Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.

Slides:



Advertisements
Similar presentations
AGS/Booster Issues Feb. 25, 2014 Time Meeting Haixin Huang.
Advertisements

Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
Bunch Merging at 24 GeV Goal: 16 Tp per bunch The scheme Set-up problems Result Future work to increase bunch intensity.
AGS PP Progress Haixin Huang Time Meeting January, 31, 2012.
Charge Exchange injection in BNL AGS 1972: First suggested for AGS ( by A. Maschke ) 1982: Brought into operation in AGS. D.S. Barton, L. Alhrens, E. Gill,
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
Accelerator Support and Maintenance Run 14. Maintenance/Changeover Day Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
11/18/2003Haixin Huang1 RHIC Polarimeter Status All targets and Si detectors have been installed at the end of October. The targets survived the vacuum.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
Maintenance and Accelerator Support RHIC Start Up 12.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Low Energy operation of RHIC AGS low energy extraction performance N. Tsoupas et. al. BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)
Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens.
Agenda Safety Schedule Machine and system reports 2/26/2016G. Robert-Demolaize, Time Meeting1.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x :00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48.
Barrier RF Stacking Weiren Chou and Dave Wildman Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany,
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Injector Status Jan. 19, 2016 Time Meeting Haixin Huang.
Injector Status Feb. 9, 2016 Time Meeting Haixin Huang.
MLL Workshop on Future Science 2019 and beyond, 16.Dec.2015 The accelerator, as seen by.. 1 From LBNL Image Library Collection by Dave Judd and Ronn MacKenzie.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Longitudinal impedance of the SPS
Acknowledgments: LIU-PT members and deputies, H. Bartosik
The LHC25ns cycle in the PS Triple splitting after 2nd injection
LHC Status Sun Morning 20-Mai
60 MINUTES REMAINING.
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Injector Setup for G0 and HAPPEX & Lessons Learned
Collective effects in the SPS and LHC (longitudinal plane)
J. Seeman Perugia Super-B Meeting June 2009
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
JLEIC Ion Integration Goals
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Presentation transcript:

Injector Status Jan. 26, 2016 Time Meeting Haixin Huang

2 Injector Status l We worked on several bunch merge schemes now. l 8->4->2 merge: Bunch intensity is about E9/bunch. The highest from last year was 2.1E9/bunch with slightly higher EBIS input. Longitudinal emittance is about 0.7eVs. Currently, this setup is used for RHIC injection. l 6->3->1 merge: Booster merge is improved. RF radial loop is used to make the merge more stable so that baby bunch percentage is reduced to 12% (last year was >20%). The bunch intensity is 2.5E9 now (2.3E9 last year). Longitudinal emittance is larger, about 0.8eVs. l 12->6->2 merge: l with higher total intensity, the plunge foil provides additional protection for beam pipes. The plunge foil has been set up properly and ready for use. l The 13 Booster cycles have been tested for 7sec super cycle for 15 minutes and it is confirmed that 13 Booster cycles does not violate the PPMR requirement. l The Booster cycle has to be modified to meet the PPMR requirement. For this to happen, the merge has to move to higher energy. This remains to be done. l G10 kicker timing alignment issue is worked on.

Haixin Huang 3 AGS Bunch Merge Comparison 6->3->1 Merge 8->4->2 Merge