POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Payload Crew Conference :30 PAYLOAD-CREW-CONF (at least twice per increment, monthly preferred)

Slides:



Advertisements
Similar presentations
Company Confidential Registration Management Committee (RMC) 1 Documentation Subteam Report Fort Lauderdale, FL March 18-19, 2013 Bryan Milne Gulfstream.
Advertisements

A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
EMC Quiet Planning During Science Operations Andrew Walsh & Chris Watson Solar Orbiter SOC, ESAC, Madrid EMC Working Group #12, Imperial College,
Flexible Work Schedule. ▸Flexible Work Schedule ▸Non-faculty positions ▸Exceptions- ▸Performance Issues ▸Presence critical during standard work hours.
IDA725: Project Management Presentation of Exercise 3
Equipment Module Usage Tracking, Repairs & Maintenance.
Web-Managed Audio Conferencing. Slide 2 Agenda Customer Objectives Ensemble Web-Managed Audio Conferencing  Features  Web Interface  Administration.
Project Management Methodology Development Stage.
College of Information Systems & Technology © 2001 University of Phoenix. University of Phoenix is a registered trademark of Apollo Group, Inc. in the.
Jobs & Drawings (Deliverables) in New TIMESHEET system TIMESHEET Screens.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. Example 1-Ad A.
Introduction to Payload Planning Will Kirby (256)
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
1 Increment 1 Lessons Learned Many things are not happening as predicted. Major differences are: –Scheduling and stowage –Turnaround times for troubleshooting.
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory First Contact Package for KSC Payloads #3 of 5 June 5, 2013 Getting.
Mission Planning Process Changes Gary Rowe Mission Planning Team Lead Teledyne Brown Engineering Presented to: Increment 3 POIWG June 13, 2001 Mission.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL.
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
Lisa Prendergast EO20/ Operations Lead January
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama OCR Etiquette Jimmy Whitaker.
EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Crew Additional Activities Unattended EMCS Facility Cleanup Post Gravi-2 Ops EMCS-GASRMV MOD-RPL :20.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.
SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
Date: August 5, 2004 Originator: Angela Marsh/FD42 Page: 1 Payload Planning System (PPS) User Requirements Collection (URC) POIWG Status August 5, 2004.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
Increment 8 Planning Lessons Learned Teri Mears Increment 8 LPP July 13,
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
Revision E 12/19/12 PARC/E. Litkenhous JAXA-SDRM WGVOPN-PLC PRO-SDRM ACT-CMD 1:00 SpaceDRUMS Experiment Operations SDRM-EXP-POWER UP Nominal Operations.
How Writers Can Thrive in Agile Gavin Austin 2013 Agile Conference 16/05/ 徐逢均 修訂.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
Artificial Intelligence Personal Assistant Named Amy Interacts with Your Office 365 Calendar to Schedule Meetings and Save You Valuable Time OFFICE 365.
BSA 502 Week 3 Team Assignment Human Resources Paper ( Riordan Manufacturing) The paper discuss the existing HR systems within Riordan Manufacturing, Inc.
FTA and ADOT Grant Asset Management Requirements
ERCOT CRR Update to CMWG
BEHAVIOUR DIAMOND Overview
in All Office 365 Apps for Enterprise Companies
AAQG RMC Documentation Sub-Team Report & Procedure Overview
New Business Processes
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Top Ten eIRB Application Mistakes
Description of RFW Removable Front Window (RFW) will replace current window with no modification to the MSG Work Volume Structure (estimate 1.5 Hours for.
مدیریت استراتژيک منابع انسانی
Developing a Budget Basics for drafting and maintaining a budget for simple tracking and reporting.
Planned Visitor Parking Rate Increases Fall 2019
Ռազմավարական կառավարում
Copyright © 2013 Elsevier Inc. All rights reserved.
© All Rights Reserved.
Modeling Cross-Cutting Relationships with Allocations
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
2019 Gas-Lift Workshop Chair: Steven Freeman, Shell Oil Company
Forms.
Chapter 08.
Proposal to Change IPv6 Initial Allocation Criteria
Floream Days.
© 2015 Elsevier, Inc. All rights reserved.
VDO – Conference Procedure Point to Point Connection
© 2015 Elsevier, Inc. All rights reserved.
Presentation transcript:

POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Payload Crew Conference :30 PAYLOAD-CREW-CONF (at least twice per increment, monthly preferred) Crew :30 Time Critical

POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 POIC Weekly System Maintenance 5:00 POIC-WKLY-SYS MAINT (every Tues GMT 2130) Unattended

POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 POIC Voice Outage 1 1:00 POIC-VOICE-OUTAGE 1.Scheduled by OCR. Unattended

POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes EO10-PPO Revision A 31/32 & Subs 12/8/11Nominal: 2 Reserve: 0 Inc 31/32 Working PTP 10/31/11 Nominal & Reserve: na Payload crew conference time is currently not tracked under any PTP allocation. EO10-PPO Revision B 33/34 & Subs 6/28/12Nominal: 2 Reserve: 0 Inc 33/34 Working PTP 5/11/12 Nominal & Reserve: na Payload crew conference time is currently not tracked under any PTP allocation. EO10-PPO Revision C 35/36 & Subs 12/19/12Nominal: 2 Reserve: 0 Inc 35/36 Working PTP 10/24/12 Nominal & Reserve: na Removed audio config activity per latest video/audio modeling guidelines. Payload crew conference time is currently not tracked under any PTP allocation. EO10-PPO Revision D 37/38 & Subs 6/13/13Nominal: 2 Reserve: 0 Inc 37/38 Working PTP 4/29/13 Nominal & Reserve: na Payload crew conference time is currently not tracked under any PTP allocation. EO10-PPO Revision E 39/40 & Subs 12/12/13Nominal: 2 Reserve: 0 Inc 39/40 Working PTP 10/21/13 Nominal & Reserve: na Payload crew conference time is currently not tracked under any PTP allocation. Pod651OCR39/40 & Subs 12/20/13--Increased maintenance window duration to 5 hours. parcall EO10-PPO Revision F 43/44 & Subs 8/10/15--Removed POIC-POWER-OUTAGE. HOSC no longer requires annual outage. Added PPO document number. PPO Change Log *Crew Roll-up is not maintained real-time.