IGT and Shipper Workgroup meeting 28 th February 2011.

Slides:



Advertisements
Similar presentations
Nexus Workgroup Transition Approach Update 8 th January 2014.
Advertisements

Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
PN UNC Workgroup Supply Point Register 25 th October 2011.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
Nexus Workgroup CSEP Transition Topic June
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
PN UNC Workgroup iGT Services 7 th February 2012.
Industry Shipperless &Unregistered Working Group Thursday 17 th September 10:30 at Xoserve.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
1 Industry Shipperless &Unregistered Working Group Wednesday 7th July 10.00am at xoserve.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Connected System Exit Points Options for strategic regime change Chris Warner.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
User Pays User Committee 12th November 2013
Supply Point Register 7th December 2011
Supply Point Register 10th January 2012
Distribution Workgroup 24/11/16
Code Governance Review UNC Modification Proposals
Introduction of Code Contingency Guidelines Document
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Must Read Process Guide For Shippers
PAF Risk Register and PARR mapping
PN UNC Workgroup iGT Services
Modification th July 2008.
Connected System Exit Points Administration Options
Project Nexus Workgroup
CSEPs Reconciliation Proposals
Exit Capacity Substitution and Revision
Consideration of issues raised by UNC Modification Proposal 0244
Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Connected System Exit Points Administration Options
MOD 258A Demand Estimation Sample Point – Shipper Report.
UNC Modification Proposal 0362
Industry Shipperless & Unregistered Working Group
Proposer: Marie Clark, ScottishPower Panel Date: 7 February 2014
PN UNC Workgroup iGT Services
Project Nexus Workgroup
Introduction of Code Contingency Guidelines Document
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
AUG Query Responses 21st November 2013.
Connected System Exit Points - Update
Consideration of issues raised by UNC Modification Proposal 0244
Options for the Development of a Demand Side Response Mechanism
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Deferral of Retrospective Updates Functionality
M Number Creation process
PN UNC Workgroup iGT Services
Modification 421 – Updates and Benefits Case
UNC Modification Performance Assurance Framework Incentive Regime
Implementation Approach Distribution Workgroup – June 2014
Modification 440 Project Nexus iGT Single Service Provision
Industry Shipperless & Unregistered Working Group
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

IGT and Shipper Workgroup meeting 28 th February 2011

Shipperless & Unregistered Industry Workgroup - Background Xoserve chair an industry Shipperless and Unregistered Workgroup and for the last 12 months this group having been looking at root causes that contribute to sites without a registered user. Over 15 root causes have been discussed, one of which was the creation of sites on UK Link that are in fact IGT sites. A draft report is due to be published for comment at the next Shipperless and Unregistered meeting planned for the 6 th April, this will provide recommendations following the 15 root cause discussions. All details of these meetings are published on the Joint Office website:

Preliminary recommendations regarding the prevention of creating IGT sites on UK Link: Xoserve are presently conducting a trial of a DN’s mapping system to understand the benefits in identifying possible IGT sites/areas contained within a specific Network. This trial was originally adopted for UIP requested MPRN creations only. Subsequent analysis of IGT sites removed from UK Link this year however, indicated that all requests to create an MPRN on UK Link had been generated following a shipper request. This activity has therefore, been rolled out to other teams within Xoserve to review. Xoserve check the IAD system for IGT information as a validation for the M Number Creation Process. In order to ensure this proves an effective method, it has therefore been recommended at the industry meeting that IGT’s update their SCOGES (Single Centralised portfolio on a more regular frequency and at the soonest available opportunity within the process). Recommendations have been raised for shippers to adopt a best practice template containing system options and questions that should be asked of consumers. This will assist in identifying IGT sites and prevent requests being submitted to create them on UK-Link One of the recommended questions was for shippers to ask consumers for information from the label on their pipe work and that if it was identified the MPRN began with a 7 it would indicate an IGT pipe work. Further analysis has signified however, that not all IGT’s are labelling pipe work. A recommendation is therefore being put forward that IGT’s should also be part of the request to review the entire governance arrangements on labelling paperwork. If anyone has any questions please send them to Shipperless and Unregistered Industry Workgroup

MOD 0362 and iGT UNC

CSEP NExA (Annex A Part 5) requires iGTs to issues reconciliation volumes to the upstream Distribution Network CSEP NExA and iGT UNC (iGT UNC E11) restricts the meter readings that can be utilised for reconciliation to “Valid Meter Readings” “Valid Meter Readings” (iGT UNC E1.4) do not include estimated Opening Meter Readings provided by the iGT (iGT UNC E6.8) Agreed Opening Meter Readings (iGT UNC E6.5) iGTs and Users have highlighted this as a key reason why there is a lack of reconciliation volumes submitted in respect of CSEP Larger Supply Points. risks associated with unreconciled energy and Transportation charges Overview

“Valid Meter Readings” (UNC TPD M3.1.4) do not include estimated (‘notional’) Opening Meter Readings provided by the DN (UNC TPD M3.8.5) Agreed Opening Meter Readings (UNC TPD M3.8.7) However estimated Opening Meter Readings can be used for Individual NDM Reconciliation (UNC TPD M3.8.5(a)); and Agreed Opening Meter Readings can be used for Individual NDM Reconciliation (UNC TPD M3.8.8(c)) UNC Terms for DN Connected Supply Points

UNC Modification Proposal 0362 Proposes to extend scope of Meter Readings eligible to be utilised to generate reconciliation volumes. In addition to ‘Valid Meter Readings’: Estimated Opening Meter Readings; and Agreed Opening Meter Readings Would be consistent with UNC terms Proposal was considered by UNC Modification Panel on 17 February 2011 Determined to be subject to ‘self governance’ (UNC Modification panel will determine whether to implement) UNC Modification Panel determination expected 16 June 2011 Referred to Distribution Workgroup for assessment (to report to UNC Modification Panel in April 2011) Proposed Change to CSEP NExA Annex A Part 5

iGT UNC potentially inconsistent with prevailing UNC terms and proposed CSEP NExA Annex A Part 5 terms DNs unable to initiate change to iGT UNC Request to iGT UNC parties to consider the points raised and whether pursuit of an appropriate iGT UNC change is required iGT UNC Alignment

As at January ,995 live LSP LMNs 1,569 (39%) with some reconciliation activity 2,426 (61%) with no reconciliation activity 6,159 closed LSP LMNs 3,238 (53%) with some reconciliation activity 2,921 (47%) with no reconciliation activity How much additional energy / periods could be reconciled if estimated Opening Meter Readings and Agreed Opening Meter Readings could be used for reconciliation? Both UNC 0362 and the potential reflective iGT UNC Proposal would be enhanced by quantification of this benefit Benefits