Recent Behavior of the Responsive Reserve Market presented to the Demand-Side Working Group December 2005.

Slides:



Advertisements
Similar presentations
Energy supply procurement services to improve the transaction process and help you get the most competitive prices Florida Public Service Commission July.
Advertisements

P A C I F I C C O N C O U R S E D R. S U I T E L O S A N G E L E S, C A P | F | E I.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
Congestion Pricing: Competitive Locational Prices of Power Stoft (2002)
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
1 Capacity Forecast Report Mark Ruane Director, Market Credit CWG / MCWG March 10, 2015 ERCOT Public.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Graham Generation and the Market – The Facts October 8, 2008.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
INTEGRATING WIND ENERGY WITH ELECTRIC SYSTEMS ERIC HIRST Consultant in Electric-Industry Restructuring Bellingham, WA December.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
December 8, 2006 PUCT DR Workshop Status of LaaR Participation in RPRS.
Future Ancillary Services Cost Benefit Analysis - Additional Runs and Analysis Julie Jin March 10, PRS.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
DSWG Update to WMS March 22, Demand Side Working Group Goals.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
Unit-Specific Deployment based on Modified Generic Cost Presented at WMS December 15, 2003.
24 Hour Bids in the CRR Monthly and Annual Markets Presented to NATF January 5 th, 2010.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Fuel Cost Components in the Fuel Adder
FIN 30220: Macroeconomic Analysis
California Product Offerings
AAMDC - Expense Optimization
Fuel Cost Components in the Fuel Adder
Future Ancillary Services Cost Benefit Analysis - Additional Runs and Analysis Julie Jin March 10, PRS.
The Value of Flexibility*
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
Proposed Credit Policy For Virtual Bidding
Auctions and Competitive Bidding
Market Returns During Election Years
Fuel Cost Components in the Fuel Adder
GCSE Business Studies Unit 2 Developing a Business
PJM Load Product (Consumption Product)
COSTS OF PRODUCTION General principle: If you know the technology of production (the production function or total product curve), and if you know the.
Frontier Economics, Inc. Cambridge, Massachusetts
Txho/10627 HLP089.PPT DSWG LaaR Update May 13, 2005.
Review of Abnormal MCPEs
Generation Adequacy Task Force Update to WMS
IG meeting, December 5th, 2012, DERA premises, Copenhagen
Benefits of ICAP Reliability Economics
Single Electricity Market performance over the previous 12 months
Dispersion.
Evolving Economic Dispatch in SPP
Context Corporate presentation Elia Group | 2015.
بازار برق: مباني، انواع و نهادها مقدمه بازار برق: تاريخچه، زمينه‌ها و كاستي‌ها تاريخچه زمينه‌‌هاي مقررات‌زدايي كاستي‌ها انواع بازارهاي برق رقابت‌پذيري.
Outline Modeling Issue 2017 Modeling Goals
Basin Electric SPP Market Update
100% Renewable Cities in Texas
Day-ahead market coupling
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Generation Expansion Daniel Kirschen
Nordic Winter Power Balance
Hurricane Rita Model Results
Financial benefits of solar and wind power in South Africa in 2015
Hurricane Rita Model Results
Hurricane Rita Model Results
Technical Committee Meeting January 27, 2012
Decentralization and Performance Evaluation
New England Roundtable
Planning Reserve Margin
IOU Procurement Issues -- SDG&E Perspective
Wholesale Electricity Costs
Price Stability Average level of prices in the economy is neither increasing nor decreasing.
Hurricane Rita Model Results
Market Pricing Issues: Update
Real Estate Investment Is Better Than Gold Investment
Presentation transcript:

Recent Behavior of the Responsive Reserve Market presented to the Demand-Side Working Group December 2005

2 RRS Cost Q:What is the “cost” of RRS? A:Every $1 in RRS prices = $20M/year to the market (8760 hrs/yr *2300 MW) = $61k/year per 100 MW load *. For example: An entity with 250 MW of load retains an additional $458k / year if RRS prices are lowered by $3 / MWh *. (Based on 8760 hours/year, 2300 MW RRS every hour, average system load of 33,000 MW.)

3 RRS-MCPC (Jan ’04 – Nov ’05) RRS prices generally track BES and natural gas prices. RRS shows greater % volatility than either BES or natural gas.

4 Hurricane Rita and RRS After the first shock, increased generator bids returned the bid stack to app. 93% of it’s typical size. But RRS-MCPC stayed 200% to 400% higher until 300+ MW of LaaR returned.

5 Hurricane Rita and AS RRS price often moved counter to BES price. RRS price movements are difficult to correlate with other AS prices.

6 RRS Bids and Marginal Cost Neither generators nor loads seem to be bidding their marginal cost for providing RRS. 1.The “marginal cost” of providing RRS is difficult to quantify for both generators and loads. 2.Generators routinely bid into RRS at $.01. As a typical example, in May of 2005 generators submitted 476 bids covering 36,391 MWh at $.01. Another 1,179 bids covering 42,801 MWh were submitted in May at $.11 or less, including one generator that bid in every hour of every day.