Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.

Slides:



Advertisements
Similar presentations
City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
Advertisements

Cost Estimation System Tool
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Mendota-Lebanon Hills Greenway Master Plan May 24, 2013.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
June 25, 2013 System Preservation Guide. June 25, 2013 Study Purpose and Goals 1.Analyze existing road conditions 2.Comparison of funding versus road.
June 25, 2013 System Preservation Guide. June 25, 2013 Study Purpose and Goals 1.Analyze existing road conditions 2.Comparison of funding versus road.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
LLANO COUNTY MUD #1 ROAD PROJECT REVIEW PURPOSE DISCUSS POSSIBILITY OF COMPLETING REMAINING ROAD UPGRADE PROVIDE FACTS TO INFORM COMMUNITY TO MAKE DECISION.
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Paving for Progress Aaron D. Granquist, Project Manager, HR Green, Inc. Doug Wilson, Capital Improvement Project Manager, Cedar Rapids Handouts and presentations.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Creating the 2040 Regional Transportation Plan. Today’s Presentation Now Developing the Next RTP  Very Early Stages of Development  Website: 2040Plan.org.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Transportation Master Plan Update Warden’s Forum May 7, 2015.
March  Finish Joint Sealing on Highlands Ranch Parkway  Finish Grinding on Lucent and Plaza and then Complete Joint Sealing  Start in Late.
City of La Palma The Path to Fiscal Sustainability: FY Budget Adjustments and Long-Term Response Discussion September 18, 2012.
Public Works Infrastructure Update Public Works Department April 5, 2016.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Pedestrian Facility Improvement Program
Navajo Nation Moving Roads Forward
A Data-Driven Strategy to Improve the Quality
2017 Comprehensive Plan Update
Arizona Forward Update
Town Road Improvement Project Plan
2016 Mill and Overlay Project
Village of Woodridge 2011 Pavement Analysis
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Boulder Junction Town Road Improvement Project
Town of Clayton 2016 Pavement Condition Survey
To Create Bristol’s Comprehensive Plan
Boulder Junction Town Road Improvement Project
1. Neighborhood Safety Program 2. ICS traffic and security 3
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Street Improvement Plan
City of Bloomfield Hills
Determine Reinvestment
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
City-wide LED Street Light Conversion Program
Capital Improvement Program
2018 Pavement Workshop May 23-24, 2018
Pavement Preservation
Dana Heiberg, Senior Planner February 5, 2018
Travis County Transportation and Natural Resources
Regional Projects Report 5-Year Integrated Plan Projects Status
El Cerrito Active Transportation Plan
RPPP Policy and Procedures Update
D Line and Station Plan overview
Washington LTAP Center Update
City of Wilmington Bike Plan Update
STP Shared Local Fund: Project Evaluation Criteria
M14A/D Select Bus Service
MPO Board Presentation
Walker Street Reconstruction Project 25% Design Public Hearing
Parks Highway Reconstruction: Lucas Road to Big Lake Road
NRRA Pavement Workshop 2019
Monterey County Project Report for Measure X Expenditures
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Dakota County Board Of Commissioners August 6, 2019
Bannock County Comprehensive Plan
I Street Bridge Replacement Project
Presentation transcript:

Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner

1.Evergreen Corridor Management Plan 2.Roadway Maintenance 3.Pathway Improvements Presentation Overview Evergreen Highway Corridor Update- 2

Project context Evergreen Highway Corridor Update : Original concrete roadway built 1954: Roadway transferred to Clark County 1978: Designated as a scenic route 1991: Friends of Evergreen Highway formed 1994: Clark County adopts trail plan 1997 : City annexes roadway 2011 : CRNA and OEHNA adopt NAPs 2015 : Evergreen CMP project begins

Project purpose Evergreen Highway Corridor Update - 4 The purpose of the Evergreen Corridor Management Plan (CMP) is to provide guidance, direction and documentation for future decisions and actions along SE Evergreen Highway

Scope Evergreen Highway Corridor Update- 5 Traffic volumes and speeds Local and regional access Roadway surface and maintenance Pathway design Roadway standards Stormwater requirements Historic and scenic significance Street lighting and utilities

1 Past planning efforts Current design and constructed projects Traffic analysis Public engagement Context considerations Process and inputs Evergreen Highway Corridor Update- 6 Evergreen Highway CMP

Concept-level designs Recommended changes to city code and road design standards Funding and implementation strategies Final plan presented to City Council for adoption Outcomes Evergreen Highway Corridor Update- 7

Project Timeline Evergreen Highway Corridor Update- 8 MARCH APRIL MAY JUNE JULY Develop draft plan Plan adoption AUGUST Open House Internal draft review Public draft review Open House Finalize plan

Community Outreach Evergreen Highway Corridor Update- 9 Presentations at two neighborhood association meetings (100+ participants) Online community survey (321 respondents) Eight small group meetings (61 participants) Ongoing and website updates Next step: Open house on April 16

Community Outreach Findings Evergreen Highway Corridor Update Safety for all users (motorists, people walking, people cycling) is a top priority 2.Focus on a short-term solution for the roadway surface condition 3.Completion of the pathway is more important than extra amenities (such as lighting, historic markers, or undergrounding utilities)

Current Road Conditions and Status The City has 1,810 lane miles of streets 185 total lane miles are “failed” Rated as a Pavement Condition Index (PCI) from 0-100* “Failed” is a PCI < 40 for arterials Average PCI of Evergreen Highway Chelsea to SE 164 th Ave. = 34 SE 164 th Ave to City Limits = 46 *PCI does not measure ride quality Evergreen Highway Corridor Update- 11

Current Road Conditions and Status Thin asphalt repairs Pothole repairs Milling of thin asphalt Test treatment Enhanced cape seal Evergreen Highway Corridor Update- 12

2016 Pavement Work Continued milling of asphalt Asphalt repairs Concrete grinding (new) Enhanced cape seal Re-striping and reflective markers Evergreen Highway Corridor Update- 13

Treatment Options and Cost Complete Reconstruction Current Regulations$515 /SY 2017 Regulations$355 /SY Evergreen Highway Corridor Update- 14

Treatment Options and Cost Reconstruction of Roadway Estimated total cost: $27.0M - $39.5M  Includes entire corridor from Chelsea to City limits (192 nd Ave)  Cost is for replacement with asphalt  Assumes that road width remains the same Phased construction Pathway built as a separate project Evergreen Highway Corridor Update- 15

Treatment Options and Cost Develop a detailed pavement rehabilitation plan for the corridor Interim measures to improve ride quality Continue enhanced cape seal along corridor Areas of asphalt overlay Concrete slab repairs Evergreen Highway Corridor Update- 16

Update on pathway improvements Evergreen Highway Corridor Update - 17 Evergreen Highway Pathway Segments

Update on pathway improvements Evergreen Highway Corridor Update- 18 SegmentBegins/EndsLengthStatusFunding Gap A Chelsea to Image1.1Design in progress.$1,275,000 B Image to 100th0.4Design 75% complete$900,000 C 100th to Ellsworth0.4Complete (2015)-- D Ellsworth to Columbia Springs0.7Complete (2001)-- E Columbia Springs to 164th2.3 Community fundraising effort enabled preliminary design work to be completed by BergerABAM To be determined F 164th to City Limits1.8 Conceptual design complete as part of overall east segment study $3,000,000+ Row height = relative length of segment

Evergreen Highway Corridor Update- 19 SE 100 th Court to SE Ellsworth Road Pervious Concrete

Evergreen Highway Corridor Update- 20 SE 100 th Court to SE Ellsworth Road Walls and Pervious Concrete

Evergreen Highway Corridor Update- 21 SE 100 th Court to SE Ellsworth Road Pervious Pavers

Questions and Discussion Jennifer Campos, Senior Planner, City of Vancouver (360) evergreen

Evergreen Highway Corridor Update- 23 Evergreen Trail – 100 th Ct. to Ellsworth