18 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Spoilage, Rework, and Scrap Chapter 18.

Slides:



Advertisements
Similar presentations
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Spoilage, Rework, and Scrap Chapter 18.
Advertisements

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Process Costing Chapter 17.
Process Costing Chapter 17.
Spoilage, Rework, and Scrap
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Key T-Account: FIFO Work in Process Inventory, Assembly Beg.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 4.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Constant Gross-Margin Percentage NRV Method Step 2: Deduct.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Spoilage, Rework, and Scrap Chapter 18.
Chapter 6: Process Costing
Cost Management Chapter 6 Process Costing
Kinney ● Raiborn Cost Accounting: Foundations and Evolutions, 8e © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Order Costing Chapter 4.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Summarize Total Costs (Step 4) Work in process beginning inventory:
CHAPTER 18 Spoilage, Rework, and Scrap To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education. All rights.
CHAPTER 17 Process Costing To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education. All rights reserved.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
Copyright © 2015 Pearson Education, Inc. All Rights Reserved. Spoilage, Rework, and Scrap.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Process Costing.
Process-Costing Systems
Blocher,Stout,Cokins,Chen, Cost Management 4e ©The McGraw-Hill Companies 2008 Process Costing Chapter Eleven.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6 Process Cost Accounting
© 2012 Pearson Prentice Hall. All rights reserved. Spoilage, Rework, and Scrap.
© 2012 Pearson Prentice Hall. All rights reserved. Process Costing.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
21 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Process Cost Chapter 21.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Job-Costing and Process-Costing Systems.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 8 Process-Costing Systems.
19-1 P ROCESS C OST S YSTEMS CHAPTER F Used for production of small, identical, low-cost items. F Mass produced in automated continuous production.
Principles of Cost Accounting, 16th Edition, Edward J
The Islamic University –Gaza
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Four Systems Design: Process Costing.
Fixed Overhead Variance Spoilage, Rework and Scrap
Spoilage, Rework, and Scrap Dr. Hisham Madi. Inspection Points and Allocating Costs of Normal Spoilage  Although spoilage is typically detected only.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Cost Allocation: Joint Products and Byproducts.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Costing Key Topics: Cost flows in mass production
4-1 Chapter Four Systems Design: Process Costing.
Chapter 18 Process Costing
© 2012 Pearson Prentice Hall. All rights reserved. Spoilage, Rework, and Scrap.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall. Process Costing Chapter5 1.
Process Costing Dr. Hisham Madi. Case 3: Process Costing with Some Beginning and Some Ending Work-in-Process Inventory.
Management Accounting BA213 Michael Dimond. Michael Dimond School of Business Administration Costing Methods Process Costing Job Costing Activity-based.
The Islamic University –Gaza
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
© 2009 Pearson Prentice Hall. All rights reserved. Spoilage, Rework, and Scrap.
© John Wiley & Sons, 2011 Chapter 6: Process Costing Eldenburg & Wolcott’s Cost Management, 2eSlide # 1 Cost Management Measuring, Monitoring, and Motivating.
Costing Systems (Job, Batch, Service & Process Costing)
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Process Cost Accounting General Procedures
© The McGraw-Hill Companies, Inc., 2007 McGraw-Hill /Irwin Systems Design: Process Costing Chapter 4.
CHAPTER 6: PROCESS COSTING Cost Management, Canadian Edition © John Wiley & Sons, 2005 Chapter 6: Process Costing Cost Management, Cdn Ed, by Eldenburg.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 8 Process-Costing Systems.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Chapter 17.
Process-Costing Systems Chapter Recognize when process-costing systems are used 2. Describe four key steps in process-costing 3. Explain equivalent.
Spoilage, Rework, and Scrap 1. Learning Objective 1 Distinguish among spoilage, rework, and scrap. 2.
Spoilage, Rework and Scrap 1 Lecture 24 Readings Chapter 18,Cost Accounting, Managerial Emphasis, 14 th edition by Horengren.
Chapter 11 Process Costing. Chapter 11 Process Costing.
Chapter 6 Process Costing
Job-Costing and Process-Costing Systems
Available NOW at your campus bookstore!
Foundations and Evolutions
Chapter 18 Spoilage, Rework and Scrap
CHAPTER 4 Job Costing Chapter 18 Spoilage, Rework, and Scrap
CHAPTER 17 Process Costing Spoilage, Rework, and Scrap.
Chapter 6 Process Cost Accounting
Principles of Cost Accounting 15th edition
Presentation transcript:

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Spoilage, Rework, and Scrap Chapter 18

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 1 Distinguish among spoilage, rework, and scrap.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Terminology Spoilage refers to unacceptable units discarded or sold for reduced prices. Rework is units that are repaired. Scrap is material left over.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 2 Describe the accounting procedures for normal and abnormal spoilage.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Normal Spoilage Normal spoilage is spoilage that is an inherent result of the particular production process and arises even under efficient operating conditions. Normal spoilage rates should be computed using total good units completed as the base, not total actual units started in production.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Abnormal Spoilage Abnormal spoilage is spoilage that should not arise under efficient operating conditions. Companies record the units of abnormal spoilage and keep a separate Loss from Abnormal Spoilage account.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Process Costing and Spoilage Example Big Mountain, Inc., manufactures skiing accessories. All direct materials are added at the beginning of the production process. In October, $95,200 in direct materials were introduced into production. Assume that 35,000 units were started, 30,000 good units were completed, and 1,000 units were spoiled (all normal spoilage).

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Process Costing and Spoilage Example Ending work in process was 4,000 units (each 100% complete as to direct material costs). Spoilage is detected upon completion of the process. Spoilage is typically assumed to occur at the stage of completion where inspection takes place.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Process Costing and Spoilage Example Approach A recognizes spoiled units when computing output in equivalent units. Approach B does not count spoiled units when computing output in equivalent units.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Approach A Example Costs to account for$95,200 Divide by equivalent units 35,000 Cost per equivalent unit$ 2.72 Good units completed: 30,000 × $2.72$81,600 Add normal spoilage: 1,000 × $2.72 2,720 Costs of good units transferred out$84,320 Work in process: 4,000 × $ ,880 Costs accounted for$95,200

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Approach B Example Costs to account for$95,200 Divide by equivalent units 34,000 Cost per equivalent unit$ 2.80 Good units completed: 30,000 × $2.80$84,000 Costs of good units transferred out$84,000 Work in process, ending: 4,000 × $ ,200 Costs accounted for$95,200

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 3 Account for spoilage in process costing using the weighted-average method.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Weighted-Average: Spoilage The following example is for the month of November and relates to Big Mountain, Inc. Direct materials are introduced at the beginning of the production cycle. Conversion costs are added evenly during the cycle.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Weighted-Average: Spoilage Normally the spoiled units are 2% of the output. Assume that Big Mountain, Inc., had 1,000 units in the beginning work in process inventory, 100% complete for materials ($9,700), and 60% complete for conversion ($10,000).

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Weighted-Average: Spoilage Ending work in process inventory was 4,000 units (100% materials and 20% conversion). Costs added during the month were $87,500 for materials and $72,000 for conversion. What are the costs assigned to the units completed, spoiled, and in ending work in process inventory?

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Physical Units (Step 1) Work in process, beginning (November 1) 100% material, 60% conversion costs 1,000 Started during November:35,000 36,000 Good units completed and transferred out:31,000 Work in process, ending inventory: 100% material 20% conversion costs 4,000 35,000

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Physical Units (Step 1) What is the number of spoiled units? 36,000 – 35,000 = 1,000 What is the normal spoilage? 31,000 × 2% = 620 What is the abnormal spoilage? 1,000 – 620 = 380

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Compute Equivalent Units (Step 2) Materials Conversion Completed and transferred31,00031,000 Normal spoilage Abnormal spoilage Ending inventory 4, Equivalent units36,00032, %20%

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Compute Equivalent Unit Costs (Step 3) Materials Conversion Beginning inventory$ 9,700$10,000 Current costs 87,500 72,000 Total$97,200$82,000 Equivalent units 36,000 32,800 Cost per unit $2.70 $2.50

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Summarize Total Costs (Step 4) Work in process beginning inventory: Materials$ 9,700 Conversion 10,000 Total beginning inventory$ 19,700 + Current costs: Materials $87,500 Conversion 72,000 = Costs to account for$179,200

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Good units completed and transferred out (31,000 units): Costs before adding normal spoilage: 31,000 × ($ $2.50) $161,200 Normal spoilage: 620 × ($ $2.50) 3,224 Total$164,424

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Abnormal spoilage: 380 × ($ $2.50)$ 1,976 Work in process, ending (4,000 units): Direct materials (4,000 × $2.70)$10,800 Conversion (800 × $2.50) 2,000 Total$12,800

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Costs of units completed and transferred out (including normal spoilage)$164,424 Cost of abnormal spoilage 1,976 Costs in ending inventory 12,800 Total costs accounted for$179,200 The $1,976 cost of abnormal spoilage is assigned to the Loss from Abnormal Spoilage account.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 4 Account for spoilage in process costing using the first-in, first-out (FIFO) method.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Physical Units (Step 1) Work in process, beginning (November 1): 100% material, 60% conversion costs 1,000 Started during November35,000 36,000 Good units completed and transferred out: From beginning inventory 1,000 Started and completed30,000 31,000

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Physical Units (Step 1) Work in process, ending inventory: 100% material, 20% conversion costs4,000 Normal spoilage 620 Abnormal spoilage 380

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Compute Equivalent Units (Step 2) Materials Conversion Good units completed and transferred out: From beginning inventory Started and completed30,00030,000 Normal spoilage Abnormal spoilage Ending inventory 4, Equivalent units35,00032,200

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Compute Equivalent Unit Costs (Step 3) Materials Conversion Current costs$87,500$72,000 Divided by equivalent units 35,000 32,200 Cost per unit $2.50 $2.236* *$2.236 (rounded)

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Summarize Total Costs (Step 4) Work in process beginning inventory: Materials$ 9,700 Conversion 10,000 Total beginning inventory$ 19,700 + Current costs: Materials$ 87,500 Conversion 72,000 = Costs to account for:$179,200

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Good units completed and transferred out: From beginning inventory: Work in process$ 19, Conversion costs added in current period (400 × $2.236) Total$ 20, Started and completed: 30,000 × ($ $2.236)$142,080.00

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Costs before adding normal spoilage: ($20, $142,080.00)$162, Normal spoilage: 620 × ($ $2.236) 2, Total$165,610.72

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Abnormal spoilage: 380 × ($ $2.236)$1, Work in process, ending (4,000 units): Direct materials (4,000 × $2.50)$10,000 Conversion (800 × $2.236) 1,789 Total$11,789

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Costs of units completed and transferred out (including normal spoilage)$165, Cost of abnormal spoilage 1, Costs in ending inventory 11, Total costs accounted for$179, The $1, costs of abnormal spoilage are assigned to the Loss from Abnormal Spoilage account.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 5 Account for spoilage in process costing using the standard-costing method.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Standard-Costing: Spoilage The standard-costing method makes calculating equivalent unit costs unnecessary and so simplifies process costing.

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Journal Entries Assume that the completed units are transferred to Finished Goods. What are the journal entries? Finished GoodsXXX Work in ProcessXXX To transfer good units completed in November

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Journal Entries Loss from Abnormal SpoilageXXX Work in ProcessXXX To recognize abnormal spoilage detected in November

©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster End of Chapter 18