8-1 Cost Estimation and Budgeting Chapter 8 © 2007 Pearson Education.

Slides:



Advertisements
Similar presentations
Cost Estimation and Budgeting
Advertisements

Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
Activity-Based Costing Systems Chapter 4. Traditional overhead allocation system  Single predetermined rate is used to allocate overhead to products.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Cost Estimation and Budgeting Chapter 8.
An Introduction to Cost Terms and Purposes
2009 Foster Business School Cost Accounting L.DuCharme A Review of Cost Terms and Purposes Chapter 2.
8-1 ELC 347 project management Week Agenda Assignment 4 ReGraded Integrative Project –First part Graded A few problems –2nd part Due –Outline of.
Advanced Costing - ABC Activity Based Costing
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Scheduling & Budgeting CEE 402 Engineers Without Frontiers Lecture 6 February 26, 2003.
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
Cost Management Week 6-7 Learning Objectives
Copyright © 2003 Pearson Education Canada Inc. Slide 7-91 Chapter 8 Flexible Budgets, Variances, and Management Control: II.
Activity-Based Costing and Analysis
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 13 Job Costing Systems.
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
Chapter Two Manufacturing Costs and Job-Order Costing Systems.
Budgeting Projects Chapter 9 Contemporary Project Management Kloppenborg © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated,
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Cost Estimation and Budgeting. Cost management Data collection & cost estimation Cost accounting Cost controll Copyright © 2010 Pearson Education, Inc.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 13.
Chapter 9 Contemporary Project Management Kloppenborg
CS-411W VIII – Budgeting, Costing, and Pricing. Definitions Cost - the value of inputs that have been used to produce something. Inputs are typically.
1 Project Budgeting. 2 Control or Feedback Involves Monitoring/Assessing Output to Determine Necessity of Making Changes in Input or Transformation of.
Chapter 8 Activity-based costing. §A methodology that can be used to measure both the cost of cost objects and the performance of activities §Can help.
6-1 ELC 347 project management Day 16. Agenda Integrative Project –Part 3 due today –Part 4 Due Nov 10 (page 276) –Any of the first five sections can.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 14.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Cost Estimation and Budgeting.
Cost Estimation and Budgeting Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Chapter 8 Learning Objectives After completing.
Project Cost Estimation. 2 What is Cost and Project Cost Management? Cost is a resource sacrificed or foregone to achieve a specific objective, or something.
4-1 Chapter 4 Budgeting the Project. 4-2 Introduction 4 Budgets are plans for allocating organizational resources to project activities. –forecasting.
Estimating projects Estimating  The process of forecasting or approximating the time and cost of completing project deliverables  The task of balancing.
Estimating Project Times and Costs CHAPTER FIVE PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
8-1 Cost Estimation and Budgeting Chapter 8 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
CS-411W VII – Resource Planning and Allocation. Definition Resource – any person, item, tool, or service that is needed by the project that is either.
ACTG 4310 Chapter 10 – Fundamentals of Cost Management.
Estimating Project Time and Cost
Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved. 10/27/07 SJSU - Bus. 286 David Bentley (Gray & Larson)1 Chapter 5 – Estimating.
© John Wiley & Sons, 2011 Chapter 7: Activity-Based Costing and Management Eldenburg & Wolcott’s Cost Management, 2eSlide # 1 Cost Management Measuring,
CHAPTER 2 An Introduction to Cost Terms and Purposes.
Prepared by Diane Tanner University of North Florida Flexible Vs. Static Budgets Chapter 7.
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 11 1.
Developing the schedule – Tracking Gantt charts Critical path method – Longest path, earliest time Schedule trade-offs using CPM – Free slack, total slack.
1 Estimating. 2 Cost Management According to the PMBOK ® Guide, Project Cost Management knowledge area includes the processes involved in planning, estimating,
1 Chapter 2 An Introduction to Cost Terms and Purposes.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
ESTIMATING PROJECT TIME, COST & BUDGETING
ESTIMATING PROJECT TIME, COST & BUDGETING
ESTIMATING PROJECT TIME, COST & BUDGETING
ESTIMATING PROJECT TIME, COST & BUDGETING
Chapter 3: Cost Estimation Techniques
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 11A Appendix 11A: Predetermined Overhead Rates and Overhead Analysis.
Cost Estimation and Budgeting
ESTIMATING PROJECT COST & BUDGETING
Cost estimation and budgeting
ESTIMATING PROJECT TIME, COST & BUDGETING
ELC 347 project management
An Introduction to Cost Terms and Purposes
Proposed Budget for FY10 – FY12 December 10, 2009
Chapter 1 An Introduction to Cost Terms and Purposes
An Introduction to Cost Terms and Purposes
Cost Estimation and Budgeting
What is Learning Curve Most organizations learn & improve over time. As firms and employees perform a task over and over, they learn how to perform more.
An Introduction to Cost Terms and Purposes
An Introduction to Cost Terms and Purposes
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Economics and Project Management
Presentation transcript:

8-1 Cost Estimation and Budgeting Chapter 8 © 2007 Pearson Education

8-2 Common Sources of Project Cost  Labor  Materials  Subcontractors  Equipment & facilities  Travel

8-3 Types of Costs  Direct Vs. Indirect  Recurring Vs. Nonrecurring  Fixed Vs. Variable  Normal Vs. Expedited

8-4 Cost Classifications Direct LaborXXXX Building LeaseXXXX ExpediteXXXX MaterialXXXX Non-recurring Direct Indirect Fixed Recurring Variable Normal Expedited Costs

8-5 Cost Estimation  Ballpark (order of magnitude) ±30%  Comparative ±15%  Feasibility ±10%  Definitive ±5%

8-6 Learning Curves Each doubling of output results in a reduction in time to perform the last iteration.

8-7 Problems with Cost Estimation Low initial estimates Unexpected technical difficulties Lack of definition Specification changes External factors

8-8 Creating a Project Budget Top-down Bottom-up Activity-based costing (ABC) Project Plan WBS SchedulingBudgeting The budget is a plan that identifies the resources, goals and schedule that allows a firm to achieve those goals

8-9 Activity-Based Costing Projects use activities & activities use resources 1.Assign costs to activities that use resources 2.Identify cost drivers associated with this activity 3.Compute a cost rate per cost driver unit or transaction 4.Multiply the cost driver rate times the volume of cost driver units used by the project

8-10 Budget Contingencies The allocation of extra funds to cover uncertainties and improve the chance of finishing on time. Contingencies are needed because Project scope may change Murphy’s Law is present Cost estimation must anticipate interaction costs Normal conditions are rarely encountered