DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.

Slides:



Advertisements
Similar presentations
Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
Advertisements

VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
By E. Anassontzis, A. Belias, E. Kappos, K. Manolopoulos, P. Rapidis on behalf of the KM3NeT Collaboration.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
INSTRUMENTATION NEEDS FOR THE CALIBRATION UNIT …AS A WORK DOCUMENT Pascale Keller KM3Net Meeting CPPM, january 2013 Inputs from : Miguel Ardid, Tassos.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
KM3NeT Offshore Readout System On Chip A highly integrated system using FPGA COTS S. Anvar, H. Le Provost, F. Louis, B.Vallage – CEA Saclay IRFU – Amsterdam/NIKHEF,
VEOC Vertical Electro – Optical Cable and BEOC Breakout Electro – Optical Cable 1 Development Status F19 F18 F1 F20 S2 S1 B KM3NeT General meeting Jelle.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
Internal Structure of Multi PMT DOM
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
Electronics Department Amsterdam 5-July-2010 Sander Mos 1 Status and progress of NIK* Logic WPFL - 5 July 2010 Amsterdam * Network Interface Kit.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
Global overview of the Optical Network for KM3Net Phase 1 Sander Mos KM3NeT Collaboration Meeting 30 January 2013 Marseille.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
Antares/KM3NeT M. de Jong. Antares  2000NL joined collaboration (3.3 M€)  2006 ‒ 2008construction  2006 ‒ todaydata taking 24h/day  2012MoU signed.
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
Agenda Mededelingen – equipment for rope stretch test arrived – ropes SK78 40 m for tests arrived – rope DM20 offer asked (6 x 1 km) (1 euro / m, deliverty.
Status report Els de Wolf Annual Meeting 2011, Nikhef.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Update on general technology From DOM electronics to KM3NeT subsea infra structure Interaction with other scientific projects Interaction with industries.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
PPM-DU (WORKING DOCUMENT, DO NOT PUBLISH) A three DOM Detection Unit in place of an Antares string. Nikhef for KM3NeT: PPM-DU optical network DRAFT!, designed.
CEA Saclay – Institute of research into the fundamental laws of the Universe PPM DU Pre Production Model Detection Unit Status and plans Th. Stolarczyk.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
Organizing future KM3NeT production 06-July-2010.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
CLB demonstration board & prototype tests (CLB: Central Logic Board) 1 WPFLElectronics PPMCLB F. Louis.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
The electro-optical cabling system for the NEMO Phase-2 tower Antonio D’Amico INFN - LNS.
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
Electronic department 5/7 July 2010, KM3NeT meeting at Nikhef - Mar van der Hoek et.al. Status and experiences with oil-filled Pressure Balanced backbone.
DU power Principle diagram OM inventory Conversions VEOC behavior DU to network Pending issues mPMT-Bar.
Multi-PMT DOM P.Kooijman University of Amsterdam-GRAPPA Presentation for SSC.
Pre-Production Models for KM3NeT
Off & On Shore Electronics overview KM3Net APC Paris 05 / 09 / 2012 Frédéric LOUIS.
PPM 30/10/2012. In-situ validation programme Oct/Nov 2012: VEOC prototype in Atlantic (monitor fibres, pressure) Dec(?) 2012: multi-PMT.
White Rabbit and KM3NeT Peter Jansweijer, on behalf of KM3NeT
Status Optical System KM3NeT
Deep-sea neutrino telescopes
DAQ read out system Status Report
Diego Real, IFIC Spain, KM3NeT Electronics Coordinator
On behalf of Patrick Lamare
Write-up and Definitions for Cost Model
Front-end Electronic for a neutrino telescope : a new ASIC SCOTT
PPM: Description of the KM3NeT network by WP H
P.Kooijman, UVA-GRAPPA, UU, Nikhef
Status DU deployment and detector layout studies
Concluding remarks E. Migneco
Els de Wolf, Nikhef/UvA KM3NeT WP345-meeting 23 February 2009
Els de Wolf 20 February 2012, Catania
Junction Boxes for KM3NeT
PPM-DOM. SPM DOM LCM SS-part ILxx
Front-end electronic system for large area photomultipliers readout
Final (?) line_0 configuration (follows steering group consideration 5/5/2004) Line Zero meeting, Nov
Nanobeacon: A low cost calibration instrument for KM3NeT
Presentation transcript:

DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L

Mini DOM motivation To measure the L1 coincidence rates as a function of the space angle between the axes of the PMTs. Use of the infra structure of Antares Gain of knowledge versus planning Comparison with Antares tube WP F-L

Antaris-OM to mini DOM PHOTOTUBE Ø 77mm D D D WP F-L

Mini DOM layout WP F-L

Mini DOM mechanics a b External part of the vacuum valves. (a) the new brand, (b) the old brand. arguments ab Internal part of the vacuum valves. (a) the new brand. (b) the old one. WP F-L

Mini DOM electronics WP F-L

Mini DOM measurements

Mini DOM status All mechanics available for integration Electronics & PMTs tests going on at CPPM WP F-L This week

Breaking News : First time slices of the mini-DOM output in the lab.

ADCPCamera OM hydrophones CT ADCP Camera OM hydrophones C-Star O2O2 CT SV hydrophone LB 14.5m 80m 14.5m 80m 98m IL11 PPM-DOM OM? Mini-DOM? In situ qualification of the BEOC (storey part of the backbone) PPM-DOM in Antares motivation Validation of the DAQ system with data rates Validation of clock distribution on Ethernet and time stamping Validation of timing calibration Validation of the optical data transmission with REAM 1 st comparison between piezos and hydrophones Coincidences between PMTs Comparison with Antares OMs WP F-L

PPM-DOM = standard KM3NeT DOM DOM Weight30 kg air Weight -15 kg sea Support Weight3 kg air Weight 2kg sea WP F-L

DOM mechanical overview Nano beacon Hydrophone Temperature Piezo PMT WP F-L

DOM sensors PMT ETEL Hamamatsu Piezo sensor Hydrophone Nano Beacon Compass Tilt WP F-L Aucuboard

DOM electronics Upper hemisphere Cooling shield Alluminium Folie Thermal conduction Electric isolation Power conversion board Central logic board Optical line terminator Acoustic board Nano beacon Alluminium plate (cooling, rf shielding) Distribution boards to PMTs WP F-L

Distribution to / from PMTs Nicknamed; Octopus board Χταπόδια Pulpo Piovra WP F-L

PPM-DOM functions WP F-L

CLB test setup CLB GPS ML 507 ML 605 Ethernet Switch SACLAY test bench LMK 0300 WP F-L

DOM-LCM cable (BEOC) Penetrator into Optical Module 6 electrical wires (3x UTP) 2 fibres Bendbright Dry mateable connector on to LCM 2 electrical wires (1 UTP) 2 fibres bendbright 0.3m 1m DC/DC Vin: 400Vdc Vout: 12Vdc Pout: < 18W ƞ: > 90% Equipressure cable (PBOF) Hydrophone Seacon Ti connector WP F-L Dry mateable connector 2 x UTP Vent / fill for oil Tube knee Bent limit tube for fiber Position ring Silicon Isolation stud Titanium house

40 km SS-part MOD + Drivers λ8λ8 λ1λ1 REAM 1λ CW+1λ 2xCu 50/50 DOM APD 2 Lasers tunable PIN VOA A C1 LiNbO3 Available wavelengths λ 4 = C33= nm λ 5 = C37= nm λ 6 = C41= nm Junction Box λ4λ4 D1 LiNbO3 λ8λ8 λ1λ1 D4 A3 +? D2 A&D λ1λ1 λ8λ8 D3 λ4λ4 λ4λ4 λ5λ5 λ5λ5 Nikhef for KM3NeT: PPM DOM in Antares, designed by Nikhef Optical team. v4 SPM Antares DWDM crate λ5λ5 80/20 SMA C2 λ1λ1 λ8λ8 LCM A C2 Existing component Supplement to existing component New component ILxx on/off PPM-DOM Antares Geographics λ5λ5 WP F-L

Integration in LCM  2 ARS_MB not present (The 3 rd one could be removed)  Acoustics boards not present Compass MB Converter board ARS MB CAMETH DAQ boardCAMPOW Clock board Free slot 4 Optics LPB side Connectors side Free slot 3  Install optical components  Install a new converter board (380V/5V)  Control the VOA with DAC on the Compass board (used to set the OM HV)  May be optical components splitted in 2 slots LCM crate storey 1 WP F-L

Shore components WP F-L

Status  Project going on smoothly  Optics defined and mainly ordered  Optics on critical path  Detailed integration study in LCM will start  KM3NeT project with high priority WP F-L

PPM-DOMs to KM3NeT site 3 PPM-DOMs on mini tower in Capo Passero Other dummy DOMs with compensation for center of gravity and center of buoyancy Different optical network design VEOC has to be validated BEOC has to be validated WP F-L

After the PPM Critical Availability of CLBs and software in time (withdrawn of Saclay contribution) Power evaluations Power conversion 690 mW Central logic board5410 mW Octopus board short 120 mW Octopus board long 180 mW PMT bases (31)1090 mW External 690 mv1 Evaluation FPGA Xilinx Altera Actel Aware WP.pdf Lattice PMTs, base evaluations Base driver ASIC upgrade Analogue output ASIC upgrade Different form factors of PMTs Integration of mezzanine boards Evaluations of satellites Hydrophone connection Temperature system of NIOZ PORFIDO Optimizing assembly and test procedures Tender rules PORFIDO COCO PROMIS-v1 WP F-L