Paolo Michelato, July 19-22, 2006 Global Design Effort 1 Vacuum system segmentation Cold vacuum system segmentation reflects the cryogenic structure of.

Slides:



Advertisements
Similar presentations
20 July 2007 Tom Peterson CEC ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Basics of Vacuum Technology Unit: Pa = N/m 2 = J/m 3 UnitPa or N/m 2 bar10 5 mbar100 atm= 760 torr x 10 5.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
Training in Vacuum Technology for JUAS 2013 Students
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
Road map of the workshop Machine availability: – “work-horse” in the injection chain – 100% availability not viable,.What is achievable? And at which cost?
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Consolidation and Upgrade plans for the LHC Vacuum System
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20 July 2007.
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
Vacuum tank relief for Super-FRS long multiplet cryostat CrYogenic Department in Common System (CSCY) GSI, Darmstadt Yu Xiang.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Experience for vacuum plants during XFEL cavity production at companies and at LASA Paolo Michelato TTC Topical Workshop on SRF Cryomodule Clean Room Assembly,
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
ESS Vacuum Standardization
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
Thin Film Technology - Student Talk Sophie Chauvin 02/02/16 Leak Detection method for Vacuum Systems 1.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
RGAs at the companies during XFEL cavities production and cavity performances Paolo Michelato INFN – LASA Paolo Michelato, TTC Meeting at Saclay, July.
Vacuum Systems for Electron Microscopy Constraints on Specimens Specimens placed in the electron microscope must be able to withstand very high vacuum.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Introduction Six-Month Follow-Up on Action Items of Feb 2016 CEBAF Field Emitter Workshop Rongli Geng September 12, 2016.
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
Cryomodules as Part of the ILC Cryogenic System
Cryogenic behavior of the cryogenic system
1.3-GHz Cavity Vacuum Furnace at IB4
DESY Experiences on Use of Gas overlay during Assemblies
Mark Pendleton – STFC Daresbury Laboratory
RTML Vacuum System RDR Summary FermiLab October 24, 2007
SAES Project: Combination of NEG module and sputter ion pump
MICE Safety Review Meeting 4th Oct 2011 PJ Warburton - Daresbury Lab
K. H. Lee, H. Y. Lee, Young-Gi Kim, J. Yang, S. M. Yang, K.J. Chung, Y.S. Na and Y. S. Hwang Residual Gas analysis during Glow discharge cleaning, Baking.
Leak Detection Tutorial Work
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
Definition of work flow for string DESY Example on critical operation
XFEL Vacuum System Commissioning
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
J.M. Jimenez On behalf of TE-VSC group
ILC Cryogenic Systems Draft EDR Plan
WP 3 coordination meeting Saclay May 2008
Summary of NEG material, installation configuration
Which Parts Get Affected Due to a Bad Radiator
RF test results of SRF cavity evacuated with NEG pump
TTC Hot Topic Common Questions
Safety Moment Vacuum Trap Safety.
ISRC and LEBT Vacuum System Design
Cryogenic behavior of the magnet
Tom Peterson, Fermilab 6 December 2011
Vacuum System Design for the Target Monolith System
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Paolo Michelato, July 19-22, 2006 Global Design Effort 1 Vacuum system segmentation Cold vacuum system segmentation reflects the cryogenic structure of the linac. After 6 June videoconference the insulation vacuum breaks should be every 140 m? Tom Peterson, 13 June 2006

Paolo Michelato, July 19-22, 2006 Global Design Effort 2 Beam line vacuum system 1/2 142 m 571 m (4 strings) Ion getter pump LD 2 TMP pumping units with high sensitivity LD and RGA, safety, clean venting system, slow start pumping etc. LD RGA

Paolo Michelato, July 19-22, 2006 Global Design Effort 3 One 55 l/s ion pump should guarantee reasonable low H 2 pressure and He pressure in case of small leaks. Other gases are cryopumped. 2 dry pumping units with LD, RGA, slow pumping, controlled venting are foreseen in case of ion pump replacement. They are also used, during the string connection, for the pumping of the intermediate piece between the two all metal gate valves. Beam line vacuum system 1/2

Paolo Michelato, July 19-22, 2006 Global Design Effort 4 Beam line vacuum system 2/2 571 m 2288 m All metal Gate valve LD 2 TMP pumping units with high sensitivity LD and RGA, safety, clean venting system, slow start pumping etc. LD RGA High speed safety shutter Special cold gate valve 150 l/s Ion pump

Paolo Michelato, July 19-22, 2006 Global Design Effort 5 Special 4K operating gate valves, only for failure scenario, are foreseen between each 571 m segment. The should be leak tight during warm up. Not available on the market: DESY and VAT are working on that. Quite expensive! All metal fast shutters + all metal gate valves protect the two cryogenic units in case of air inrush in the room temperature part. –Distance should be > 10 m between sensor and safety system: protection is not optimized. Beam line vacuum system 2/2

Paolo Michelato, July 19-22, 2006 Global Design Effort 6 A 150 l/s ion pump will ensure proper low pressure in case of relative significant gas production in the room temperature part. 2 dry pumping units with LD, RGA, slow pumping, controlled venting are foreseen for the first pumping and in case of ion pump replacement. Beam line vacuum system 2/2

Paolo Michelato, July 19-22, 2006 Global Design Effort 7 Beam line vacuum system costing The leak detector connected to the TMP is not an usual Leak Detector. It has to work on UHV, and not in counterflow. May be not available directly on the market and needs some effort. Some product on the market may be ok with relative small modification as the LDS 1000 Inficon or equivalent from Varian or Alcatel. Pumping system needs special characteristics as slow pumping, clean venting for the reduction of the risk of moving or producing particles. Safety shutters are expensive (18000€), probably the distance is too small to ensure the best reduction of air inrush.