UNDERWATER SALVAGE ROBOT PRB III HydroBotics Inc. F EBRUARY 15, 2016 LUKE KARR ERIN FOGLE DAN SOWA CORBIN KRUCZEK KYLE ZIMMERMAN WILL HUDDLESTON ADVISORS:

Slides:



Advertisements
Similar presentations
FIRE FIGHTING ROBOT ELECTRO-MECHANICAL SYSTEMS TERM PROJECT 1
Advertisements

MCECS Guide Robot Project Project Update 5/23/2012.
1 PACE LITES PRESENTATION Advisor: Professor Sahakian Andrew Dai Lenore Kaplan Benjamin Mattson Nikhil Sethi.
Mechanical Design of Robots. High School Competitions.
EE 396/496 Scout ROV by Chris McLeod & Autonomous Systems Lab.
Group Members Ikechukwu Mogbana Adewuyi Kupolati Frederick Tyson Advisor Prof. Mahmood February, Senior Project 2005/06 Undergraduate Project Proposal.
2 Team Induct-Us: Anna Camery Kyle Ryan Brady Coyle Brett Russell Dan Mathewson Advisors: Herb Hess David Atkinson Greg Donohoe Mentors: John Porter Armen.
Group Members Frederick Tyson Ike Mogbana Advisor Prof. Mahmood May, Senior Project 2005/06 Final Presentation MICROMOUSE SECURITY SYSTEM.
EE 396/496 Scout ROV by Chris McLeod & Autonomous Systems Lab.
THE POSTURE PEDOMETER CUMMERBUND February 2012 Program Review Team Members: Kelly Han Kyle Mauer Kevin Vo Advisors: Dr. Aziz Inan (Faculty) Srija Pidaparthy.
Dual Degree Project ( ) Remote Operated Vehicle (ROV) for Underwater Ultrasonic Non Destructive Testing Project Guide: Dr. Prabhu Rajagopal Students:
Team A7: The Robotiers Jeff Ivey: Journalism, Writing Aaron Maharry: Programming, Mechanical Design, Construction Dan Sobchuk: Construction, Testing Luke.
Solar Powered Bats!.  Bat house is on-going project  Interdisciplinary –  Supported by College Sustainability Committee  Computer Programming (me)
Team 14: The Design and Construction of an Ackerman-Steered Robot Members: Kyle Quinn Julio Sosa Robert Steel.
FINAL DESIGN: To make our design “Universal” any sensor that uses the standard 4-20mA Output or any T-type thermocouple may be used. SOLIDWORKS CAD FINAL.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project D River Robot Navigation Team John Fastabend Justin Meyer Kim.
CS-EE 481 Spring March, 2005 University of Portland School of Engineering Project Swift Fox Automotive Accelerometer & RPM Monitor Team Andrew Robinson.
Wall-E Prototype I Team 1 Xin Jin
EEL 5666: Intelligent Machine Design Laboratory Final Presentation by Rob Hamersma April 12, 2005.
Automated Bridge Scour Inspection FSU/FAMU College of Engineering Team 7 Proposal 10/27/2010.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Surf Scoter Electronic Ballast for a Fluorescent Lamp Team McGuire,
AI and Robotics. Look at video clip and think about Input – Camera – Touch – Proximity – Wi Fi input Output parts – Motors/Legs/Wheels Sensors – Impact.
Robotic Football Project Review Board 3 Team Members: Nathan Rosenbaum, ME Keegan Ross, ME Zachary Myers, EE Joshua Chenault, EE Tyler Hertenstein, Engineering.
Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John
VEX ARM® Cortex®- based Microcontroller. The VEX ARM® Cortex®-based Microcontroller coordinates the flow of all information and power on the robot. All.
Team #5 Nicholas Baker Alejandro Haller Matthew Hudson Cristobal Riojas Sep 08, 2011 Fully automated machine that proves the concept of automated construction.
Status Report # 3 Commhut – Home Security Wire Protection System Team 7 Ronald, Orlando, Robert, Jaime An interfacing module to communicate with previously.
Project Goals Prove feasibility of hydraulic McKibben muscles Build a fully submersible robotic platform Execute realistic fish motion with a fish-like.
Accuracy In Your Back Pocket Mid-Semester Presentation March 26, 2015.
13 : Omni-Directional Robot Mid-term Presentation Ben Wolf Brent Cornelius Ed Cramer John Grabner James Grabner Advisor & Client: Dr. Nicola Elia October.
Bicycle Black Box (BBB) Christopher Kidd Anne Marie Carpenter Advisor: Dr. Wiley Preliminary Design Review (PDR) November 30, 2013 EEL 4906 Professional.
MSU SeaMATE ROV Explorer Class
Arduino Case Andrew Fawcett DESN 204.
A UTOMATED Design Team 8 David Martinez Robert Raley James Wilson A DJUSTABLE T ABLE Status Report #5 March 3, 2010.
Team #5 Nicholas Baker Alejandro Haller Matthew Hudson Cristobal Riojas Sep 09, 2011 Fully automated machine that proves the concept of automating construction.
ECE 192: NATCAR Team (Triton X) Sponsored by IEEE ( Vincent Bantigue, Joseph Formanes,
EE/CS 481 Spring February, 2008 University of Portland School of Engineering Project Surf Scoter Electronic Ballast for a Fluorescent Lamp Team McGuire,
ECE 192: NATCAR Team (Triton X) Sponsored by IEEE ( Vincent Bantigue, Joseph Formanes,
Smart Lens Robot William McCombie IMDL Spring 2007.
LibA 2016 Intelligent Machine Design Lab Professors: Dr. A. Antonio Arroyo and Dr. Eric M. Schwartz By, Nukul Shah UFID:
Problem Statement The goal of this project is to complete the basic automated functions of the Dream Green putting surface. The objective is to produce.
Omni-Directional Robot Design Presentation Ben Wolf Brent Cornelius Ed Cramer John Grabner James Grabner Advisor & Client: Dr. Nicola Elia.
We thank the Office of Research and Sponsored Programs for supporting this research, and Learning & Technology Services for printing this poster. Miniature.
Lets Begin …. Objective… Cheap System Time Saving Encourage to Plant More Trees Accurate Timing.
UNDERWATER SALVAGE ROBOT PROPOSAL HydroBotics Inc. O CTOBER Luke Karr Erin Fogle Dan Sowa Corbin Kruczek Kyle Zimmerman Will Huddleston Dr. Firas.
The entire system was tested in a small swimming pool. The fully constructed submarine is shown in Fig. 14. The only hardware that was not on the submarine.
CSE 341 Project : Ultrasonic Radar PRESENTED BY: NAME : AKIFA TASNEEM ID : SECTION: 02 1.
IEEE ROBOTICS Sponsored By: Texas State IEEE Chapter
Robot Control Through 3-D Application
Protective Crane Design
Intracranial Pressure Monitor
Project Proposal: 3D Robotic Arm Continuation
Project Proposal: 3D Robotic Hand Continuation
BASIC ELECTRONICS & ROBOTICS Instructor: Humayun Rashid Raahat
Instrumented Walker Status Update 2
The Relay based Multiplexer
Prepared By : wala’ Hamad Khayrieh Homran
Project Renovatio Joshua Fraser Alastair Fraser Ruofei Fu Chao Jiang
Eddie Chan Behnaz Ghouchani Golnaz Ghouchani
ECE477 Senior Design Android Street Car PCB TCSP
Presentation of Robotics (3)
Team Mellon A.D.S. Midway Design Review (MDR) December 3rd, 2015
Modular R.O.V for Sub-Sea Operations
Robot Control Through 3-D Application
ECE 791/792 Project Proposal The Goddard Project.
Wireless Electrocardiogram System Senior Project
Non-Transcranial Electroanesthesia Device
Underwater Remotely Operated Vehicle ( )
After service guide for changing PCB
Project Grey Wolf Digital CMOS “Memory” Game
Presentation transcript:

UNDERWATER SALVAGE ROBOT PRB III HydroBotics Inc. F EBRUARY 15, 2016 LUKE KARR ERIN FOGLE DAN SOWA CORBIN KRUCZEK KYLE ZIMMERMAN WILL HUDDLESTON ADVISORS: DR. FIRAS HASSAN DR. JOHN DAVID YODER

Previous Work Completed design of the robot body and arm Outlined the control system Ordered parts and stock material Initial vision and sensor testing

Progress Since the Last PRB Vision and Sensors Continued vision and sensor testing Began wiring the entire robot System Integration Completed wiring of microcontrollers Finished program and tested it Arm and Body Design Worked in the shop on arm and body Assembled robot body and began arm assembly

Wiring Power Junction BotBoarduino Motor Controllers Light Junction Camera Light Motor Fish Finder Monitor Raspberry Pi DC to DC Converter Battery Transducer Controller Black Box

Motor Control Successfully integrated the new microcontroller with original four motor controllers. All seven motors can be powered forward/backwards from the ps2 controller input. Wired all internal components of the black box. Microcontroller Motor Controller Motor Controller Motor Controller Motor Controller Power Junction

Body and Arm Completion Body Constructed Arm Machining Progress

Testing Camera and Light ◦Water proof ◦Compatibility Fish Finder ◦Function Arm Wiring and programming

Conclusion/Future Work Made a lot of progress from our last PRB Have a fully functional robot by end of February Begin testing as soon as possible ◦Waterproofness, Functionality, Buoyancy, Efficiency Make changes to the prototype as necessary to perfect it Finish testing and have a successful robot by the end of March