F. Peauger - CEA DSM IRFU SACM 18 May 2008 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
RF Synchronisation Issues
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
CERN klystron test stand – CLIC Workshop, Oct page 1 F. Peauger High-Power RF Test Areas: Design & Planning Progress of the CERN Klystron Test Area.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
RF Synchronization, control and stability Takuya Natsui.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
High Power RF for CALIFES
30 GHz waveguide line modification towards 12 GHz.
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
Providing Beams for Power Production What has been done Problems and Boundary Conditions Future improvements and possibilities.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Anders Sunesson RF Group ESS Accelerator Division
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
17th July 2008#4-CTF3 Committee1 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG 0225CA.SNG.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
F. Peauger19th June #3-CTF3 Committee1 CALIFES STATUS CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 CEA SACLAY CLIC R&D Activities F. Peauger, A. Hamdi, M. Desmons, W. Farabolini, P. Girardot.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Areal RF Station A. Vardanyan
Cavity BPM for CALIFES C. Simon, M. Luong, D. Bogard, W. Farabolini, J
CALIFES A proposed electron beam test facility at CERN
CTF3 PROBE BEAM LINAC COMMISSIONG AND OPERATIONS
Bruno POTTIN, Anne-Catherine CHAUVEAU
Cryomodule test stand at ESS site
Phil Oxford , june 18 Photoinjector at.
Status and progress of the CTF3 probe beam
CTF3 Collaboration Board May 2009 G.Geschonke
Progress and Status of X Band Stand Alone Power Source (SAPS) at CERN
An X-band system for phase space linearisation on CLARA
CLEX* Status and Plans CTF3 complex CLEX
by P. Musumeci and F.Tazzioli
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Chris Adolphsen Sergei Nagaitsev
Why are we removing our very good gun?
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
SPARC RF gun status by P. Musumeci Review committee
DC Injector and Space Charge Simulation Status
9/10/2018 News on operation Second commissioning phase from 30th of March to 9th of April Aline Curtoni, Claire Simon, Franck Peauger, Wilfrid Farabolini.
Electric Field Amplitude (MV/m)
LCLS Injector: Introduction D. H
CEPC RF Power Sources System
Advanced Research Electron Accelerator Laboratory
RF Pulse Shaping.
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
CLIC Feasibility Demonstration at CTF3
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Operational Experience with LCLS RF systems
Two-beam Test-stand Design and Construction Status
ACCSYS Collaboration Board Triestre, 3rd october 2017
Presentation transcript:

F. Peauger - CEA DSM IRFU SACM 18 May 2008 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG 0225CA.SNG 0230CA.SNG 0250 CA.BPM 0240 CA.BPM 0260 CA.BPM 0310 CA.BPM 0380 CA.DHG/DVG 0245CA.DHG/DVG 0265CA.DHG/DVG 0320CA.DHG/DVG 0385CA.DHB/DVB 0270 CA.ICT 0210 CA.VVS 0300 CA.QFD 0350CA.QFD 0360CA.QDD 0355 CA.BPR 0370 CA.BPM 0410 CA.MTV 0390 CA.MTV 0420 CA.VVS 0500 CA.SDH 0340 CA.DHB/DVB 0230CA.DHB/DVB 0250 ACS 0230ACS 0250ACS 0270 DUM 0450 TBTS ITL CA.MTV 0125 (virtual cathode) CA.FCU 0430 #1 – CTF3 Committee: CALIFES STATUS

F. Peauger - CEA DSM IRFU SACM 18 May 2008 Intense activity since several months Alignment is more difficult than expected: Future plans: Before week 20: vacuum break by CERN Week 20 and 21: (CEA team at CERN) - disassembly of elements between gun and LIL1 including BPM n°1 for realignment (errors found between CERN and CEA alignment data) - disassembly of all BPM-DHG/DVG, MTV supports for alignment investigation Objective: sealing and vacuum pumping of the whole linac end of w21 →Need close support - from CERN Vacuum group - from CERN Alignment team during and May Beam line installation (including laser transport line) and Alignment ICT 0210 MTV 0215 Electron beam Gun LIL1

F. Peauger - CEA DSM IRFU SACM 18 May 2008 The bakeout of the gun must include the RF waveguides and can include some elements after the valve if necessary Photo-injector Bakeout Attention: Temperature must be limited around MTV 0215 MTV 0215 Valve VVS 0200 RF Gun cavity

F. Peauger - CEA DSM IRFU SACM 18 May 2008 Command-Control, BPM and Laser system Command/Control: Intense activity on C/C for the three next months particularly for BPM BPM: Electronic chassis installed in CLEX-G (see picture) Laser system: Energy per pulse two low → not possible to work on the pulse shaping Beam delivery from Laser room to CLEX-A laser table validated (transport under vacuum along 60 meters)

F. Peauger - CEA DSM IRFU SACM 18 May 2008 Circular phase shifter Mode convertor: Brazing test on a scale one prototype succeeded → OK to start the two final convertors → scheduled for end of 2008 Circular sliding waveguides: → non conformity (turning) before brazing for few pieces → negotiations with supplier

F. Peauger - CEA DSM IRFU SACM 18 May 2008 High Voltage Modulator Second step of the acceptance test with PPT High power load, bidirectional coupler, Low Level RF system including Peak Power meter and mixer to measure more precisely the voltage ripple and pulse-to- pulse stability (Jitter) Ripple = ±0.3% Jitter = ± 0.2% (Measured at 270kV, 280A, 32MW, 3.3Hz at sat.) → Acceptable values for CALIFES Successful collaboration Before PFN tuning After PFN tuning