SR 518 Interchange Restoration Pre-Bid Meeting 4/28/16.

Slides:



Advertisements
Similar presentations
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Advertisements

Back to the Future? Electrical/Lighting Contracts Ted Swansegar.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
Consideration of a Temporary Skate Board Park Carpinteria City Council Meeting Agenda Item # 9.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Flexible Pavement Engineering Course Feedback to RPF 10/11 May 2006.
Department of Public Works Arroyo Seco Casting Pond Renovations Contract Award to Mallcraft, Inc.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
PROJECT 123(14) LOR PID INTERCHANGE IMPROVEMENT PARTNERING RE-CONNECT MEETING NOVEMBER 19, 2015.
Clinton Overpasses Clinton, NC 2007
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
March  Finish Joint Sealing on Highlands Ranch Parkway  Finish Grinding on Lucent and Plaza and then Complete Joint Sealing  Start in Late.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Project Overview and Stakeholder Outreach
Asphalt Pavement Training Conference “HMA Mix Designs on the QPL”
Closure of S. Lazona Dr. at Main St.
Runway Rehabilitation: Award of construction contract and acceptance of 3 grants Resolution June 22, 2009.
SPOUSE LEADERSHIP DEVELOPMENT COURSE (SLDC) CLASS 68
June 5, 2017.
Town Center Lease Agreement
K-W’s Kindergarten Calendar Week of September 11th-15th
Department of Water Management Water Supply Update
Visitor Permits.
K-W’s Kindergarten Calendar Week of February 20th-24th
15th Street.
SCPS Elementary School Summer Flex Schedule Notification
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
US26: Cornelius Pass Rd -185th Ave
Malibu Canyon Pole Replacement Project Information
SW Gage Blvd - Street Repair Project
Highest Activity Day: 694 Ops Wednesday May 10
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
CH 42 & TH 13 Construction Update
HOMEWORK This year in room 11, we will have the following homework procedures. The majority of the time, this will ALWAYS be the way the week goes. However,

Contract 60X10 Informational Meeting Weber I-55
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Facility Coordinator Meeting
Work Hours: Monday – Saturday, 5:00 a.m. – 3:30 p.m.
Signal Conditioning.
Back-End Payor Sub-Group

Key PTC Payroll Items.
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
My School Days The first day back is Wednesday.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Day 1: Introduction to Ramp Tools
Signal Operational Review Performance Monitor *
DECEMBER READING LOG Student: When you have read, record your minutes and have your parent initial the proper box (each day). At the end of the month,
Antietam Road Sidewalk
PLAYMATES LEARNING CENTER CALENDAR
ODOT Region 1 Lents Neighborhood
Guidance on Assessment of Liquidated Damages
Utility Relocation: 11th/Mill
Presentation transcript:

SR 518 Interchange Restoration Pre-Bid Meeting 4/28/16

Project Overview SR 518 Interchange Restoration will restore the interchange to its preexisting condition and includes the following: Removal of: temporary traffic signal, signage, lighting, asphalt pavement, drainage and other ancillary items Installation of: TESC, sidewalks, asphalt pavement, lighting, signage, drainage, restoration and other ancillary items

Project Location

Current Ramp Configuration

Preexisting Ramp Configuration

Construction Phase 1

Construction Phase 2

Construction Phase 3

Weekend Ramp Closure Detour

Permits

Supporting Reference Documents SR 518 as-built contract documents WSDOT Standard Plan Project Sheets Monitoring well boring log (included in future addendum)

Contract Work Hours/Closures Standard Day Shift Work Hours: 7:00am- 3:30pm Standard Night Shift Work Hours: 8:00pm – 5:00am Weekend Ramp Closure: Friday 8:00pm – Monday 5:00am Holiday Closures 2016: July 4, Sept 5, Nov 24, Dec 23, Dec 26 Work outside of the standard work hours, can be requested and may be granted by the Engineer.

Liquidated Damages Failure to achieve Substantial Completion Milestone shall be $498 per calendar day Failure to achieve Physical Completion Milestone shall be $498 per calendar day Failure to achieve the Milestone of work associated with the Weekend closure of the On/Off Ramp shall be $300 per 15 minute period prorated to the nearest 5 minutes.