SEARAILS 85LT MARINE TERMINAL CONTAINER CRANE CLICK ON IMAGE TO ADVANCE HIT ESC TO END SHOW.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Orientation of Load Cells
Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
BumperBot uses two contact switches to go through a labyrinth. Bumper.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
University of Wisconsin Eau Claire By: Chaizong Lor
Heavy Concrete Construction Formwork
How to Build a Hovercraft October Patrick Wenzell How to Build a Hovercraft A Cobb County Technology-Based Integration School Special Thanks to.
Click on this image to open the full PDF document.
Volvo 270 Outdrive R&R (for bellows replacement)
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
ICRA Panel System Installation Instructions
Goes Great With Work ® Packaging PACKAGING OVERVIEW.
Goes Great With Work ® PACKAGING OVERVIEW. Goes Great With Work ® BOTTOM CAP Casegoods assembled on heavy-duty corrugated skid.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Starboard Side: Looking Forward Notch accessed by removing small Teak pieces A fore/Aft floor support was fit into this notch, which was, of course, one.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Pneumatic Arm Assembly Instructions
All About Flats By Samantha Lee. What is a flat? Theatre flats are large pieces of constructed and painted wood that are placed on the stage to serve.
Both the dome and slab design use a 5 gallon bucket in the middle to be used as a squat hole FINAL MOLD DESIGN.
Applied Control Systems
STEP-BY-STEP LADDER SAFETY By Louisville Ladder Corporation.
Sample Crane Letters in the Northern California Ports Attached are samples of the Crane Letter of Operation, or Flow Sheets for each of the Stevedores.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Institute of Marine and Coastal Sciences Glider Packing Instructions: Page 1 Step 1: Make sure the red stop plug is plugged into the glider and the green.
Senior Design: Validation of Design December 15, 2008.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
TP4-ENERSOL-TD/PV double function
Rotating Base Model Assembly Instructions copyright Mechanical Kits Ltd
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Setting up the Ricoh C305 Press F5 to start the Presentation
General Instructions for “KidWind Light” wind tunnel.
P13458 RIT Senior Design Team May 10, :30AM Dresser- Rand, Painted Post Final Presentation:
Step-by-step assembly instructions
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
SARDAR PATEL INSTITUTE OF TECHNOLOGY, PILUDARA Rakholiya bhavdip : [ ] Gevariya balkrushn : [ ] Patel parth : [ ] ( Branch:
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
Levers & Fluids Rig Step-by-step assembly instructions (c) 2012 Mechanical Kits Ltd.
1 Alwest Seating & Sleeping Accommodations Most Alcan/Alwest boats, at this point in their lives, have undergone some level of interior renovation.
Safety Moment Dropped object
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Custom template diagram
Permanent Joining Nails: come in different shapes and sizes. Nails are much cheaper than screws and quick to put in. You do not need to drill holes in.
Installation Walkthrough Image Guide
OBJECTIVES Discuss parking brake pedals and automatic parking brake release. Explain parking brake linkages. Describe drum parking brakes. Describe caliper-actuated.
Jacking The aviation technician must be familiar with the jacking of aircraft in order to perform maintenance and inspection. Jacking procedure is vary.
Automotive Engines Theory and Servicing
Baby-MIND Modules & Services
Shaper Machine ROLL NO : D14ME09 D14ME12 D14ME30.
Automatic Transmissions and Transaxles
Industrial Skills Fasteners & Hardware.
Step-by-step assembly instructions
High Pressure Water Jetting
PIPE LIFTING KIT HAMMER MULETRAX 2300 C
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
Click anywhere to get started…
Step-by-step assembly instructions
MVB-II Assembly Instructions
Automotive Engines Theory and Servicing
Automotive Technology Principles, Diagnosis, and Service
Presentation transcript:

SEARAILS 85LT MARINE TERMINAL CONTAINER CRANE CLICK ON IMAGE TO ADVANCE HIT ESC TO END SHOW

SEARAILS 85LT MARINE TERMINAL CONTAINER CRANE SEARAILS #31 CRANE - 1:87.5 SCALE (1:100 SURFACE DETAILS) Designed and constructed by J. SHIFF and S. HENSEY Painted by d. tennier Assembled by thor’s hammer BRASS ETCHED DETAILS BY INDIANA MICROETCH ACRYLIC BY TAP PLASTICS LASER PATTERN CUTTING BY INTEGRATED PLASTICS

SEARAILS 85LT MARINE TERMINAL CONTAINER CRANE Original Prototype Design – Port of Oakland, California – mearsk/sealand pier

SEARAILS 85LT MARINE TERMINAL CONTAINER CRANE Packing container as shipped The SEARAILS 85LT Marine Terminal Container Crane HO scale model (1:87.5) is packaged as securely as possible. The packing container, as shipped, weighs 129 pounds. all contact surfaces are protected by sheets of ¼” polypropylene foam. The model is tightly secured horizontally by soft foam inserts on all four sides. It is fixed in the vertical by a wooden plank, placed through and above its “legs”. This “hold-down” plank is bolted to the floor of the container. The bolts are secured to “T-nuts” underneath the floor. This “sandwich” effect keeps the crane model from moving vertically within the container. Additionally, the model’ legs are contained between a set of wood “cleats” screwed and hot-glued to the inside floor. Finally, the scissors stairway on the starboard forward leg is surrounded by cut pieces of tubular foam. All accessories in the included cardboard box are encased in plastic bags and foam protective packing pieces. Please read all instructions Before starting the assembly of the crane

SEARAILS 85LT MARINE TERMINAL CONTAINER CRANE 3. VISUALLY INSPECT FOR DAMAGE WITHOUT REMOVING CRANE. a. EXAMINE BRASS RAILINGS, ladders, and stairways ON AFT MECHANICAL DECK and aft tower TO INSURE THEY ARE IN PLACE AND HAVE REMAINED ATTACHED. b. EXAMINE AND INSURE THE TOWER SUPPORTS ARE FIXED IN PLACE. c. EXAMINE REEVED CABLES TO INSURE THEY ARE IN PLACE AND ATTACHED CORRECTLY. d. EXAMINE FORE AND AFT TOWERS FOR DAMAGE. 3d 3b 3c 3a

SEARAILS 85LT MARINE TERMINAL CONTAINER CRANE WITH THE PIVOT PIN AND CABLES IN PLACE, REMOVE THE SUPPORT BOX AND STAIRWAY “BUMPERS”. THE CRANE MODEL STANDS READY TO RECEIVE OTHER ACCESSSORIES. The order of addition is not significant. The following is one method; 1.Machine shop 2.Industrial crane 3.Control cab and lifter 4.Removal of stairway foam bumpers 5.Rail wheel sets 6.Positioning of crane on layout

SEARAILS 85LT MARINE TERMINAL CONTAINER CRANE Inserting the utility crane The utility crane is used on the prototype to lift additional or replacement parts for the power cable pickup or machine shop. There are two locations available; the aft end on the power cable pickup or forward of the main winch between the prime generators. The complete area is surrounded by etched brass railing. Both positions are prototypical, but the extreme aft end is recommended since it will not interfere with the main tower cables when rotating.

SEARAILS 85LT MARINE TERMINAL CONTAINER CRANE Remove the stairway foam “bumpers” and position the crane model at the desired location on the display. Place the crane towers over the rail tracks, and insure the Maersk logo will reach the far side of the ship’s deck. When moving or transporting the crane within the display area be aware that without gluing the wheelsets to the crane model legs, they will most certainly drop off. Also, the control cab and lifter should be removed before any major movement. All inquiries should be directed to; Searails Box 366 Valley ford, ca