Building a Transportation Database WMATA Rail Station Mapping Project 3/18/2014.

Slides:



Advertisements
Similar presentations
OS Places New Service Products from May 2014 Address Capture & Verification Address Matching GeoSearch Ordnance Survey 2014.
Advertisements

GIS-Based Rail Line Asset Viewer
DC Inc. Dan Corbin, Inc. 28 River Ridge Lane Cedar Falls, IA Cell: (319) Fax: (319) Photogrammetric Consultant.
Asset Management and Sewer Engineering Using GIS Integrated with Document Management in San Francisco Greg Braswell - City & County of San Francisco, Bureau.
Using GIS for Utility Mapping and Asset Management Sanitary Sewer, Storm Sewer, and Water Distribution City of Mason City Jessy Willadsen - Mason City.
Utilizing CAFM in WebTMA Lenore Marlow TMA Systems.
NSF DUE ; Laura Johnson Wen Andrews.
Mapping the Gracelawn Cemetery Information Technology/GIS
Progress Report : Design and Creation of a Geodatabase on the Colorado River Refuge Owned by Pines and Prairies Land Trust Arma-Geo Products Geography.
Design Intelligent P&ID's 3d Modeling Walkthrough & Visualization
QA/QC: A Checklist for Quality and Control
Spatial solutions for utilities and government m u n s y s®m u n s y s® right tools – proven results “Bridging the gap between CAD and GIS for Cadastral.
USING GIS TO FOSTER DATA SHARING AND COMMUNICATION SEAN MURPHY IVS BURLINGTON, VT.
Employee Exit Workflow Presenter: Wilf Schlitt Business Support and Student Data Systems College of New Caledonia Prince George, British Columbia.
Intro. To GIS Lecture 4 Data: data storage, creation & editing
Building a Traffic Signal and Sign Inventory for the City of Edmond GIS Staff updated traffic feature classes and the related objects based on information.
Object Oriented Databases by Adam Stevenson. Object Databases Became commercially popular in mid 1990’s Became commercially popular in mid 1990’s You.
Developing Health Geographic Information Systems (HGIS) for Khorasan Province in Iran (Technical Report) S.H. Sanaei-Nejad, (MSc, PhD) Ferdowsi University.
March 14, 2007 First Steps For Starting Your Parcel Database: Aurora Case Study Indiana GIS Conference Dearborn County GIS Ileana Abot.
Ref: Geographic Information System and Science, By Hoeung Rathsokha, MSCIM GIS and Remote Sensing WHAT.
The City of Fargo Master Address File Project. Discovering what the heck is out there? The City of Fargo is currently developing a comprehensive, standardized,
Support the spread of “good practice” in generating, managing, analysing and communicating spatial information Data collection for scale mapping Unit:
Objectives Overview Define the term, database, and explain how a database interacts with data and information Define the term, data integrity, and describe.
Ruth Ann Trudell NY State GIS Users Conference Lake Placid, NY October, 2009.
GEOGRAPHICAL INFORMATION SYSTEM (GIS)
How does a community maintain a storm
Calculating Walking Distance in a Hybrid Space Model.
MicroView RSC. MicroView FM™ is an add-in module for ARCHIBUS/FM that allows facilities data to be collected and verified on a Palm-based data collector.
Internet Deep Data Solutions. Current Limitations With Web Search & Data Providers Limited data sources Search engines often cater to only the most popular.
Introduction In ArcGIS, there are three basic data structures:
GIS Business Case and Geodatabase Review Solid Waste Authority April 2, 2008.
Transit Asset Inventory Development & Integration Third State of Good Repair Roundtable Tracy Beidleman Director of Programs and Grants.
Development Of A Stormwater Utility For The City Of Brunswick, Ohio John R. Woodard, MS GIS Specialist Chagrin Valley Engineering, Ltd Ohio GIS Conference.
Esri UC 2014 | Technical Workshop | Esri Roads and Highways: Integrating and Developing LRS Business Systems Tom Hill.
Update to MW-COG GIS Committee December 5, Updates Data acquisition status –Physical Transfer: Montgomery County Prince Georges County Prince William.
Matt Eitrem GIS Coordinator City of Ashland Wisconsin.
New Jersey Turnpike Next Generation Bridge Inspection Software
Software Reuse Course: # The Johns-Hopkins University Montgomery County Campus Fall 2000 Session 4 Lecture # 3 - September 28, 2004.
Co-sponsored by the MIT Libraries and IS&T GIS Lab website: Advanced ArcGIS.
Integrating and Standardizing Trails Data for West Virginia Evan Fedorko 13 April
Office of Railroad, Pipeline & Hazardous Materials Investigations Survival Factors Emergency Response.
Logo Amy Jagge, Project Manager, GIS Analyst Steven Ferguson, Assistant Manager, GIS Analyst Blake Durant, GIS Analyst, GPS Tech Jacob Waterman, GIS Analyst,
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
WHAT WE ARE LEARNING THROUGH IMPLEMENTATION TODD A. SPANGLER, PE BRENTWOOD WATER SERVICES.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Introduction to Geodatabases
Czech Technical University in Prague Faculty of Transportation Sciences Department of Transport Telematics Pavel Hrubeš Geographical Information Systems.
WV DOT Scanning Project
The Power of GIS Technology:
Confident Data Integration and QC with FME
Geographical Information Systems
Introduction to GIS GIS in Cadastral Management
INTRODUCTION TO GEOGRAPHICAL INFORMATION SYSTEM
GISC 6387 GIS WorkShop Project
Chapter Ten Managing a Database.
Washington Metropolitan Area Transit Authority
Washington Metropolitan Area Transit Authority
Integrating Survey data into a geographic information system
Transportation Forum for Northern Virginia’s Elected Leaders April 23, 2018 Presented by: Monica Backmon, Executive Director.
Geospatial Database Create Geodatabase Practical Session
GIS-Based Subsurface Exploration System
Electronic Field Study Advanced User Training
Bar Coding/Asset Tracking Implementation
QGIS, the data model, use and storage
Final Design Authorization
Esri Highway Data Maintenance Solutions: An Introduction
Zoning Map Modernization with GIS
Kimberly Sparks, GISP and Evan O’Keefe
Navigating Multiple Jurisdiction
Esri Roads and Highways An Introduction
Presentation transcript:

Building a Transportation Database WMATA Rail Station Mapping Project 3/18/2014

2  The Washington Metropolitan Area Transit Authority (WMATA, a.k.a. Metro) serves a 1500 sq. mile area that includes:  5 Virginia Cities and Counties  Arlington County  Alexandria  Fairfax County  Fairfax City  Fall Church  2 Counties in Maryland:  Montgomery County  Prince George’s County  Washington, D.C.  Metro serves a population of approximately 3.5 million with 91 Rail Stations. Metro Background

3 What exactly are we capturing for WMATA?  Station Interior  Station Exterior  Parking Garage  Space object relationships  Standard codes and names  Location Hierarchy Rail Station Data Model

4  Our Primary Objective was to capture spatial features for each rail station in the form of a geodatabase.  Step 1: Review source data provided by WMATA. i.e. CAD drawings, emergency maps, and as-built files.  Step 2: Field verification of station features as compared to existing data resources.  Step 3: Geo-reference source data to be used for digitization.  Step 4: Digitize and attribute spatial features defined by WMATA custom Schema  Step 5: Quality Control check each station database to ensure all feature classes that apply have been captured and attributed. Project Scope

5  What JMT Started with  WMATA maintains a library of as-built engineering drawings and for all rail stations. This data is in various formats.  As-built PDF documents  As-built TIFF images  Station Design Documents in the form of AutoCAD Drawing files  Emergency Maps in the form of PDF Documents for reference  Each set of documents where reviewed to determine its relevance, accuracy, ability to be georeferenced for digitization. Step 1 – Review Source Data

6 Source Data As-built PDF’s and CAD print outs used for geo-referencing

7  Station features to be captured in the geodatabase where field verified by a member of the JMT team.  Any information not found in the source data was to be recorded on the field visit to the station. Step 2: Field Verification

8  Once the data from the field and the relevant source drawings where collected the data was geo-referenced to a custom coordinate system created and used by WMATA’s GIS department. Step 3: Geo-reference Source Data

9 RAIL STATION INTERIOR – Mezzanine – MezzanineZones Kiosk FareGateArea FareCardVendingMachineArea PaidArea OpenAccessArea Step 4: Digitize & Attribute Indoor Features – Rooms – RoomDoor – Passageway – Platform – PlatformEndGate – ElevatorBank – EscalatorBank – SafetyWalk – ServiceRoomFloor – Stairways – Trackbed

10 RAIL STATION EXTERIOR – StationEntrance – Pavilion – Busbay – PassengerWaiting Area – KissRide – PedestrianBridge – PedestrianWalkway – SideWalk – ParkingLot – EntranceGate – Landscape – Lawn – Roadbed – OutstationStructure – OffsiteFacility Step 4: Digitize & Attribute Outdoor Features PARKING GARAGE – GarageRamp – ParkingGarage – ParkingGarageLevel

11  The geodatabases were then reviewed internally by JMT and turned over to WMATA as each station was completed.  After WMATA received each station various GIS tools where used to verify spatial accuracy  WMATA also created a matrix spread sheet used to help check each individual feature class and its attributes. Step 5 – QA/QC

12  Station Maps for Customers  Departmental asset tracking, and equipment location within the organization.  Maintenance and Facility management:  Tracking maintenance issues  Inventory of facilities  Space utilization  Emergency preparedness and response:  Define Emergency Evacuation Plan  Incident and crime location tracking What are the Benefits?

13 Data created in 2D

14  Emergency Exits and Rescue Areas  Rail Station Asset Mapping: e.g., camera, detection device, emergency equipment, etc.  3-D Access Paths and 3-D Rail Station Mapping  3-D Routing  Rail Station Evacuation Modeling The Future of this Dataset

15  “Rubber sheeting” tiff images often threw off what little amount of scale was retained in the scanning of the original as-built drawings.  Solution: Scratch lines using bearing and distances already on the as-builts where drawn in order to get proper scale of station features being digitized.  Features not previously defined in scope or data schema where discovered during source data review or field visit.  Solution: Domain values for feature class attributes where constantly being updated, on occasion new feature classes where added to schema.  As each portion of the station was being digitized it quickly became cumbersome to keep track of different levels within the stations as many where directly above and below each other.  Solution: Within the schema a series of attributes where created that allowed us to isolate the portion of the station being digitized with a simple definition query.  As station data began filtering in to the client different departments within the organization realized the usefulness of the geodatabase being created and began requesting additional assets or features to be captured.  Solution: Requests where filtered by the WMATA Project manager and a decision was made on whether it was within the scope of the statement of work or beyond it and set aside for future consideration. Lessons Learned

16 Thank You! Additional Resources Washington Metropolitan Area Transit Authority:

17 Connect with us… Web | Twitter LinkedIn | JMT Technology Group Phone | (202) |