ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic.

Slides:



Advertisements
Similar presentations
N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
Advertisements

N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
FONT Meeting1 Waveforms with and without BPFs N. Blaskovic.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT GROUP MEETING RES VS SAMPLE NO. Talitha Bromwich - Monday, 20 July 2015.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
Design and Fabrication of a Q-BPM Calibration Tone Generator for the ATF2 Ian Bullock August 14, 2008.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
FONT Meeting1 Digital signal filtering N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
IP BPM’s for ATF2 Vladimir Vogel KEK May30, 2005 Third Mini-Workshop on Nano Project at ATF.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
Tests of STO IF Components S. Weinreb April 15, 2009 Two 1-2 GHz IF amplifier plates and one 5 GHz converter plate for the Texas test flight have been.
FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic.
CALIBRATIONS IPBPM FILTER TESTS Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich Friday, 1 May Talitha Bromwich, FONT Group Meeting.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
Integrated Phased Array Systems in Silicon
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
N. BlaskovicFONT Meeting1 Feedforward runs N. Blaskovic.
FONT Oxford FONT REPORT NOVEMBER Neven Blaskovic Kraljevic and Talitha Bromwich Friday, 27 November
Path Length Difference Study R. Apsimon. Assumptions Assume input signals vary sinusoidally (good approximation after BPF). Input signal arrives at a.
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Roundup of Week at ATF Mikey Davis 19 April /26.
NSG 4070 Signal generator and immunity test system Dr. Heinrich
RF components Design for the Internet Over TV Band Adaptor
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
Status of BPMs and Electronics System at KNU.
Resolution Study T. Bromwich FONT 8 September 2017.
N. Blaskovic, T. Bromwich, P. Burrows, G. Christian, C. Perry, R
ATF cable plan N. Blaskovic N. Blaskovic FONT Meeting.
KNU IP-BPM and Reference cavity
Methods of transfer of ultra-stable frequencies to radio telescope
N. Blaskovic, T. Bromwich & G. Christian
March Trip Plan Mikey Davis 01 March /7.
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
Fabrication of KEK-ATF2 Q-BPM
FONT stripline BPM resolution
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
VELA BPMs Alex Brynes.
Near Field Probe Configuration
Presentation transcript:

ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic

Introduction Connected IPB(Y) to Honda electronics Identified delay in reference signal path Compensated delay by cable for IPB(Y) Waveforms Calibrations at a range of RF attenuations ATF Meeting2N. Blaskovic

ATF Meeting3N. Blaskovic BPFAmplifierLimiter ~714 MHz Ref(Y) ~714 MHz IPB(Y) Mixer ~714 MHz Ref(Y) before BPF ~714 MHz IPB(Y) before mixer

ATF Meeting4N. Blaskovic BPFAmplifierLimiter ~714 MHz Ref(Y) ~714 MHz IPB(Y) Mixer ~714 MHz Ref(Y) before amplifier ~714 MHz IPB(Y) before mixer

ATF Meeting5N. Blaskovic BPFAmplifierLimiter ~714 MHz Ref(Y) ~714 MHz IPB(Y) Mixer ~714 MHz Ref(Y) before limiter ~714 MHz IPB(Y) before mixer

ATF Meeting6N. Blaskovic BPFAmplifierLimiter ~714 MHz Ref(Y) ~714 MHz IPB(Y) Mixer ~714 MHz Ref(Y) before mixer ~714 MHz IPB(Y) before mixer 30 ns

ATF Meeting7N. Blaskovic BPFAmplifierLimiter ~714 MHz Ref(Y) ~714 MHz IPB(Y) Mixer ~714 MHz IPB(Y) before mixer ~714 MHz Ref(Y) before mixer 30 ns

ATF Meeting8N. Blaskovic BPFAmplifierLimiter ~714 MHz Ref(Y) ~714 MHz IPB(Y) Mixer ~714 MHz IPB(Y) before mixer ~714 MHz Ref(Y) before mixer delay cable

9N. BlaskovicATF Meeting ~714 MHz Ref(Y) before mixer I mixer output RF attenuator 0 dB

10N. BlaskovicATF Meeting I mixer output RF attenuator 0 dB

11N. BlaskovicATF Meeting IPB(Y) I IPB(Y) Q Ref(Y)unused P2 Σ I

ATF Meeting12N. Blaskovic IPB mover scanwaist at IPattenuator 50 dB

ATF Meeting13N. Blaskovic IPB mover scanwaist at IPattenuator 40 dB

ATF Meeting14N. Blaskovic IPB mover scanwaist at IPattenuator 30 dB

ATF Meeting15N. Blaskovic IPB mover scanwaist at IPattenuator 20 dB

ATF Meeting16N. Blaskovic IPB mover scanwaist at IPattenuator 10 dB

ATF Meeting17N. Blaskovic IPB mover scanwaist at IPattenuator 0 dB