Jan. 22-23, 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings, Add Thermocouple Labels
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
October 30, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Geoff Pile, Dean R. Walters, Soon-Hong Lee,
Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters.
Dean R. Walters April 20, 2006 Vacuum Chamber Review 1 LCLS Undulator Vacuum Chamber Dean R. Walters.
Marion White Magnets & Supports April 16, 2007 Undulator Magnets and Supports Status.
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Dean R Walters November 15, 2004 Integration of the Vacuum and Diagnostics with the Undulator By Dean R Walters APS.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Geoff Pile LCLS Und. System FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Update FAC Review October 29 th (30 th.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 RFBPM Windows Joining Effort Undulator System W. Toter, D. Bromberek, F. Depaola,
Oct. 12, 2006 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
SCHEDULE Nov 1st - Assembly Table Complete
FFAG Magnets and Girders Meeting
Diffuser status October 2017
Beam Finder Wire Assembly Undulator System
LCLS Extruded Vacuum Chamber Status
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
LCLS Undulator System Detailed Report
Linac Coherent Light Source Procurement
Undulator Scope, Management, and Organization
e-Beams Systems Update
Injector / Linac Installation Current Status
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
LCLS Undulator System Production Management
LCLS Undulator System Status
Undulator Scope, Management, Organization
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
E-Beams Systems Manager
LTU/Undulator Installation Status
LCLS Vacuum System Plans (July 07)
LCLS Undulator System Status and Schedule
Undulator Long-Lead Procurement Preparation
Undulator Integration Test Status
Electron Beam Systems ETC and Methodology
LCLS Undulator System Detailed Report
Undulator Assembly and Installation Planning
Undulator and Magnet Production Status 25 October 2006
Undulator Alignment Plan
LCLS Undulator Vacuum Chamber
Undulator Systems Integration
LCLS e- Beams Systems Manager
Presentation transcript:

Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters

Jan , 2008 LCLS Undulator Week Dean R. Walters 2 Major Components Vacuum Chamber Support Bellows Quadrupole Spool BFW Support RFBPM Support Long Break Spool Chambers Girder Extensions

Jan , 2008 LCLS Undulator Week Dean R. Walters 3 Vacuum Chamber Support

Jan , 2008 LCLS Undulator Week Dean R. Walters 4 Vacuum Chamber Support

Jan , 2008 LCLS Undulator Week Dean R. Walters 5 Adjustment Mechanism

Jan , 2008 LCLS Undulator Week Dean R. Walters 6 Vacuum Chamber Support Tubular Chamber Support First Article shipped from ANL 1/13/08, expect arrival at SLAC on 1/23/08 Expect balance to ship 2/16/08 Adjustment Mechanism Expect First Article to ship1/24/08 Expect final group 1 (35) to ship 2/22/08

Jan , 2008 LCLS Undulator Week Dean R. Walters 7 Bellows

Jan , 2008 LCLS Undulator Week Dean R. Walters 8 Bellows E Flange and Bellows Assy. Award No: 8A Award Date: 01/11/2008 Supplier: APPLIED ENERGY SYSTEMS INC Delivery Date: 05/11/2008 Based on the vendor's delivery schedule in the quote, It is expected on 02/16 for 1st article and completion 03/16 E for Beam Tube Award No: 8A Award Date: 01/16/2008 Supplier: WALCO TOOL & ENGINEERING CORP Delivery Date: 03/16/2008 It is expected on 02/16 for 1st article and completion 03/16 Cleaning, baking, and assemble at the APS before sending to SLAC Best estimate for the completed units 2/25/08 for the First Articles and the balance by 3/25/08

Jan , 2008 LCLS Undulator Week Dean R. Walters 9 Quadrupole Spools First Articles are at ANL Aluminum was plated onto parts

Jan , 2008 LCLS Undulator Week Dean R. Walters 10 Quadrupole Spools Best estimate of shipping (3) First Articles is 1/28/08 Balance to ship 2/21/08

Jan , 2008 LCLS Undulator Week Dean R. Walters 11 BFW & RFBPM Support BFW Support First Article planned to ship on 1/24/08

Jan , 2008 LCLS Undulator Week Dean R. Walters 12 Long Break Chambers The requisition for this has just recently been written. Seeking delivery of this to be 8 weeks. Chambers will have to come to ANL for leak check, clean, and bake.

Jan , 2008 LCLS Undulator Week Dean R. Walters 13 Girder Extension The requisition for this has just recently been written. Seeking delivery of this to be 8 weeks.