YETS activities at ISOLDE Richard Catherall EN-STI-RBS ISOLDE Technical Coordinator 75th ISCC meeting 2 nd February 2016.

Slides:



Advertisements
Similar presentations
Cyclotron Refurbishing & Development Meeting March 6, 2008.
Advertisements

MEDICIS : status, plans, interlocks and coactivity with ISOLDE ISOLDE ISCC 13 February 2015 Stefano Marzari EN-STI-RBS.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
8 B at ISOLDE Jochen Ballof | ISOLDE GUI Meeting Investigate the structure of 8B, which is expected to be proton halo in ground state, reaction.
CERN ISOLDE / HIE ISOLDE 1 Isolde Target Modulator Prototype development prepared by T. Gharsa TE-ABT-EC CERN.
CERN ISOLDE facility 1 HIE ISOLDE – Workshop 2013 Targets and Front Ends “A new modulator system” Contribution: by T.Fowler, J.Schipper, B.Bleus, T.Gharsa/TE-ABT-EC.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
LIEBE project: WP3 – Construction and tests Project coordination meeting – 30/01/ /01/2015 LIEBE project meeting1 M. Delonca on behalf of the WP3.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
24 January 2001J. Lettry1 ISOLDE Introduction –PSB-beam, Targets –Ion-sources Facility performance –Front-ends and robots –Target production –Safety.
ISOLDE Technical Report & Long Shutdown Works ISCC Meeting 28 th January 2013 Richard Catherall EN-STI.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Status Report of the LISOL Laser Ion Source Yu.Kudryavtsev, T.Cocolios, M.Facina, J.Gentens, M.Huyse, O.Ivanov, D.Pauwels, M.Sawicka, P.Van den Bergh,
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Technical report for ISOLDE INTC 19 May 2007 Mats Lindroos.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
ISCC/INTC 10-11Nov 2015T. Stora on behalf of R. Catherall EN/STI Technical news MENU Technical Issues: HRS coupling table piston - BTY Line water leak.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Status of the Design Study Richard Catherall EN-STI-RBS.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
João Pedro RAMOS ISOLDE Workshop 2015 Radioactive beams at ISOLDE: Status and Developments João Pedro RAMOS (CERN/EPFL) On behalf of the ISOLDE Target.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
ISOLDE Technical Report Richard Catherall EN-STI-RBS ISOLDE Technical Coordinator 52 nd INTC meeting 3 rd February 2016.
HRM28-TCDI Updates October 28 th, 2015 Fausto Lorenzo Maciariello, on behalf of the TCD Team.
HEBT Design Considerations Jingyu Tang, Xiangqi Wang, Hao Hao, Jiajia Tian IHEP, USTC International Review Meeting on Accelerator Physics Design of C-ADS,
ESS Vacuum Standardization
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5AP.Bernardes Thanks to : Richard Catherall/EN-STI, M.Delonca/EN/STI,
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
January 30, 2007 CERN Resonant laser ion sources By V. Fedosseev.
S A Griffiths CM42 June 2015 Electrical & Control.
EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of Task#2 European.
Heating and radiological
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Richard Catherall EN-STI 2nd February 2011
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
AD consolidation activities in LS2
SPS cryogenic proximity equipment and SM18 validation
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
n_TOF “Draft” plans for YETS and LS2
Technical Session CERN ISOLDE – Workshop 2016
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Target and Horn status report
Beam Line Alignment Richard Catherall EN-STI
Alexander Herlert, CERN (PH-SME-IS)
Magdalena Kowalska, CERN PH-SME-IS
Technical report for ISOLDE INTC 19 May 2007
ISOLDE Technical Report & Long Shutdown Works
Teleconference ACS – FREIA 20th February 2018
I Alexander Nass for the JEDI collaboration
Advanced Research Electron Accelerator Laboratory
HL-LHC upgrade at IPHC news
A. Herlert, CERN PH-SME-IS
(Beam) Commissioning Plan
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

YETS activities at ISOLDE Richard Catherall EN-STI-RBS ISOLDE Technical Coordinator 75th ISCC meeting 2 nd February 2016

2 PhD Melanie Delonca The LIEBE target (Liquid Eutectic Lead Bismuth loop target for Eurisol) Test for shower feasibility done: Minimum droplets size is 0.4 mm diameter (diffusion) Design finalized Manufacturing started Modifications at Front-End to be presented next Thursday – ENTM ALARA Full target manufacturing and assembly planned for April 2016 Improve exotic Hg beams by up to factor 10!

1 2 H He LiBeBCNOFNe NaMgAlSiPSClAr KCaScTiVCrMnFeCoNiCuZnGaGeAsSeBrKr RbSrYZrNbMoTcRuRhPdAgCdInSnSbTeIXe CsBaLa..HfTaWReOsIrPtAuHgTlPbBiPoAtRn Carbonyl beams of refractory elements 3 PhD Jochen Ballof Carbonyle compounds V(CO) 6 Cr(CO) 6 Mo(CO) 6 W(CO) 6 Tc 2 (CO) 10 Re 2 (CO) 10 Ru(CO) 5 Os(CO) 5 Co 2 (CO) 8 Rh 2 (CO) 8 Ir 4 (CO) 10 Ni(CO) 4 Principle: Mo CO (g) Neutron converter 3 U Foils, 25 µm Mo Container, Filled with CO 105 Mo production yield: ~ 10 8 ions / uC Proton beam

Modified VADIS Ion source 4 Carbonyl beams of refractory elements Cathode Extended copper cylinder Manometer ~ 200 mbar Classic injection path (hot vadis) Water cooled target base Heating ~ 110 C Mo(CO)6 Calibrated leak PhD Jochen Ballof

Eu scheme development at RILIS with PISA -Integrated PhotoIonization Spectroscopy Apparatus (PISA) -To be used as reference for in-source laser spectroscopy and ionization scheme development -Make use of RILIS set up during shut down -Enables exploratory scheme development at RILIS, prior to test with dedicated ISOLDE target -First candidate: Europium (Eu) -Scan of 2 different dye lasers and new grating TiSa -Many new autoionizing states discovered -Two promising schemes with dye or TiSa identified Autoionizing states in Europium -> most efficient scheme? More tests needed Slide by K. Chrysalidis Eu nm IP 5.7eV 585 nm to 918 nm 2 nd step TiSa 2 nd step dye

Shutdown work outline MEDICIS Target Area ISOLDE Hall Separator areas HT room Many interventions in different areas nearly all requiring the services of RP Avoid co-activities especially in sensitive areas

Mise à jour KK, SM Bat. 179: Planning juin 2015 … mars Portes et Etagères (méc.) 16. Installation blindage chicane 19. Installation MONTRAC mécanique + câblage et mise en service partielle 13. Lisol Magnet: Transport B --> CH et modifications Yury–Vincent Matteo Vincent - Yisel 17. Création SAS ventilation 2 portes Matteo 3. Analyse de Risques et Upgrade réseau secouru et UPS Ana-René 9a. Porte et supply point Vincent 20. Système d’accès MEDICIS mise en service Z6 21. General safety MEDICIS Eva Ana-Paula 25. NEW task: HOT CELL étanchéité, ventilation, contrôle, UPS, réfection sol Ana-Paula / Paul 5. Raccordements et Tests préliminaires robot Medicis 5a. Adaptation points d’échange robots Isolde selon ECR de Matteo Jean-Louis 22. Radioprotection MEDICIS Joachim 18. Mise en service ventilation SAS Alexandre 20a. NEW task: Modification Access Isolde selon ECR de Matteo Eva En cours MEDICIS Interface S. Marzari

Bat. 179: Planning juin 2015 … mars 2016 MEDICIS Interface S. Marzari

MEDICIS Interface in pictures

Target Area Frontends … ALARA L3 intervention Annual Frontend maintenance Modification of target coupling table and its control Change of GPS target coupling piston Faraday cage piston exchange Preparation for LIEBE target tests General maintenance BTY line checks Robot programming checks Ventilation

LIEBE target test preparations Test on-line (GPS) planned for end of 2016 Less risk for ISOLDE operation Preparations need to be done during YETS To benefit from lower dose rates Review in view of operation planned for June 2016 Maybe a second ALARA L3 meeting required Work includes FE modifications Cables through HT transfer tubes FE supports and guide for pump trolley Water connections Shelf position modifications Robot programming

Frontend modifications/revision Change coupling table Relieve forces on ball-bearings Introduce an adjustable end-stop for the same reason Profit to make minor changes for potentiometer and be compatible with LIEBE target

Frontend maintenance/revision Modification of potentiometer Inability to confirm that target is correctly clamped due to too much hysteresis in rotational axis. Micro-switches will also be added for redundancy/verification Rotated return Potentiomètre linéaire

Frontend maintenance/revision Exchange of GPS piston for new design (already done on HRS) Inability to clamp target Confusion with potentiometer feedback has led to unnecessary filling of exhaust gas tanks New design tested 1000 times off-line

Ventilation A lot of work has been done on the ventilation systems over the last year. Acceptance of new and modified ventilation system for Class A labs and MEDICIS Integration of hot cell into new ventilation system (on-going) Monitoring and evaluation of fluctuations in tunnel ventilation Cause related to oversized ducting resulting from the separation of the ventilation system of the tunnel from the Class A labs Ducting modified in January To be tested at start-up.

ISOLDE Hall Upgrade of vacuum controls TE-VSC Verification of beam instrumentation Will be done with beam in cold check out Installation of Fast Tape Station Separator areas Change of vacuum valve HRS section 2 and 3 Laser window exchange HRS + GPS HT Room HT maintenance Preparation for modulator tests

A new modulator circuit has been developed with relatively low power components to provide a robust and accurate charging device capable of re-establishing the 60 kV with improved recovery time. It has been designed especially to sustain the expected increases in beam energy (2GeV) and higher intensity beams for HIE-ISOLDE. Modulator HT pulsing specifications - Recovery times to within +/-1V with a simulated target of ~1ms. To be measured with neutron converter target at ISOLDE facility. -Maximum voltage overshoot < 0.2% Power supply specifications - HT set-point from 10kV to 60 kV with 1V resolution - HT stability +/- 1V (external regulation) - HT warm up delay (drift compensation) < 5 mn Monitored signals - HT recovery time signal acquired and monitored - HT long term stability acquired and monitored - Post-impact loading current acquired and monitored MD at ISOLDE facility The modulator characteristics have been measured in a simulated environment. To confirm our findings we aim to operate our new set-up installed in the HT room running in pulse operation mode with the ISOLDE target loads installed and with proton beam. MD at ISOLDE facility will give the possibility to evaluate the new modulator. A mock-up can be installed in the present modulator tank by replacing the ASTEC power supply this way we can re-use the high precision ROSS divider. New modulator 30kV recovery signal measurement (Heinzinger HVPS 65kV – 40mA) Protons time of arrival Our mock-up installation in ASTEC tank (ISOLDE HT room) Recovery time Test in a simulated environment Test description at ISOLDE facility The worst case scenario concerning ionization is the neutron converter target with the highest possible proton beam intensity (3.3e13ppp). As the target is pre-charged at the moment of the beam impact, there is a risk of flash-over at the Isolde front end. The presence of Medicis target and its faraday cage can have an influence on this risk. This can be evaluated at the same time. A new 60kV modulator for ISOLDE/HIE ISOLDE

Overall Planning

Micro –scheduling Thursday 11:00 – 12: In Outlook, open calendar: Shut-down ISOLDE

Cold Check Out The most efficient way of testing machine operation is to run with stable beam Power convertors, HT, magnet controls, beam diagnostics, collimators … Our goal is to make stable beam 1 month prior to taking protons 1 st March All separator systems should be operational or in test phase Water cooling, controls, power convertors, BI etc In parallel, RILIS will investigate laser ionisation schemes on specific stable beams. NToF will be making samples of 7 Be for their first physics run

Safety Due to an accumulation of varied incidents, ISOLDE is now in the spotlight in terms of safety. Although a draft memorandum dedicated to safety at ISOLDE is still under discussion, we can expect a few obligatory changes in the way we work.

ISOLDE Consolidation There is an on-going request for consolidation for ISOLDE over the next 5-years Presented initially at the Chamonix Workshop, September 2014 Submission of BCR requests to the department head… Following discussions last Friday, the following items have been retained for consolidation Work packageGroup Frontends x2 +1 ReserveEN-STI Tape stationEN-STI VacuumTE-VSC Cameras for target areaEN-STI Off line 2EN-STI Beam diagnostics electronic and mechanicsBE-BI RILIS laser power suppliesEN-STI 60kV modulatorTE-ABT Magnets (separators and REX triplet spares)TE-MSC

ISOLDE Lines - Survey Results Isolde Lines Survey Results – meeting Measurements of November/December 2012

RESULTS – vertical plane Isolde Lines Survey Results – meeting Zavg = m Dev: -1.8mm to +1.1mm Zavg = m Dev: -1.5mm to +1.5mm ~ 10mm step

RESULTS – vertical plane Isolde Lines Survey Results – meeting

RESULTS – horizontal plane main line CA0 – CD0 Isolde Lines Survey Results – meeting NameX [m]Y [m] Distance to line [mm] CA0_Q_E CA0_Q_S CB0_Q1_E CB0_Q1_S CB0_Q2_E CB0_Q2_S CC0_Q1_E CC0_Q1_S CC0_Q2_E CC0_Q2_S CD0_Q1_E CD0_Q1_S Line: CA0-CB0-CC0-CD0Bearing [g]: Deviation scale 500:1 Relatively to the scale along the beam

RESULTS – horizontal plane bearings comparison Line Theoretical Bearing Calculated Bearing Difference Calc-Theo [g] [cc] CA0-CB0-CC0-CD LA LA LA0-LA LC RA RB RC0-RC2-RC RC RC cc Theoreticl Bearing Calculated Bearing +315cc -244cc -116cc +83cc -202cc LC0 10cc ~ 0.16 mm/10m