EDMS N° 1501918 V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]

Slides:



Advertisements
Similar presentations
RAMIRI2 Prague 2012 Project management and the RI Life Cycle.
Advertisements

1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
1 Operations Management Lesson 5 Project Management.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
STTC Meeting 12/04/99 Eva Sánchez-Corral 1 ST Year 2000 Preparation Progress report Project Definition Report INB and the Y2K syndrome Actions. Conclusions.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
For more info:
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Review of Sector th of February Electrical Safety for the interventions during Hardware Commissioning of LHC Anne Funken, TS-ICC.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Dr. José Miguel JIMENEZ LS2 Coordinator, CERN 1 LS1 Debriefing day 31 st March, CERN.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Survey activities during LS1 Dominique Missiaen On behalf of the SU section.
Technology Department CERN-GREECE INDUSTRY DAY Monday, 31 March 2014 TECHNOLOGY DEPARTENT 2 In the frame of the Accelerators & Technology Sector at CERN,
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
TE-CRG Activities D. Delikaris, TE-CRG.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
CLIC Civil Engineering & Infrastructure Working Group Meeting
ELQA Electrical Quality Assurance
Giorgio on behalf of ELQA team
Safety in Construction and Upgrade Phases
TE-MPE LS1 review Vision from EN-EL(CF)
Looking back on 2014 and Perspectives for the MPE Group in 2015
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
MPE main activities planned for LS2
the CERN Electrical network protection system
SPS activities during LS2 TE-EPC (Power Converter Group)
Circuits description and requirements - Closed Session-
Overview & baseline of LS2 and roadmap for CRG
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
K. Foraz on behalf of OSS members
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Review of hardware commissioning
East Hall under construction
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]

EDMS N° V.1 Scope V. Montabonnet TE-EPC2 LS1 & TE-EPC Activities TE-EPC Organisation TE-EPC Feedbacks

EDMS N° V.1 LS1 TE-EPC Activities V. Montabonnet TE-EPC3 LS1 = 94x group activities as defined in PLAN LS1 was mainly LHC and SPS in term of activity volume. LS2 will have more activities and more scattered around the different machines

EDMS N° V.1 LS1 & SPS Consolidation V. Montabonnet TE-EPC4 Transformers Earth switches Thyristor stacks18kV cables SPS

EDMS N° V.1 LS1 & Static Var Compensators V. Montabonnet TE-EPC5 New 400V double-source Cooling plant consolidationNew Coils New earthing switches New CapacitorsMaintenance of resistors

EDMS N° V.1 LS1 & LHC Some Figures 61 converters relocated [R2E Project] 2600 DC cable disconnection for ELQA tests 1892 Lock-outs V. Montabonnet TE-EPC6

EDMS N° V.1 LS1 & LHC Output Module diodes replaced 4725 crimped hoses replaced (4.3km) 2500 fans installed 750 PSU upgraded (60A) 460 PSU upgraded for R2E (600A) V. Montabonnet TE-EPC7

EDMS N° V.1 LHC & CSCM Tests Heavy modifications of the RB converters for the tests 6 monthsof preparation and tests 1 Engineer [Part Time], 1 Technician and 2 electromechanical technicians at full time V. Montabonnet TE-EPC8

EDMS N° V.1 TE-EPC Organisation What worked well Preparation Work breakdown structure Work package analysis (scope, person responsible, resource requirements, procedures, time and cost estimation, status/reporting, dead line) Workload & planning for internal support resources V. Montabonnet TE-EPC9

EDMS N° V.1 TE-EPC Organisation What worked well Organisation New FSUs resource allocation (x2 for BE-09 and TE-05) Setting of internal group priorities Mobilisation of TE-EPC different teams with a dynamic allocation (FSUs, staff …) Accountability & engagement of the teams Lessons learned Keep points Anticipation & Preparation Limitation Manpower during installation/maintenance & tests phases V. Montabonnet TE-EPC10

EDMS N° V.1 TE-EPC & LS1 Coordination What worked well Work package Analysis - Useful for co-activity, constraints and service support identification Flexibility given by the Coordination Team - Useful to manage priority all around CERN complex and access constraints Trust and very good communication with the Coordination Team V. Montabonnet TE-EPC11

EDMS N° V.1 TE-EPC & LS1 Coordination V. Montabonnet TE-EPC12 What could be improved Don’t forget to plan Infrastructure Maintenance for TE-EPC Test Beds Maintenance of SVC’s related to the ‘Réseau Stable’ Cleaning Activities at the end of LS1 Access constraints to be reported in the Access Conditions Web Page and/or ADAMS’s database (Access to Accelerators)Access Conditions Web PageAccess to Accelerators

EDMS N° V.1 Electrical Safety What worked well Centralisation of the Demande de Travaux on LHC circuit DC side Identification of the different types of hazards and risk assessment (procedure, VIC …) Central planification Role appointment clearly identified for LHC circuit consignation V. Montabonnet TE-EPC13

EDMS N° V.1 Electrical Safety What could be improved LHC Electrical Safety Organisation not well known by everybody at the beginning of LS1. Could be part of a SIR training module In Injector complex, role appointment for Circuit Consignation not clearly identified Need a same organisation as for the LHC ? V. Montabonnet TE-EPC14

EDMS N° V.1 Tests & Organisation What could be improved Some tests requesting power converters arrived very late (LHC Energy Extraction System Test, Access & EIS validation …) Need a clear list of tests Need for each test: Testpackage Analysis to identify safety issue, the contribution of the different groups/services, the time needed Procedures in advance Assignment of Coordination Work V. Montabonnet TE-EPC15

EDMS N° V.1 Test & Quality Assurance What could be improved For LHC Normal Conducting Magnet Circuit & Injector Circuit, develop Automatic Test Sequences as for the LHC Cold Circuits for Quality Assurance V. Montabonnet TE-EPC16 Same tests every year Better traceability of the tests and their results Better detection of performance deviation

EDMS N° V.1 Tests & Planification What worked well Test Levelling (machine by machine) - very useful for manpower issue Time for tests. Their duration cannot be shrunk. V. Montabonnet TE-EPC17

EDMS N° V.1 Conclusions LS1 was successful with 100% of the baseline completed Good and effective organisation Positive feedback and very good collaboration with coordination team & services Safety and tests issues could be improved V. Montabonnet TE-EPC18