Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.

Slides:



Advertisements
Similar presentations
Nodal Credit Limit Overview Credit Work Group May 28, 2008 Cheryl Yager.
Advertisements

NPRR 206 DAM Credit Requirements Reduction: E Values and Percentiles Luminant Proposal.
NPRR Proposed Changes TPTF Meeting 26 Aug 2008.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
WMS Subgroup – CRR Credit 3.Review of CRR margining methodology for PTP Obligations in Nodal Protocols 4.Potential credit margin alternatives Cheryl Yager.
Board of Directors Credit Aspects of Mass Transition.
Training NPRR 206 and “e” Factors August 10, 2010 NPRR 206 and "e" Factors.
ERCOT Credit Loss Model Mark Ruane Credit Work Group / Market Credit Work Group ERCOT Public April 22, 2015.
Market Credit Working Group update to the Wholesale Market Subcommittee 06/03/
1 CRR Credit Policy Task Force Update WMS April 16, 2008.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
October 20, 2010 WMS Credit Update. 2 Topics Nodal exposure – how much collateral CRR/TCR auctions – December 2010 Preliminary Credit Cutover Timeline.
Transmission Congestion Rights – Credit Perspective April 17, 2014.
1 DAM Credit parameters review The “Procedures for Setting Nodal Day Ahead Market (DAM) Credit Requirements Parameters” is a document that is required.
Nodal Credit DAM Non-Business Day Treatment of Available Credit Limit (ACL)
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Market Credit Working Group Update to WMS Wed. Sept 16, 2009.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Carrie Tucker Supervisor, Day-Ahead Market DAM data supporting MCWG/CWG credit parameters discussion February 29, 2012.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
Market Credit Working Group Update to WMS Wed. Oct 20, 2010.
1 Nodal Credit Update at WMS June 16, 2010.
ERCOT CWG/MCWG April 24, 2013 DAM Credit Parameters.
Market Credit Working Group Update to WMS Wed. Nov 18, 2009.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
Market Credit Working Group update to the Wholesale Market Subcommittee 02/04/2015.
Total Potential Exposure (TPE) Overview Credit Work Group May 28, 2008 Cheryl Yager.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 Nodal Day Ahead Invoice Taskforce Update COPS, May 8, 2007.
Randy S. Baker Director, Credit Risk Management F&A Committee – Preview for CWG / MCWG October 20, 2009 Potential Credit Risk Model Quarterly Update: Q
MCWG Update to WMS 2/9/2010. Agenda Items Exposure / Collateral Status Update 1/26 MCWG/CWG Joint Meeting – Potential NPRR to enable expiring CRRs to.
DAM Collateral Requirements Carrie Bivens Manager, Day-Ahead Market Dec 16,
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
DAM and Nodal Collateral Requirements Concerns and Solutions December 7, 2009.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department September 28, 2006.
WMS – Nodal Credit Integration Start Up May 19,
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
CRR Default and the Nodal Market Wholesale Market Subcommittee February 20, 2008.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
DSWG Update to WMS March 22, Demand Side Working Group Goals.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
MCWG Update to WMS 3/9/2010. Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 1/31/11 remains less than Zonal Estimated.
Initial Estimated Liability (IEL)
CRR Deration and NPRR821 WMS 09/06/2017.
Credit Reports Vanessa Spells COPS Meeting ERCOT Public
CMM Tech Refresh Project Update
Hourly Offers Schedule Update Examples
Exceptional Fuel Costs in LMP
DALE MCWG / CWG 3/10/2010.
LCRA Comments regarding NPRR 821
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Future Credit Exposure (FCE)
John Dumas Director, Wholesale Market Operations
Proposed Credit Policy For Virtual Bidding
Market Credit Working Group update to the Wholesale Market Subcommittee 9/27/2017.
CMM Tech Refresh Project
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Further Information on MISO FTR Auctions
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Mod_03_18 Autoproducer Credit Cover
Market Pricing Issues: Update
Presentation transcript:

Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008

2 Market Concerns  The current collateral requirements for QSEs to participate in the DAM are significant and based on potential offers and bids and not what is actually cleared through the market. Thus, market participants have an increased cost of credit.  Some are concerned that the significant collateral requirements on QSEs will discourage market participants from participating in the DAM, which will create inefficiencies and additional volatility. Additionally, unhedged QSE load in the DAM will result in increased default risk in real time.  CWG has been briefed on the issue and the WMS/CWG joint task force has meet to discuss possible solutions Requesting WMS to endorse one of the near-term solutions so the task force can move ahead and develop necessary language. Additionally, request WMS/CWG to further develop a long-term solution that offer the best resolution for the market

3 Daily Credit Calculations Available Credit Limit (ACL) is the credit line available for the QSE to participate in DAM & CRR auctions The Counter Party’s ACL is equal to the net of its Unsecured Credit Limit plus Collateralized Credit Limit minus the Total Potential Exposure (TPE) Collateral requirements for DAM Credit Validation is significant and conservative-  For each DAM Energy Bid : the bid Quantity X bid price  For each DAM Energy Offer : the offer quantity X (95 th percentile of the hourly difference between RT and DAM SPP over the previous 30 days for that hour)  For DAM Energy Bids and DAM Energy Offers at the same SPP : the max credit exposure for the Energy Bid or Offer  For AS not self-arranged : the quantity of the AS X (95 th percentile of the hourly MCPC for the service over the previous 30 days for that hour)  For PTP Obligation Bids :The sum of quantity of the bid X (bid price, if positive, + the 95 th percentile of the hourly basis difference over the previous 30 days for that hour)

4 The Low Risk Market Player QSE 1 has 1000 MW physical generation & 500 MW load obligation  In DAM, QSE 1 Offers 1,000 MW of DAM 3-Part Energy Offers & 500 MW of DAM Energy Bids  QSE 1 would need collateral for –DAM 3-Part Energy Offers at Hub = offer quantity X (95 th percentile of the hourly difference between RT and DAM SPP over the previous 30 days for that hour) 1000 X $4/MWh = $4,000 –DAM Load Obligation at Load Zone= the bid Quantity X bid price 500 x $50/MWh = $25,000  Total Credit requirements of $29,000 while QSE 1 net physical position of 500 MW is over-collateralized by DAM validation process

5 The High Risk Market Player QSE 2 has no physical generation & 500 MW load obligation & 1000 MW virtual generation  In DAM, QSE 2 Offers 1,000 MW of DAM Energy Offers & 500 MW of DAM Energy Bids  QSE 2 would need collateral for –DAM Energy Offers = offer quantity X (95 th percentile of the hourly difference between RT and DAM SPP over the previous 30 days for that hour) 1000 X $4/MWh = $4,000 –DAM Load Obligation = the bid Quantity X bid price 500 x $50/MWh = $25,000  Total Credit requirements of $29,000 while QSE 2 was under- collateralized the basis risk and no show risk

6 Loss Comparison given Default RiskLow Risk PlayerHigh Risk Player RT-DA > $4/MWhHigher heat rate units dispatched < Collateral Required for RT Buy back energy at loss & collateral required > by delta RT-DA > $4/MWhHigher heat rate units not dispatched < Collateral Required for RT Buy back energy at loss & collateral required > by delta Tim- please provide additional details

7 Near Term Credit Solutions Reduce the impact of short term market price anomalies by either removing the data from the historical price distribution for energy offers  For example, reduce the 30 day 95 th percentile distribution to a XX th percentile based off MCPE analysis Distinguish between actual offers from physical assets and virtual units by reducing collateral requirements for 3-part energy offers  3-Part energy offers are credited back if the energy offer price would be reasonably struck based off the historical 30-day average Settlement Point Price (we are checking with Credit Management and Monitoring system team on the time to implement)

8 Long Term Credit Solutions Establish a policy that acknowledges on an individual basis the Market Participants credit worthiness, risk management practices, and historical performance (update Unsecured Credit Policy)  For example, for groups of Market Participants that meet a predetermined criteria, apply a multiplier greater than 1.0 to the pre- DAM available credit line Net out bids and offers volume if QSE has physical assets to cover the position for 3 part and energy-only offers Based off historical performance and good payment history, perform an analysis to provide some credit back DAM energy bid calculation Other alternatives to be discussed