CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.

Slides:



Advertisements
Similar presentations
WDS Status Propose to create 6 sub-collaborations Propose to create 6 sub-collaborations Sub-collaborationSummary of Task 1Proton DriverDefinition of critical.
Advertisements

14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004.
CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Eurisol User Group, 14 Jan 2008V. Palladino ν beams: prospects today & synergies with Eurisol" Neutrino beams: prospects today & synergies with Eurisol.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
BENE07, 29 Oct 2007V. Palladino Goals for BENE08 Goals for BENE08 − February 29 submission of IA Proposals → 2012 CARE Next HEP Detectors IA V. Palladino.
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
Scoping study p-ECFA Alain Blondel ISS-detectors Introduction: working group plans, organization and aims of the meeting.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
BENE Meeting April 28, 2006 A. Bross US Contribution to the IDS Aka WDS BENE IDS/FP7 at RAL April 28, 2006 A. Bross.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
ISS After One Year Peter Dornan Imperial College London.
ESPG R. Aleksan November 28 th, 2011 Accelerator R&D Accelerator R&D 1.Introduction 2.Accelerator Science and Technology 3.Conclusion.
European design study on Neutrinofacilities - Euronu within FP7.
CARESGV. Palladino: Status Report from BENE Status Report from BENE V. Palladino, CARESG, College de France, Sep BENE established on.
Networking Activity on Beams for European Neutrino Experiments BENE-Next ….. MEGLIO? Motivation Work Packages Partners & resources First ideas for the.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
EuCARD Number of partners : 40 beneficiaries (12 countries) Total cost ~ 50 M€ (requested EC contribution: ~15 M€) Coordinator : J.-P. Koutchouk (CERN)
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Road Map of Future Neutrino Physics A personal view Ken Peach Round Table discussion at the 6 th NuFACT Workshop Osaka, Japan 26 th July – 1 st August.
Concluding remarks R. Aleksan CERN, November 25, 2005 CARE is almost 2 year old What comes next ?
WP4 - Design Studies. Outline Status of FP6 Design Studies Consequences High power targets MICE Neutrino detector R&D FFAGs WDS Status.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
The ISS Peter Dornan Imperial College London. 16 March 2006P Dornan - MUTAC `atmospheric’`solar’ `cross/reactor’ Oscillation defined by 3 mixing.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
27 Apr 2006P J Dornan - ISS3 - RAL Next Meeting 4 th ISS Plenary –Irvine Aug21, 22 (NUFACT06 Aug 24 – 30) Workshops –Physics Group, June, Valencia –Machine.
Neutrino Factory Design Study Introduction Introduction World Design Study status World Design Study status EC Framework 6 Design Studies EC Framework.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
CERN, 27/11/2009,86th Plenary ECFAV.Palladino Status and Plan for FP7-NEU Status and Plan for FP7-NEU2012 the Accelerator Neutrino Network in the.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Ionization Cooling for Muon Accelerators Prepared by Robert Ryne Presented by Jean-Pierre Delahaye MICE Optics Review Jan, 2016 RAL.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
CARE05, 25Nov2005V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
UK Neutrino Factory Conceptual Design
ESGARD - 19th May 06 Very brief summary! 32 LOIs received LHC Upgrade
Jan 2016 Solar Lunar Data.
Accelerator R&D for Future Neutrino Projects
News and brief overview of Beamline plans for the next few months
CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino
Alain Blondel 11 October 2010 GDR NEU2012 summary
The Way Forward ISS to IDS
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
Milestones & Deliverables BENE III period Jan 06 - Jun07
as of today 123 registered participants

ECFA recommendations (September 2001:)
XVth International Workshop on Neutrino Factories, Betabeams and Superbeams LAGUNA-LBNO Many thanks to D. Duchesneau, F. Di Lodovico, T. Patzak, A. Rubbia.
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road map for accelerator based neutrino programs in Europe A complex multi-parameter problem International Scoping Study of a future Neutrino Factory and Superbeam facility (ISS) FP7 Design Study of next European Accelerator Neutrino Facility “Euro ν” DS in world wide collaboration W orld DS

CARESG, 11Apr2006V. Palladino Report on BENE Activities Accelerator R&D CARE Multipurpose (e,p, ) ???? CARE SRF CARE PHIN CARE HIPPI CARE NED EUROTEV DS: ILC+CLIC ????? EURISOL DS: Neutrino  -beam ???? DS Fact Scoping study ? DS Fact? EUROLEAP e in plasma? Major Strategic decisions

CARESG, 11Apr2006V. Palladino Report on BENE Activities Since CAREO5 2nd meeting of the ISS in KEK in Jan Orsay Strategy Group Symposium Feb 1 BENE Midterm Report 3rd meeting of the ISS in RAL (24-27 Apr) BENE FP7/IDS Day 28 April LOI !!!! Last meeting of the ISS at NuFact06 late Aug

CARESG, 11Apr2006V. Palladino Report on BENE Activities Exploring all possible FP7 plans Design study Euro ν Feasibility studi(es) “RTD” TPW Specific ν I3 with several JRAs JRA(s) in CARE2

CARESG, 11Apr2006V. Palladino Report on BENE Activities Int. Scoping Study(*) Design Study BENE : the longer term plan CDR … at the time of end of LHC payment first LHC results ILC decision be ready to catch any construction window Physics feasibility Feasibility & TPW HIPPI, HARP MERIT MICE PRISM, EMMA NB Betabeam CDR End 2009 ! Construction window

CARESG, 11Apr2006V. Palladino Report on BENE Activities Milestones & Deliverables BENE III period Jan 06 - Jun07 BENESG 1/ month Jan Feb Mar Apr May Jun Jul Aug Sep Nov Dec Jan Feb Mar Apr May Jun

CARESG, 11Apr2006V. Palladino Report on BENE Activities A complete Euro-Neutrino Design Study physics, accelerators, detectors, baselines ISS= International Scoping Study … American and Asian collaborations as full partners June 2005 to late 2006: mostly neutrino factory & superbeams define priorities and ways of Design Study consolidate regional & international collaboration us in EU, gain support of Council and ECFA IDS = International Design Study (neutrino factory & superbeams & betabeam) start late 2006 or early 2007 achieve higher funding, start design effort us in EU, prepare FP7 Proposal (March 2007, it seems) structure EU collaboration, get CERN involved as much as possible FP7 DS = EC (support for EU effort in the) Design Study … CNGS & beyond aiming at first EC funds Jan 1, 2008 inter-twined with IDS keeping American and Asian collaborations as full partners …. T2K, Nova Goal: Conceptual Design Report of a European Precision Neutrino Facility by end 2010 is next natural step for accelerator ν ISS & IDS/FP7 DS BENE CDHS CHARM I/II CHORUS NOMAD OPERA ICARUS

CARESG, 11Apr2006V. Palladino Report on BENE Activities conceptual feasibility study of the following components: a high power proton driver of at least 4-5 GeV the engineering of the handling, containment and safety aspects of a hi power target & collection station a performing and cost effective muon phase rotation and cooling channel non-scaling FFAGs for acceleration of muons (and possibly protons) an optimised storage ring for muons higher intensity and higher gamma beta beams technical preparatory (R&D) projects, aiming at demonstrating: the existence of at least one adequate choice of target an extended lifetime of the horn prototypes at high rate and radiation muon ionization cooling, by completion of the MICE experimental program operation of a non-scaling FFAG RF cavities and kicker magnets for fast manipulation of muon beams + specific detector R&D and design efforts on : photo detector development for very large far detectors developments of the liquid argon technique including the presence of magnetic field study and tests of a magnetic calorimeter susceptible to be built with a mass of up to 100 kton. detectors dedicated for tau detection such as the emulsion cloud chamber last but not least the necessary near detector concepts and beam instrumentation guessing the Content of the Design Study pre-submitting it now to ECFA/ESGARD scrutiny

CARESG, 11Apr2006V. Palladino Report on BENE Activities

CARESG, 11Apr2006V. Palladino Report on BENE Activities