Digital Gammasphere ATLAS Users Workshop Argonne National Laboratory May 15, 2014 Michael P. Carpenter Cast of Characters: M. Albers, A. M. Alcorta, J.

Slides:



Advertisements
Similar presentations
ReA12 separator Chris Campbell July 12, 2014.
Advertisements

20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
Initial Science Case For GRETINA at ATLAS M.P. Carpenter Physics Division, Argonne National Laboratory ANL Gretina Workshop March 1, 2013.
Coupling ORRUBA and GRETINA Steven D. Pain Oak Ridge National Laboratory ORRUBA Coupling with GS Coupling with GRETINA Instrumentation GRETINA Workshop,
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Overview of the current TDR system Introduction Electronics for instrumentation TDR core : Metronome, ADC, Merge Data Handling Pete Jones, University of.
Pete Jones University of Jyväskylä INTAG Workshop GSI, Germany May 2007 Status of digital electronics at JYFL Pete Jones Department of Physics University.
Coupling an array of Neutron detectors with AGATA The phases of AGATA The AGATA GTS and data acquisition.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
Trigger-less and reconfigurable data acquisition system for J-PET
Fragment Mass Analyzer Darek Seweryniak, ANL C. N. Davids et al., Nucl. Instrum. Meth., B 70, 358 (1992).
AGFA – the Argonne Gas-Filled Analyzer Presentation at the 2014 ATLAS User’s Meeting May 15-16, 2014 Birger B. Back.
Gretina data flow and formats Chris Campbell LBL.
Gamma-Ray Energy Tracking Array GRETINA The 11 th International Conference on Nucleus-Nucleus Collisions May 27- June1, 2012, San Antonio TX I-Yang Lee.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Fragment Mass Analyzer upgrades and X-array status Darek Seweryniak, ANL.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
FPGA and VHDL Developments for DGS and DSSD John T. Anderson for the ANL group: M. Carpenter, T. Madden, M. Oberling, D. Seweryniak, J. Vander Ploeg, P.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
Parallel Data Acquisition Systems for a Compton Camera
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
COMPET Electronics and Readout
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Shootout experiment GSFMA315 at a glance 122 Sn( 40 Ar[170MeV],4n) 158 Er 12 C( 84 Kr[394MeV],4n) 92 Mo GSGT 1:Mo,Tu 2:Tu,We,Th 3:Th,Fr 4:Sa High multiplicity.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Gammasphere ATLAS Users Meeting August 8, Gammasphere Array P/T ~ 55% (insitu)‏ P/T ~ 15% Note: 68% P/T achieved on bench. Fully loaded, Gammasphere.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
CHICO-II; a 4π heavy-ion detector LLNL-Rochester CHICO2 collaboration LLNL:C-Y. Wu U. Rochester:A.B. Hayes, D. Cline, R. Flight, A. Melchionna, C. Zhou.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Digital Acquisition: State of the Art and future prospects
Work on Muon System TDR - in progress Word -> Latex ?
"North American" Electronics
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Andreas Horneffer for the LOFAR-CR Team
vXS fPGA-based Time to Digital Converter (vfTDC)
JEDI polarimetry – Developments at SMART|EDM_Lab
1st AGATA-GRETINA Collaboration Meeting Shaofei Zhu
Vito Palladino Straw Working Group 23/3/2015
AFE II Status First board under test!!.
Status of the Beam Phase and Intensity Monitor for LHCb
CMS EMU TRIGGER ELECTRONICS
Hall A Compton Electron detector overview
EMC Electronics and Trigger Review and Trigger Plan
GRETINA Gamma-ray Tracker Status and EPICS Usage
FPGA-based Time to Digital Converter and Data Acquisition system for High Energy Tagger of KLOE-2 experiment L. Iafolla1,4, A. Balla1, M. Beretta1, P.
The IFR Online Detector Control at the BaBar experiment at SLAC
Example of DAQ Trigger issues for the SoLID experiment
BESIII EMC electronics
Commissioning of the ALICE-PHOS trigger
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
The CMS Tracking Readout and Front End Driver Testing
GRETINA experiments with fast beams at NSCL
Readout Systems Update
Presentation transcript:

Digital Gammasphere ATLAS Users Workshop Argonne National Laboratory May 15, 2014 Michael P. Carpenter Cast of Characters: M. Albers, A. M. Alcorta, J. Anderson, A. Ayangeakaa, P. Camboulives, M.P. Carpenter, C. Chiara, H. David, C. Hoffman, R.V.F. Janssens, A. Kreps, T.L. Khoo, T. Lauritsen, C.J. Lister, T. Madden, M. Oberling, A. Rodgers, D. Seweryniak, P. Wilt, S. Zhu. Special Thanks to GRETINA Team

Michael Carpenter, Heavy Ion Discussion Group, Jan. 6, Gammasphere Limitations and Liabilities Count Rate Limitations Processing time for Ge shaper is ~10  sec which gives ~6% pileup at 10,000 cps, 20% 30,000 cps and ~30% 50,000 cps. Solution – reduce Ge shaping time allows higher rates. Trigger Limitations Gammasphere DAQ is dead for at least ~ 25  sec for triggered events (no pipelining). Single and 2-fold Ge triggers saturate Gammasphere rate capability. Solution – flexible trigger incorporating triggerless option. Aging Electronics Gammasphere VXI electronics was developed and built nearly 20 years ago (GS commissioning in 1995). Component failure without replacement is big concern. Solution – replace VXI electronics before system is compromised.

DGS Hardware Components Michael Carpenter, Heavy Ion Discussion Group, Jan. 6, Digitizer Module (LBNL) 10 Channel 14 Bit, 100 MHz Energy Leading Edge Timing Constant Fraction Timing Pulse Shape 44 digitizers Trigger Timing and Control Module (ANL) 1 Master, 1 Router/8 Digitizers Sync All Clocks Fast Multiplicty Triggers < 300ns Slow triggers ~ 2msec Multiplicty Energy 1 Master/ 3 Routers

4 Configuration of Digitizers Digitizers 1,3: Ch 0-4, BGO Sum Energy Ch 5-9, Ge central contact Digitizers 2,4: Ch 0-4, Ge Side Channel : Ch 5-9, BGO Hit/Multiplex IOC This configuration instruments 10 GS modules Fast Trigger provides following possibilities: 1.Clean Ge Multiplicity or 2.All Ge Multiplicity or 3.Modular Multiplicity VXI boards will be replaced by custom boards which provide: Differentiated Ge signal BGO Sum energy BGO Side Channel Digital Hit Pattern (BGO seg. energies) Slow control of slope box (Ge and BGO HV) Hit }}

MγRIAD (GITMO-VXI)  A generic interface between the SERDES link, VME and ECL/NIM –Large number of ECL I/O –Good number of NIM I/O with fast receivers –Works in any VME crate (standard or VME64) –Sufficient FPGA for general gating logic –Large FIFO allowing buffering of auxiliary detector data –Capable of acting as FERA data receiver if needed –Possibility to integrate a TDC-in-FPGA for measurement of system clock phase relative to accelerator beam pickoff or RF clock – Opens up chance to do sub-sample timing adjustments  CHICO Gammasphere in 2013 –Receive timestamp from Master Trigger via SERDES –Latch timestamps when CHICO triggers –Provide gating logic as necessary with other NIM or ECL signals (e.g. Gammasphere fast multiplicity) –Add MγRIAD to CHICO readout so that CHICO events have matching timestamps for offline event merging –Send CHICO trigger signals to Master Trigger of Digital Gammasphere for monitoring  Generic interface to auxiliary detectors for both Gammasphere and GRETINA

6 Digital Gammasphere Phase I (Complete) Digitize Ge central contact and BGO summed signal. Allow Digital Gammasphere to be triggered by Gammasphere – parallel data path. Use current VXI electronics for slow control. Phase II (Complete) New firmware for both digitizer and trigger modules Upgrade EPICS drivers and DAQ to account for new firmware First test experiments end of September (Gammasphere + FMA). Upgrades to firmware are ongoing. Phase III (In-Progress) Replace current VXI electronics with custom VME modules for both signal redistribution and slow control. Add BGO hit-pattern and side channel to data stream. Incorporate slave digitizers (BGO hit pattern and side channel)

Michael Carpenter, Heavy Ion Discussion Group, Jan. 6, Pickoff Boards (Phil Wilt) Differentiates transistor reset preamp signal from Gammasphere preamp – output looks like resistive preamp signal. Differentiation turned off during pulse reset. Differentiated Ge signal, BGO Sum signal and Ge Side Channel are outputted via the 15 pin connector.

8 Phase II – completely new firmware ANL Firmware Implemented New Energy filter to optimize energies at short shaping times. Decouple LED from energy filter flattop parameter Write in zero-suppress mode when triggering using TTCS. Extended trace mode for pileup events. New trigger algorithms for Ge-clean multiplicity, module multiplicity and any multiplicity. Constant Fraction Discriminator build. Option to write trace when pileup occurs. Coming Soon Incorporate slave digitizers. Selective readout of channels. Digital TDC to measure time between rf and trigger (Tac2).

Data Readout and Sorting  Each IOC has a receiver attached to it which writes triggered data to a file on disk.  A separate file is generated for each digitizer.  Realtime event builder has not been developed.  Using GTMerge, all files from run are merged together and sorted according to timestamps.  Events can be constructed and data sorted using GEBSORT.  GEBSORT is a ROOT based sorting package which can sort data taken with various DAQ systems – DGS, GRETINA, DFMA, CHICO.  GEBSORT and GEBMERGE developed by T. Lauritsen. 9

Analog vs Digitial Comparison  In recent in-beam test, 40,000 event/sec were written to disk with a trigger condition of Ge clean of 3 and greater. –~220,000 Ge/sec –~210,000 BGO/sec Eu LineAnalog GSDigital GS Red is DGS and Blue is GS – Analog vs Digital Energy Resolution

Michael Carpenter, Heavy Ion Discussion Group, Jan. 6, Extended Physics Reach with DGS Selective External Triggers (e.g. FMA) – 100 Sn region, Z>100 DGS will allow one to increase rate in Ge detectors from ~10/sec to ~50k/sec (factor 5 increase) High Multiplicity trigger – Ultra-high spin, Hyperdeformation search DGS will allow increases in high-fold readout rate by factor 3-5 allowing for multiplicity conditions on high-fold event to be set higher giving higher resolving power in searching for exotic modes at high-spin. Low Multiplicity trigger (inbeam)–Deep inelastic, Coulomb Excitation DGS will allow increases in readout rate 3-10 times depending on reaction and multiplicity setting. Low Multiplicity trigger (decay)– Decay of stopped CARIBU beams. DGS will allow lossless Ge clean singles rate at up to 10kcps/crystal. Current lossless rate is ~400cps/crystal. Extended ATLAS reach – More approved experiments/year. GS experiments can be performed >3 times faster.

12 CHICO-II/CARIBU/DGS 208 Pb: 1mg/cm Hf 144 Ba/Nd 72 Ge 144 Ba: Ba: Ba: Nd: Nd: 4 + Angular coverage: – 12 o ≤ θ ≤ 85 o, 95 o ≤ θ ≤ 168 o ; 280 o in φ Angular resolution: – Δθ = 1 o, Δφ = 1.4 o Solid angle: – ~69% of 4π Energy-loss output: – Improved time, mass and Z resolution Time resolution: – Δt ≤ 500ps Mass resolution for kinematic coincidence: – Δm/m ≤ 5% Q-value resolution: – ≤ 20 MeV Gammasphere γ-ray Doppler broadening: – 0.8% * GRETINA γ-ray Doppler broadening: – 0.2% * * Ignores contribution due to intrinsic resolution etc. Coulomb Excitation of 144 Ba on 208 Pb

13 Other Digital Initiatives: Full instrumentation of the FMA focal plane (D. Seweryniak) 160x160 DSSD PPAC X-Array Compton-Suppressed Clover Array (Clover Share) 200 channels of digital electronics + trigger (new) Support structure to hold 16 Compton Suppressed Clovers (yale) General purpose digital DAQ for ATLAS experimental stations 80 channels of digital electronics + trigger X-Array at CARIBU 40 channels of digital electronics + trigger HELIOS ~200 channels of digital electronics + trigger Staged implementation Final decision soon.

Michael Carpenter, Heavy Ion Discussion Group, Jan. 6, Digital Gammasphere 5 and 10 year Outlook  Digital Gammasphere plays important role in energy/intensity upgrade of ATLAS.  Digital Gammasphere and GRETINA are complementary devices  GRETINA exceeds DGS –Doppler Reconstruction (Fast Beams) –Polarization  DGS exceeds GRETINA –Raw Data throughput –4  coverage  GRETINA and DGS will complement each other over the next 5 years.  In 5-10 year period as GRETINA becomes GRETA, the niche DGS fills will shrink, but it should remain a productive and powerful device.