HF - Fiber and PMT Purchases By Y. Onel U. of Iowa, Iowa City, IA CMS Meeting, CERN, Dec 1-8,01.

Slides:



Advertisements
Similar presentations
Cost Recovery Working Group NANC Report Billing & Collection Working Group (B&C WG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Jim Castagna, Verizon.
Advertisements

ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Procurement Management
Acquisition Process Step 1 - Requirements Definition
ATC Conference Call January 10, 2008 Thank you for joining the call. We will start the call shortly. Please enter * 6 to mute your line and # 6 to unmute.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Prequalification Process / Subcontract Lisa Conomy Construction Counsel, OSU Lane Beougher State Architect.
1 Conference Call December 7 th h 30 Agenda 1.Concerns on wording and inclusion of glossary of terms; 2.Issues: 3.Scope of RFP equipment required;
1 Last update: February 12, 2009 Is Your Selection Process Attracting the Right Consultants? Best Practices, Benefits and Insights to Using a Qualifications.
PURCHASING 101 HOW TO BEGIN. Is the purchase available from the District Warehouse?  Online catalogs are/will be available on the district web page for.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
DOL AME Grant RFPs Manufacturing Lab Equipment Pre-Award Webinar July 25, 2013.
VENDOR BREAKFAST May 1, Christine Gerlach, Director Purchasing Maria Ontiveros, Director Accounting John Birkelbach, District Legal Sloan Harris,
Hamamatsu Photonics K.K. Electron Tube Division R for ICECUBE 1.Delivery Record and Plan 2.Specification of R Test Result at Hamamatsu.
Procurement Procedure and Preparation of Procurement Plan with reference to Karnataka.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Managing Project Procurement
HF UPGRADE PROJECT Y. Onel PM June 11, Recent Highlights and News-I The PMT deliveries are now completed. Testing is going well. We had a meeting.
School District Purchasing. Purchasing Authority Arizona Statutes Arizona Statutes Arizona Administrative Code Arizona Administrative Code  Primary source.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Buy Right with the NEW Regulations. Definition A bid is a contractual procurement agreement between a school foodservice and a vendor for:  Specified.
Purchasing Overview. Fundamentals of Purchasing Procedures.
Title V Fee Committee: Answers to July 2013 Questions September 11, 2013.
CACFP Child Care Wellness Grant ODE Child and Adult Care Program.
The Department of Procurement & Contracts Purchasing Board Rule Changes effective November 1, 2004.
1 Asset Management Steering Committee Briefing on Senate Bill 408 (Access Management) August 2013 Harold Lasley, P.E. Access Management Program.
TIDEWATER GOVERNMENT INDUSTRY COUNCIL How to Analyze Party Obligations Under a Contract By Damien Walsh and Beverly Arviso.
Mr. Thilak de Silva. BSc. Eng., MSc, CEng, FIE(SL), FIET(UK), CITP(UK), MBCS(UK), MIEEE (USA) M.Sc. in IT - Year 1 Semester II
Copyright 2009  Understand the importance of project procurement management and the increasing use of outsourcing for information technology projects.
ACCOUNTING FOR CAPITAL PROJECTS Financial Policies and Procedures for the Capital Project Delivery Process Office of the CFO.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Quartz Plates R&D Status By F. Duru, S. Ayan, U. Akgun, J. Olson, Y. Onel The University Of Iowa V.Podrasky, C. Sanzeni, D.R.Winn Fairfield University.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
Office of Procurement Services.  Vendor Application Website: 
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA CMS HCAL at Fermilab Feb 6-8, 2003.
ZDC CRANE PROJECT Y. Onel September 28, Progress since last meeting Our Mock-up is found at CERN, inspected by CERN Engineering and found satisfactory.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
APA CONTRACTS TO POST-2017 ALLOTTEES July 24 - Letter to all Allottees Inviting Comment August 10 - Allottee Response August 21 - Workshop August 28 –
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA HF-RBX PRR CERN Apr 3-4, 2003.
FIRM TRANSPORTATION GAS SUPPLIER PRESENTATIONS PERCENTAGE OF INCOME PAYMENT PLAN (PIPP) GAS SUPPLIER PROCEDURE.
US Belle II Project Contracting Lead: W. Kevin Grubbs March 14, 2014.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA CMS Meeting, CERN, Dec 1-8,2001.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Overview: VHA’s Competitive Contracting Process This information is proprietary and highly confidential. Any unauthorized dissemination, distribution or.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
1 Presented to the City Council by the Planning and Development Department March 31, 2009 HISTORIC PRESERVATION ORDINANCE UPDATES.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA HF-RBX PRR CERN Apr 3-4, 2003.
Conduct Procurement-II
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RFP /2017/00033 Supply and delivery of Corporate Uniform Date: 07 July 2017 Time: 11:00.
CSP 25th November 2010 Technical agreement number 3: overview
City of Norfolk Office of the Purchasing Agent
Chapter 12: Project Procurement Management
June 27, 2017.
Educational Information System Replacement Plan Overview
Chapter 12: Project Procurement Management
Software Measurement Process ISO/IEC
RPPP Policy and Procedures Update
Amendment Invoice Task Force Progress Report
Back-End Payor Sub-Group
Amendment Invoice Task Force Progress Report
Selecting a Health Care
HOLDING MEETINGS.
IEEE P Working Group for Wireless Personal Area Networks
MULTISPORTS CENTRE PRESENTATION
IEEE SGa Project Timeline
DSG Governance Group Recommendations.
Presentation transcript:

HF - Fiber and PMT Purchases By Y. Onel U. of Iowa, Iowa City, IA CMS Meeting, CERN, Dec 1-8,01

HF - Fiber and PMT Purchases -RFP’s were sent out July 5 th -Responses were open Sept 4 th -We had a committee meeting at FNAL on Sept 13 th A.Committee on Fibers N. Akchurin P. de Barbaro I. Dumanoglu J. Freeman Y. Onel I. Schmidt B. Committee on PMT’s W. Anderson N. Akchurin J. Elias J. Freeman S. Los Y. Onel D. Winn

RFP No: : PMT’s RFP No: : Fiber QP Hamamatsu9766 pts EMI8704 pts Photonis4864 pts Polymicro9680 pts Lucent8472 pts Ceramoptec7322 pts

Proposal Evaluation Criteria Price, Technical specs, Performance factors with bidder’s ability to meet delivery schedule 1.Technical specs / ability to manufacture 1600 pts 2.Ability to meet delivery plan 1600 pts 3.Fabrication plan1600 pts 4.Experience1600 pts 5.Quality Control1600 pts 6.Cost2000 pts Total 10,000 pts

 Draft Contracts based on RFP’s [Sent to university legal council and sponsored programs on ]  Purchase orders based on RFP’s were written. [Sent to University Legal council and sponsored programs on / PMT and Fiber respectively.]  Agreement has been reached between Iowa and TTU sponsored programs on how to pay the bills since funding for fiber and PMT’s were equally distributed between Iowa and TTU.

Approval Process Purchasing department final approval University legal council approval University business manager approval Board of Reagents committee (since > $250k) Placed the order on 11/1/01 (Done !)

Purchase Orders 1.Fiber 995km $1.29/m with option of additional 120km at the same price [Jan, Decision time] - Eliminated two Russian performs for production - Blend of Saint-Gobain PLC and Heraeus Core Glass 2.PMT’s R7525HA $202.28/tube with 20% uniformity - Option R7525HACC with 30% $168.56/tube. [problem: about 4 months before initial small quantity can be delivered and R7525HCC was never built or tested with the new proposed method]

Recent Developments - Fibers Meeting at Polymicro on 11/14/01 Several issues were resolved on test procedures. Exception by Polymicro on the attenuation at 300nm was modified. Polymicro will produce First Article fiber [40-50 km] of production fiber. Attenuation values obtained and rejection criteria will be defined. Polymicro produced a detailed report on the QP fiber testing for core materials using two main performs [Heraus and Saint-Gobain] Next meeting in January.

Recent Developments - PMT’s Hamamatsu has agreed to produce 10 bases with divider ratio 4:1:1.5:1:1.2 …… 3:3 2 bases with divider ratio 4:1:1:1 …… 2:2 Hamamatsu has agreed to provide the PMT’s with bar-coding Iowa has purchased bar code reader First 20 PMT’s will arrive late December/early Jan M. Miller has constructed 8-channel, computer- controlled electrometer New Digital scope Tek TDS5104 has been ordered.