation – Moving Companies – Received Budget – Re-evaluate the Project Schedule Overall 16 Additions & Alterations Miller-Driscoll School

17 Additions & Alterations Miller-Driscoll School

Public Out Reach – Parent Committee Mtg 5:00pm – Steel Beam – Students Handprints 18

Additions & Alterations Miller-Driscoll School Steel Beam Signage 19