1 ATLAS Upgrade WP4 Face to Face meeting Sheffield 25 th August 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Introduction CNC (Computer Numerical Control) Machines are automated machines, which uses programs to automatically execute a series of machining operations.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Orbital Welding Development
Cooling connections in the service gap Richard French The University of Sheffield.
WP4 cooling update RAL 6 th Oct Welding – high repeatability statistics Bending – 2.275mm OD trials in Titanium with comparison of 1.8” OD bend.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool June 2012 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
1 ATLAS Upgrade WP4 Face to Face meeting at Edinburgh - 11 th Jan 2011 WP4 task 2: Cooling activities Richard French – The University of Sheffield.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Cooling loops for prototype staves Update on cooling pipes progress Confirmation of design of loop Discussion on design developments of loops for future.
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
1 QMUL Face to Face Meeting 2/2/2012 Richard French, Paul Kemp-Russell, Hector Marin-Reyes (Sheffield) John Matheson, Martin Gibson, Ian Wilmut (RAL) Ian.
WP4 – Plans for next 6 months
1 Overview Stainless Steel to Titanium joining (temp connection) Copper to Titanium (pressure drop measurements) ATLAS Upgrade dissimilar metal joining.
1 ATLAS Upgrade WP4 Face to Face meeting QMUL 9 th May 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
Pipe cutting & Etching Ian Mercer, Harold Fox, Richard French RAL WP4 Face to Face meeting 20 th March 2012.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool 10 th November 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
WP4 Face to Face #6, Oxford 14 th July 2011 Welding summary Richard French – The University of Sheffield.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
S A Griffiths CM42 June 2015 Electrical & Control.
1 ATLAS Upgrade WP4 Face to Face meeting Oxford 14 th May 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John.
Chris Booth Sheffield 29th March 2006
ATLAS Internal ID Service Integration
DT-LHCb coordination meeting 18 April 2016
Feedback on transfer line sizing and flow calculations for UT
Final CALICE OsC meeting: Status and summary of project
UK Knowledge of Pipe Bending and Pressure Testing Martin Gibson (RAL) Pipe bending by Ian Lancaster University Connector welding by.
Detector building Notes of our discussion
Service channels between Tracker and PP1
Ti/SS transitions A.Basti INFN-PISA*
Service channels between Tracker and PP1
Pipe Bending Ian Mercer, Harald Fox, Richard French.
LARP Phase II Secondary Collimator RC1
Complementary ISTC Projects #3888, 3889p
Flexible lines production and planning
LARP Phase II Secondary Collimator RC1
Future tube procurement Richard French
Cooling loops for prototype Staves
Mechanics: (Tim).
WP4 – Plans for next 6 months
Services Layout – Update
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
update on UT cooling system
Presentation by: Paul Kemp-Russell.
ATLAS UK-Upgrade WP7 LMT Automated Manipulation Testing
Hybrid & Module Testing Status
Perugia SuperB Workshop June 16-19, 2009
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

1 ATLAS Upgrade WP4 Face to Face meeting Sheffield 25 th August 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson, Ian Wilmut RAL, Georg Viehausser- Oxford Cooling update task 2

Next few months view 1.6 &1.2m long objects Pressure drop measurements Alexander Bildatze (GLA/CERN)- components ready to go. Some at CERN. Manufacture of 2mm ID Ti circuits and qualification ongoing. Lancs bending trial good and formers from Sheffield ok– Testing on 2.275mm slot drills proved swarf removal issues, now at precision grinder for secondary angle alteration. Re- stock of cooling circuits and stavelet circuits. Include pressure testing etc. IM made lots. Material reduction & welding. Raw material price of Titanium has increased dramatically (also purchased in € so currency difference is a factor). Monitoring this as when to purchase more. Need to establish what we want? Personally unhappy with the unusual OD of the IBL tube, will show a plot of each decimal point accuracy v cost and time (next WP4 as not essential but proving a point). Scratch start weld head tests at CERN end Sept. Ti procured (similar to ours). RF, DF, GM. Weld head development Now have some access to next generation weld head, testing will be done on 2.275mm Ti – long lead times. 4H smaller weld head purchased. Statistical trial for repeatability of welds. Electrode type & profile Testing 5 electrode types borrowed from Rolls Royce. Not sure if these are making any difference, need to establish test. Weld head temperature measurement is in progress. Currently burning sensors. IR camera and mirror idea needs trying out. Need to work out how to calibrate arc temp to head temp reliably. Possibly change to manual torch on M200 to enable clear view of what the arc profile looks like (faster results) Fittings Vac brazed stubs ready for manufacture (6LV VCR to Ti interface for welding) ready to collect. CP2 ti fittings – material sourced from Sandvik. Need to check cost out v custom fitting from Swagelok or Fti plus the effort put in at QMUL. Re-manufacture of 6LV VCR thin wall fittings as run out. Thermal shock etc in the pipe line at some point. 2

Plans for AUW Comprehensive data set for 316L orbital welding.... To finish and sign off as a viable material with joining system for ATU Weld testing data is a must as thin. Chip testing with welding, ABCN-13, FE-I4 with USBPix, (possible alternative head test results if time) We still do not have a representative structure for tests. 3

Previous Status Update on sub tasks From weekly meetings Thermal shock work waiting for drawings, may need to re-think as dropped right off list. Weld head mods at Sheffield – have new small weld head on loan from manufacturer. Have constructed digital IO to analogue IO module to interface to M200. Not tested yet. Bending to continue at Lancs – need to finish a welded service duct. Production of cooling circuits and stavelet circuits in all materials to production list from RF. Welding tests with scratch start orbital head to be done at CERN with RF, DF and GM in June. This is only compatible with 8mm tube as weld head is a monster to accommodate cam mount of electrode. Could be made smaller. From QMUL FtoF IBL Ti joint order on hold as final diameter and wall thickness is not yet decided. Once this is done then we will contribute to a joint Ti order. FEI4 chip using USB-PIX readout will be done at RAL late June. Weld head temperature measurement is in progress. Currently burning sensors. Need to work out how to calibrate arc temp to head temp reliably. 6LV stainless to CP2 Ti 1/8” stalks ready to collect from vac brazing – need to pay. In-situ tube cutting and preparation with powered tooling – working prototype from Lancs. 4 New M200 welding software is subtly different to previous version. Initial start arc better but arc ramp down is worse causing problems for Ti. Not yet resolved as unbelievably tricky.