Nunavut Water Board Public Hearing Rankin Inlet, Nunavut May 18-19, 2010 Water License #3BM-GRA----, Government of Nunavut, Dept. of Community and Government.

Slides:



Advertisements
Similar presentations
Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
Advertisements

Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
The role of information in water-related decision making.
NIRB Public Hearing on Condition 32 of the Meadowbank Project Certificate No. 004 Baker Lake – April 28, 29, 30 Presentation to NIRB by the Government.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
HATCH ACRES MEADOWBANK GOLD PROJECT REVIEW OF CUMBERLAND’S FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS) Submission to Nunavut Impact Review Board (NIRB)
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
Hamlet of Rankin Inlet Type A Water Licence Application Role of Fish Habitat Management Fisheries and Oceans Canada Eastern Arctic Region Rankin Inlet.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
NUNAVUT IMPACT REVIEW BOARD Targeting Increased Effectiveness in a Changing Landscape Nunavut Mining Symposium, Iqaluit, April 17, 2012.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
1 Pre-Hearing Conference November 6-10, 2011 Submissions of BIM on Process Issues.
Mineral Development Advisory Group (MDAG) Hope Bay Project &Doris North Newmont Mining Corporation Mineral Development Advisory Group (MDAG) Hope Bay Project.
Nunavut Water Board (NWB) NWB’s Community Session Presentation for Type “A” Licence 1AR-NAN0914 Renewal-Amendment Application 1 October 8 - 9, 2014 Public.
Kiggavik Project Final Hearing Presentation
Nunavut Water Board (NWB) Community Presentation Type “A” Water Licence Process for Baffinland Iron Mines Corporation’s (BIMC) Mary River Project Community.
Nunavut Water Board (NWB) Water Licensing Process for Jericho Mine Project Water Licence Renewal Application June 20, 2011 Community Meeting.
Nunavut Water Board (NWB) Water Licensing Process Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut,
November 2008 Eureka Facilities Meeting. Introduction.
Government of Nunavut Department of Environment Environmental Protection Division Intervention to the Nunavut Water Board City of Iqaluit Water License.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Presentation to Final Hearing Baffinland Iron Mines Corporation Mary River Project Type A Water Licence Application Nunavut Water Board Final Hearing Pond.
Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)
Disclosure of Preliminary Screening to MVEIRB In Nunavut all screenings are conducted by the Nunavut Impact Review Board (NIRB). NIRB conducts screening.
Nunavut Integrated Community Infrastructure Sustainability Plans CGS & Aarluk Consulting Presentation to the Nunavut Economic and Sovereignty Infrastructure.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006.
Environment Canada’s Intervention on the Mary River Project Water Licence Application Nunavut Water Board Final Hearing Pond Inlet, NU Mark Dahl / Anne.
Community Presentation Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut, Community and Government.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
Environment Canada’s Mandate and Role in the Mary River Project Review Water Board Community Meetings - Baffinland Pond Inlet, NU Mark Dahl / Anne Wilson.
Proposed Amendment to Project Certificate (Condition 32) Meadowbank Private Access Road INAC's Comments to NIRB Baker Lake, Nunavut [ April 28-30, 2009.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
Solid Waste Management Plans Update Webinar Training March 5, 2014.
Mineral Development Advisory Group. To represent the interests of Kitikmeot Inuit by protecting and promoting our social, cultural, political, environmental.
Review of Interventions ____________ CanZinco Ltd.
Northern Projects Management Office in Nunavut Nunavut Mining Symposium April 2012.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Preliminary Analysis of an Evolving Issue Inert Disposal Sites and Permits Background  Definitions  Non-Traditional Facilities  LA Sites  New Information.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Agenda  Opening Remarks - NIRB  NIRB Presentation: NLCA Reconsideration of the Meadowbank Gold Mine Project Certificate  General questions on.
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
1 BIOSOLIDS CONTRACT AWARD Utilities Department Orange County Board of County Commissioners February 1, 2011.
Doris North Gold Mine Project Presentation to the Nunavut Water Board Technical Meeting Cambridge Bay, NU January 28-29,
Low-Level Radioactive Waste Forum Spring 2016 Meeting – Park City, UT
Nunavut Water Board Public Hearing
Agnico-Eagle Mines Ltd
Phase 2 Hope Bay Belt Project
Low-Level Radioactive Waste Forum Spring 2017 Meeting – Denver, CO
Nunavut Water Board Technical Meeting & Pre-Hearing Conference
Nunavut Impact Review Board NIRB’s Role in Marine Management
Recent Changes to Nunavut’s Regulatory System
Indigenous and Northern Affairs Canada Leveraging Infrastructure Funds
Kitikmeot Inuit Association
Phase 2 Hope Bay Belt Project
Meadowbank Water License Renewal
Environmental Assessment and Licensing (EAL) in Manitoba
Solid Waste Department Rate Stabilization Plan Recommendation
New Enrollment and Transfer Students
Regional Environmental Health Specialist
Agnico Eagle Mines Ltd.’s Whale Tail Pit Expansion Project
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Nunavut Water Board Public Hearing Rankin Inlet, Nunavut May 18-19, 2010 Water License #3BM-GRA----, Government of Nunavut, Dept. of Community and Government Services Hamlet of Rankin Inlet, Kivalliq Region, Renewal Application

Outline  INAC Roles and Responsibilities  INAC’s Areas of Concern - Water Use/Lake Drawdown - Outstanding Issues related to Application - Sludge Management - Water Quality Monitoring and Reporting  Summary  Questions

INAC’S Role and Responsibility in Municipal Water License Reviews  INAC’s regulatory responsibilities for waters management involve participating in the Nunavut Impact Review Board’s (NIRB) and the Nunavut Water Board’s (NWB) procedures for environmental assessment and water licensing.  INAC participates in the water licensing process led by the Nunavut Water Board as a party with interest in conserving and protecting Nunavut’s freshwater Resources.  INAC’s participation in these activities includes: 1)Reviewing and assessing water-related applications, reports, studies and designs. 2)Providing recommendations and technical advice to the NIRB and NWB on projects involving water. 3)Monitoring the compliance of water license holders with the terms and conditions of their license.

INAC’s Areas of Concern  Water Use/Lake Drawdown  Outstanding Issues related to the Application  Sewage/Sludge Management  Water quality monitoring and Reporting

Water Use/Lake Drawdown  The previous (expired) license #3BM-GRA0207 allowed for an annual quantity of water use not to exceed 400,000 m 3 /year.  The proponent is seeking to increase the allowable water use to 850,000 m 3 /year.  Current daily water use is 2,400 m 3 /day (reported from 2008).  Annual water use 876,000 m 3 /year (calculated from daily use).  Permitted use of 400,000 m 3 /year (water license).  Amount of water going into Nipissar Lake 314,000 m 3 /year.

Water Use/Lake Drawdown cont.  A Bathymetric Study, was carried out by the Department of Natural Resources Canada, Nunavut Research Institute and the Department of Community and Government Services, on Nipissar Lake in the summer of  This is a study of how much water a lake can hold. In this case Nipissar lake.  This study found that the lake contains (holds) almost 2.9 billion litres of water.  The study also included historical data which indicated that the lake has decreased from almost 3.5 billion litres in 1994 to its current level of almost 2.9 billion litres in This is a decrease of almost 600 million litres.  In a letter dated November 24, 2009 from Mr. Wayne Thistle to the Nunavut Water Board. Mr Thistle indicates that it appears that Nipissar Lake has dropped 2.5 feet.  Also Mr. Ralph Ruediger at the April 19, 2010 teleconference indicated that the water intake at Nipissar Lake had to be lowered because of apparent lower water levels of the lake.

 The proponent has indicated that other studies into the sustainability of Nipissar Lake as an adequate water source for the Hamlet of Rankin Inlet are on-going and that these studies will be complete by Dec 31,  The GN has also recognized that there may be a need for additional or alternate water sources.  All current data that has been gathered so far indicates that Nipissar Lake is being drawn down (lowered) and can no longer support the continuing growth of the Hamlet of Rankin Inlet.  Given that there appears to be drawdown of the lake, INAC supports the need to secure an additional water source.  With this being said, INAC recommends that the proponent be given an approval of a water license for one year. Water Use/Lake Drawdown cont.

Outstanding Issues Related To The Application  Throughout the renewal process the proponent was advised about errors and omissions with the renewal application and associated operation and maintenance plans. The revised operation and maintenance plans have recently been placed on the NWB public website.  It was also agreed upon by all parties, at the April 19 th teleconference, that the proponent could re-submit the renewal application and applicable plans at the public hearing held on May 18 and 19, 2010.

 In the Renewal Application it states that sewage sludge from the sewage treatment facility is disposed of at the Hamlet of Rankin Inlet’s Solid Waste Facility (landfill) at a rate of 1 m 3 /week (1000 Litres).  A written agreement, between the Hamlet and the GN, should exist to allow for the disposal of the sewage sludge at the Hamlet’s Solid Waste Facility.  Another concern is that the sewage sludge produced is being disposed of at an unapproved (unlicensed) facility. The landfill currently does not have an approved water license. Sewage/Sludge Management

Water Quality Monitoring and Reporting  As part of any water license, water quality monitoring and reporting are required as per the conditions of the water licence. In the past these conditions were met sporadically.  INAC recommends that more diligence must be given to fulfilling the terms and conditions of the water license.

Summary  INAC’s responsibility is for the conservation and protection of freshwater resources in the Territory.  INAC’s primary concern is with water use and the drawdown of Nipissar Lake.  The data suggests that at the current rate of water use, Nipissar Lake is not an adequate water source for the growing Hamlet of Rankin Inlet.  Revisions of the water license application are to be presented at the public hearing.  Sewage sludge has to be disposed of at an approved licensed facility, with the necessary written agreements in place.

Questions?

Thank you - Qujannamiik - Koana