SISO Implementation Study Group for C4I-to-simulation Interfaces (ISG-C4I) Joseph Lacetera Spring 1999 SIW 14-19 March 1999.

Slides:



Advertisements
Similar presentations
1 Dissertation Process 4 process overview 4 specifics –dates, policies, etc.
Advertisements

3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
IEEE COMMITTEE TO RESOLVE MEMBERS' CONCERNS FINAL REPORT IEEE Central Texas Section Spring Section Meeting January 25, 2014 San Marcos, TX.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
S&I Standards Organization Engagement & Communication Plan DRAFT Standards Support Team 1 September 2011.
PROMCODE Technical Committee Convener Call 14 February
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
Cultural Resources Subcommittee Update to Coordination Group John Knoerl, Chair Program Manager, Cultural Resource GIS Facility, National Park Service.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
1 SISO SAC Report to IEEE CS SAB February 7, 2007 Vancouver, BC Katherine L. Morse, Ph.D., SAIC
Faculty Meeting Review Group Alvan Bregman (convener), Lisa Hinchliffe, Joanne Kaczmarek.
National Geospatial Advisory Committee NGAC Action Plan Discussion October 16, 2008.
HLA Evolved Product Drafting Group Meeting Introduction 5-6 April 2006 Roy Scrudder Defense Modeling and Simulation Office (703)
Fall ‘99 Simulation Interoperability Workshop RTI Interoperability Study Group Final Report Michael D. Myjak, Chair.
PACR Technical Committee Convener Call 09 January /9/131.
1 The XMSF Profile Overlay to the FEDEP Dr. Katherine L. Morse, SAIC Mr. Robert Lutz, JHU APL
Bow Basin Watershed Management Plan Revised Terms of Reference
Preparation of the Self-Study and Documentation
ATF FACULTY MEMBER TRAINING ACADEMIC YEAR
African Aviation Training Organization
Strategic Advisor for Social Work and Social Care Research
COMPREHENSIVE PLAN 2017 AMENDMENT PROCESS and DOCKET
Global Grid Forum GridForge
Project Management Managing Project Execution
EU Implementation Programme
Senate Meeting Summary
SPECIAL COMMITTEE RECOMMENDATIONS STATUS CTS Fall Planning Meeting San Marcos September 6, 2013 Don Drumtra Good morning.
Implementation Strategy July 2002
An Update to the M&S Community
INAS GOVERNANCE CONSULTATION September 2016
COMPREHENSIVE PLAN 2017 AMENDMENT PROCESS and DOCKET
Establishment of ‘Technical Sub Committee’ Action - SDG Option
ATF FACULTY MEMBER TRAINING ACADEMIC YEAR
IMT-2020 Contribution Content
OFFICE OF THE CITY CLERK SEPTEMBER 22, 2014 CITY COUNCIL MEETING RESCIND RESOLUTION NO AND ADOPT A RESOLUTION ESTABLISHING THE RULES GOVERNING.
Marine Strategy Framework Directive (MSFD)
Terms of Reference for the Near-Earth Object Threat Mitigation
ATF MEMBER TRAINING ACADEMIC YEAR.
Understanding the Planned Changes to the Federal Policy on Protection of Human Subjects (the Common Rule) Megan Kasimatis Singleton, JD, MBE, CIP Assistant.
Continuum of Care Metropolitan Homelessness Commission
About The Federal Data Architecture Subcommittee (DAS) 2008
IEEE WG Closing Report – March 2006
SMSA Policy and Planning Committee
STRATEGIC PLANNING Auburn University A/P Assembly Update June 22, 2005
Ashland Public Schools School Start Time Process
January Opening Report
<month year> doc.: IEEE < e> <September 2018>
IEEE IMT-Advanced Review Process
<month year> doc.: IEEE < e> <November 2018>
IEEE IMT-Advanced Review Process
NATURA 2000 and Water Framework Directive (CIS )
IEEE 802 2nd Vice Chair last name at ieee dot org
January Opening Report
AANI SC Teleconference Agenda
IEEE IMT-Advanced Review Process
Region 8 Meeting Harvey Solomon, MD
IEEE 802 2nd Vice Chair last name at ieee dot org
SeBIN Overview Debbi Meisner, VP Compliance Emdeon Business Services
Supporting Faculty Research
Green Infrastructure: Working method
802.11F Meeting Report March 2002 Month 1998 doc.: IEEE /xxx
NatSIP-CRIDE Feasibility Study
The New Biogeographic Process General info – December 2011
<month year> doc.: IEEE < e> <November 2018>
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Report of the Technical Subcommittee
Roles and Responsibilities
Roger Marks (Huawei) capable 18 July 2019
WGCV CARD4L Peer Review Medhavy Thankappan WGCV-45 July 15-19, 2019.
Presentation transcript:

SISO Implementation Study Group for C4I-to-simulation Interfaces (ISG-C4I) Joseph Lacetera Spring 1999 SIW March 1999

Background  A key issue for the C4ISR M&S community is standardization of the interfacing of real C4I to simulations  Standards for C4ISR interfaces are being developed simultaneously by both the C4I and M&S communities  M&S community is moving on a path towards standardizing interfaces on emerging HLA approaches  DoD C4I community is moving to standardize on the JTA and the Defense Information Infrastructure Common Operating Environment (DII COE)

SISO Role  SISO provides a forum for the interchange of new ideas, concepts, and technology across the broad M&S community, and lays the groundwork for subsequent standards development  As an intermediate step between the presentations and working group meetings at the workshops and actual standards development, SISO also charters Implementation Study Groups (ISG) to study specific M&S issues that may ultimately bear on the development of standards

ISG-C4I Administration  TOR presented to CC and SAC prior to Spring 99 SIW  ISG-C4I approved by CC and SAC 14 March 1999  Those interested in being members of the ISG-C4I are invited to subscribe to the SIW-ISG-C4I reflector

Purpose of ISG-C4I  Bring together key players  Study feasibility of potential approaches for development of C4I–to-simulation interfaces  Objectives  Reduction of the number of C2-to-simulation interfaces to a small number of connection solutions at the between the COE and HLA- compliant RTIs  Develop processes for matching the standards being developed for the HLA which govern simulations and those of the JTA which govern real systems  Make recommendations for standards development (SDGs)

ISG-C4I Working Process  Chair will revise draft TOR based on discussions/feedback during and after Spring 99 SIW  Exchange of ideas is expected to occur via the ISG-C4I reflector (including material for comment and review)  General policy of the ISG-C4I will be to make available preliminary and final products as soon as they are available, when to do so would further the goals of the ISG-C4I and the SISO community  Subgroups should produce SIW papers  Chair will write summary paper/report  Final Product/Products will list all contributors

ISG-C4I Schedule  An interim ISG-C4I meeting may be held in summer 1999  There will be a regular meeting of the ISG-C4I during the September 1999 SIW  Progress/product-status report  Interim ISG-C4I meeting around January 2000 if necessary to finalize ISG-C4I products prior to the March 2000 SIW  Final task and product reported at the Spring 2000 SIW

Status of ISG Products  ISG products should be viewed as steps toward development of material which may be useful in the creation of SISO standards or other SISO products by a Standards Development Group  ISG products are not expected to have the stature of a formal SISO product (such as a SISO standard) themselves, but ISG-C4I products and reports are expected to identify areas for further study and discussion and/or may contribute directly to the development of one or more Standard Nomination submissions

ISG-C4I Membership Officers  ISG-C4I Chair:Joe Lacetera  ISG-C4I Vice Chair:Don Timian  CC POC:Rick Severinghaus  SAC POC:TBD Forum POCs/Liaisons:  RPR-FOM GroupKeith Briggs  C4I ForumJohn Roberts  SLTChris Wertman Other initial membership  Doug Flournoy, Mike Hieb, Bob Leath, John Roberts, Rick Severinghaus, Ron Sprinkle, Ken Sullivan, William Sudnikovich, …  ISG-C4I membership/participation is open to all who wish to contribute

ISG-C4I Considerations/Tasks  C4I Interface Technical Reference Model  Data standards that can link systems to simulations  C4I, C2, other Reference FOMs  C4I-to-simulation interface lexicon w/bibliography  Information Modeling as a part of the FEDEP for C4ISR  C4ISR CMMS

ISG-C4I Considerations/Tasks cont.  Other related tasks to be identified by group  Impact of CCSIL  Communications Effects Federate (impact on CVL)  Effects of environment  transfer/authentification of data/metadata  data coherence (redundant feedback loops)

ISG-C4I Process  Chair will post sub-tasks (with expected completion dates) which will contribute to accomplishment of the identified ISG-C4I tasks  Members may comment upon and suggest revisions to the sub-tasks and volunteer to be responsible for them  Chair will modify sub-tasks as appropriate and assign completion responsibilities  Individuals responsible for drafting material will post it on the ISG-C4I reflector for review/comment/revision  When material is considered essentially final, those enrolled on the ISG-C4I reflector will be asked to vote on its acceptability as an ISG-C4I product

Products  Intermediate Products to be determined  SIW papers by subgroups  Summary Report  Formal Product Report  Recommendations on simulation-to-C4I interface standards  C4I Data and Interface Lexicon Bibliography of references that support the findings of the ISG  Products/papers and other references available on C4ISR web site

Summary  C4I-to-simulation interfacing presents complex problems  SISO SIWs and reflector environment is appropriate for key players to convene to explore potential solutions  ISG approach will bridge gap between current status and standards development  ISG-C4I has twelve months to produce final products