S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Energy spectrometer cavity BPM Royal Holloway, University of London S. Boogert, G. Boorman University of Cambridge M. Slater, M. Thomson & D. Ward University.
LCABD WP 4.2 Review, 12 th April Mark Slater  Motivation  BPM and Electronics Development  BPM Simulation  Update on NanoBPM Progress  Update.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
NanoBPM schedule California Institute of Technology Toyoko Orimoto Cornell University Robert Meller DESY Vladimir Vogel KEK Hitoshi Hayano, Yosuke Honda,
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
12/12/04 1 Stewart Boogert (UCL) Second Mini-workshop Nano project at ATF UK plans for Energy spectrometer studies University College London Stewart Boogert.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
WP9 : Cavity BPM spectrometry Royal Holloway S. Boogert & G. Boorman University College London D. Attree, A. Lyapin, B. Maiheu & M. Wing Cambridge University.
Design and Fabrication of a Q-BPM Calibration Tone Generator for the ATF2 Ian Bullock August 14, 2008.
BPM-Based Energy Spectrometer Contributors: A. Lyapin, B. Maiheu, F. Gournaris, D. Attree, M. Wing, D. Miller University College London (UCL) M. Slater,
C/S-band cavity BPMs A. Aryshev (KEK), S. T. Boogert G. Boorman, F. Cullinan, J. Frisch, A. Heo, Y. Honda, J.Y. Huang, S.J. Hwang, N. Joshi,
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Cavity BPM processing and hardware upgrade plans A. Lyapin, S. Boogert, E. Yamakawa.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
LAPP BI Read-out electronics Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC BI WS 02-03/06/2009.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
BPM for Spectromety development status A. Lyapin.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
May 31, 2005Third Mini-Workshop on Nano Project at ATF (M. Ross) Plans for nanometer cavity BPM studies Energy Spectrometer evaluation (Hildreth) Integration.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Phase Feed-Forward Piotr Skowroński (CERN)
LCABD WP 4.2 – Spectrometer and BPM Studies
CLIC Workshop 2016: Main Beam Cavity BPM
Plans for Laser-wire System Grahame Blair 30th May 2005
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
BPM-Based Energy Spectrometer
Terry Cotter LO/IF Group Leader
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Fabrication of KEK-ATF2 Q-BPM
LO BOX and LO/CLK DISTRIBUTION Arash Kaftoosian ESS Bilbao, May 2018.
Status of TTF HOM Project Aug 9, 2005
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Breakout Session SC3 – Undulator
Presentation transcript:

S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2 project meeting 27 August 2008

Electronics fabrication Mixer electronics 8 (dipole) + 1 (reference) + 1 (spare) = 10 channels Fabricated 6 new processing “boxes” Complete but.... Need complete system tests (1 week) 4 from ESA spectrometer test beam Just returned from SLAC last week Need some minor modifications (2 weeks) Shipping to KEK

S-band electronics fabrication RHUL summer student constructed new processing boxes Each individual component tested and recorded Total channel tests next few weeks but expect few problems Improved since ESA tests

S-band processing electronics RFLOIF Control board Pulse amplifier Filter Amp Limiter FilterAmp Filter Mixer PC

Other systems LO locking box Locked simply to 714 MHz (*4 = 2856 MHz) Cavity frequency chosen to leave 20 MHz IF Digitiser systems locked via Mellors locking box Calibration system Distribute calibration tone Power distribution Low voltage supplies Computer control Needs EPICS interface (quite simple) Attenuator and amplifier gains Temperature and voltage monitoring

Infrastructure from BPM to electronics Hybrids Cables Full size rack required Mixer electronics to digitizer systems Cables to existing readout Middle of ATF2 line Requirements DAQ C-band system S-band sband 714MHz ATF2

To discuss Location of processing electronics Cabling (BPM↔Mixer and Mixer↔Digitizer) Rack location Rack space (full height rack required) Installation/test schedule Processing can be included with C-Band system Functionally very similar, provided cavity works well Other people responsible for S-band? Uniform system is better but people need to be trained! Shipping of electronics Beginning of October (Sept not possible due to holiday problems) Stewart to visit KEK 4th till 25th September (Later not possible due to teaching)