U. Iriso ESLS XXIII Nov. 2015 Commissioning of the Bunch By Bunch Feedback System U. Iriso, J. Moldes, A. Olmos (ALBA – CELLS) M. Abbot, G. Rehm (Diamond)

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Lorentz force detuning measurements on the CEA cavity
Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Feedback for CESR TA Michael Billing May 17, 2007.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
Anders Sunesson RF Group ESS Accelerator Division
Initial Performance Results of the APS P0 (Transverse Bunch-to-Bunch) Feedback System N. DiMonte#, C.-Y. Yao, Argonne National Laboratory, Argonne, IL.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
January 19, 2006PEP TFB R.Akre PEP II Transverse Feedback System Ron Akre William Colocho Anatoly Krasnykh Vojtech Pacak Dmitry Teytelman Uli Wienands.
Future FONT BPM Processors C.Perry 25 June Types of Processor Two types of processor: a) present mixer type b) baseband type Both will be made because:
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
Adapting the LHC 1TFB electronic circuit to other equipments The candidates are: PS 1TFB PS TFB PS CBFB PSB TFB PSB 1TFB 1 Alfred Blas Working group meeting.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Other Utilities of ALBA LLRF
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
2/June/2009LHCb Upgrade1 Single ended ADC Differential ADC –Convert single ended signal to differential (use AD8138 amp) –ASIC differential output ADC.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Beam Secondary Shower Acquisition System: RF design techniques for 40MHz ADC Student Meeting Jose Luis Sirvent PhD. Student 30/09/2013.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
LLRF development of SSRF RF Group and Linac Group
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
N. Blaskovic, T. Bromwich, R. Ramjiawan
RF acceleration and transverse damper systems
PEP II Transverse Feedback System
LCLS_II High Rep Rate Operation and Femtosecond Timing
Re-entrant BPM R&D for ILC Main Linac
Alternative BPM Processing Scheme – May08 Demo
5 months of experience with 8 units of Libera Brilliance
Longitudinal Bunch-by-Bunch Feedback at DLS
The ELENA BPM System. Status and Plans.
Multibunch instabilities from TMBF data at Diamond
P. Forck, P. Kowina, M. Schwickert, R. Singh
Controls CBETA controls will extend existing EPICS control system
TMBF Features Guenther Rehm.
PSB Injection scheme in the Linac 4 era
LLRF and Beam-based Longitudinal Feedback Readiness
Monday 18 October : Collimation system
Latency measurements on the ALBA Electron units
Low Level RF Status Outline LLRF controls system overview
Low Level RF Status Outline LLRF controls system overview
LHC Fast Timing Commissioning
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

U. Iriso ESLS XXIII Nov Commissioning of the Bunch By Bunch Feedback System U. Iriso, J. Moldes, A. Olmos (ALBA – CELLS) M. Abbot, G. Rehm (Diamond)

U. Iriso ESLS XXIII Nov Outline BBB Layout BBB Commissioning System Features

U. Iriso ESLS XXIII Nov Libera FrontEnd Libera BbB IFI 100W ampli Hybrids Button BPM Stripline Kickers 100W atten Scope BbB Layout

U. Iriso ESLS XXIII Nov BbB Layout (2015) BPM FFK - Y FFK - X BbB - Y Timing EVR BbB - X Clk MHz Clk MHz Xout Yout A B C D 100W Att Load Scope Load Scope 100W Att Load Scope Load Scope 500MHz ALBA Master Clock RF FE 100 W Hybrids Four Amplis Configuration

U. Iriso ESLS XXIII Nov BbB Layout (2016) BPM FFK - Y FFK - X BbB - Y Timing EVR BbB - X Clk MHz Clk MHz Xout Yout S180-HP A B C D 100W Att Load Scope Load Scope 100W Att Load Scope Load Scope 500MHz ALBA Master Clock RF FE Hybrids 100 W Two Amplis Configuration + High Power Splitters

U. Iriso ESLS XXIII Nov W Ampli LPF [ ]MHz (to protect amplis) S180-HP BbB Layout (2016) New Hardware at ALBA – ready to test

U. Iriso ESLS XXIII Nov Outline BBB Layout BBB Commissioning System Features

U. Iriso ESLS XXIII Nov Diamond colleagues offered a collaboration to port Diamond TMBF to ALBA system Main steps: * HW checks/modifications on Amplifiers, Hybrids and phase matching of cables * Migrate the full FPGA code from SystemVerilog to VHDL language * Adapt it to ALBA machine (harmonic number, revolution frequency, tunes, …) * Install an “EPICS worm” (EPICS Base) inside our Tango control room * Build libca library to transfer data to Matlab * Permanently install Diamond TMBF code in our Liberas BbB (“brain” washed) We did a not very successful try with I-Tech Matlab interface TMBF Commissioning with beam with M. Abbot and f G. Rehm (May 2015) BbB – Diamond TMBF Commissioning

U. Iriso ESLS XXIII Nov Phase Offset Optimization (Mixer) PhaseX=20deg ; PhaseY=-20deg Hor Ver BbB – Diamond TMBF Commissioning RF FrontEnd X/Y outputs Need to maximize the signal to have the highest levels at Libera BBB

U. Iriso ESLS XXIII Nov BbB – Diamond TMBF Commissioning Amplifiers characterization 50dB gain – quite flat over all interesting freq range [0-250]MHz [0-200] MHz,  ~10deg  ok Clear degradation occurs >200MHz One of the amplifiers broke, so we could only install the BBB in the one plane (ver)

U. Iriso ESLS XXIII Nov Single Pulse from Libera BBB + Ampli + Kickers + Attenuators The amplis distort the signal, produces a ripple of ~6ns  We will not kick a single bunch, but alsoadjacent bunches! In the near future, we plan to exchange our amplis Single Pulse (2ns) from Libera BBB BbB – Diamond TMBF Commissioning

U. Iriso ESLS XXIII Nov Synchronize BBB pulse with bunch passage (single bunch) BBB Pulse + delay + 1ns cable Bunch Passage BbB – Diamond TMBF Commissioning Fine phase delay tuning adjusted adding short cables in the loop: 300ps, 500ps, 1ns

U. Iriso ESLS XXIII Nov BbB – Diamond TMBF Commissioning FIR Phase adjustment with stable beam Tune Phase ~ +/-180deg Decrease usual chroms and switch on BBB…  It works!! BBB OFFBBB ON

U. Iriso ESLS XXIII Nov DCCT and beam size evolution during first switch On Inject 100mA, uniform filling, chroms = (1.6, 0.2) BbB – Diamond TMBF Commissioning 30min

U. Iriso ESLS XXIII Nov Outline BBB Layout BBB Commissioning System Features

U. Iriso ESLS XXIII Nov BbB – Diamond TMBF Features Diamond TMBF allows to: Setup different “Banks”: ways to act on the beam (damping, excitation, sweep…) Combine them with the “Sequencer” This can produce interesting features (see next, and also Guenther’s ppt at DEELS14 )

U. Iriso ESLS XXIII Nov BbB – Diamond TMBF Features 1.Get a stable beam using TMBF 2.Excite mode m 3.Measure the growth time 4.Switch TMBF back on for that mode 5.Measure damping time 6.Damp again mode m, and repeat for m+1 Unstable modes identification Prepare the following sequence:

U. Iriso ESLS XXIII Nov BbB – Diamond TMBF Features Unstable modes identification Excitation Mode m Growth rate, 1/turns Damping No Damping RW ?

U. Iriso ESLS XXIII Nov BbB – Diamond TMBF Features Bunch Cleaning: Define a backwards sweep around Qv Activate DAC only in buckets B77 & B80 Killed B76, B77 Killed B79, B80 Killed in previous tests Before BC After BC

U. Iriso ESLS XXIII Nov BbB – Diamond TMBF Features Bunch Cleaning: Easier to clean a single bunch! Parasitic bunches are produced by the Linac with 18ns delay!?

U. Iriso ESLS XXIII Nov BbB – Diamond TMBF Features Tune Measurement using PLL: Measure beam phase response to an input freq (needs to be very close to Qv) Keep track of frequency (tune) change to match phase  Q ~ 1e-5! Input signal needs to be very small, compatible with normal operation In this case, one measurement/200 turns Applied only to single bucket

U. Iriso ESLS XXIII Nov Frequency, Hz FFT Amplitude Measurement taken with ChromV~0 FFT of a BPM buffer of 2.5e5 turns BbB – Diamond TMBF Features Tune Measurement using PLL: Main tune jitter peaks at 100 and 300Hz Compatible with tune jitter measurements with other means:

U. Iriso ESLS XXIII Nov BbB – Conclusions Diamond TMBF has been commissioned at ALBA Quite easy and straight-forward (thanks to Guenther and Michael!) An “EPICS worm” has been installed in our Tango-based Control Room Diamond TMBF allows several interesting features, already tested at ALBA: o Sequences to identify unstable modes o PLL tune tracking with 1e-5 precision (compatible with machine operation!) So far, only commissioned in the vertical plane due to hardware (ampli) failure.

U. Iriso ESLS XXIII Nov Thank you and see you soon!

U. Iriso ESLS XXIII Nov BBB – Extra slides

U. Iriso ESLS XXIII Nov Commissioning procedure * Finding proper RF FE settings (phase offset, clock phase, …) * Problem in Hybrids X signal * BbB “brain washing” failed  processor board already reflashed at Diamond * Ugly single pulse out of the amplifier. That will affect adjacent bunches * 2ns jump of the single pulse out of one BbB unit. Diamond has reproduced the problem in their lab (DAC initialisation) * Change ALBA timing to TMBF needs * Aligning system to the machine SBM * Inject 100mA uniform filling beam * Vertical loop closed just by setting the feedback phase * Chrom reduced to ‘0’ and beam kept stable * Bunch cleaning test: - no bunch kicking until scrapper closed - 2 bunches kicked out because of ampli * Unstable modes identification (m=-8) *

U. Iriso ESLS XXIII Nov Extra slides: 2ns jumps Scope in persistence mode, to show the 2ns jump (green). The violet trace is the trigger.