Weekly Review of Operation Recycler departmental meeting November 14 th, 2007.

Slides:



Advertisements
Similar presentations
Results of shooting without a “hot bucket” A.Shemyakin MI departmental meeting March 31, 2009.
Advertisements

Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Storage Rings Group Meeting Steve Werkema 24 March 2010.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Electron cooling at the Recycler: Update and Cooling force characterization October 19 th, 2006 L. Prost, Recycler Dpt. personnel Fermi National Accelerator.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
Beam-based vacuum observations and their consequences Sergei Nagaitsev August 18, 2003.
RR Barrier bkt Chandra, Bob and Ming-Jen MI  RR Injection Phase and Energy Mismatch: Measurements using W24 Chandra Bhat, Bob West & Ming-Jen MI Group.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
Evolution of beam energy distribution as a diagnostics tool Alexey Burov, Bill Ng and Sergei Nagaitsev November 13, 2003.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Progress of Electron Cooling at the Recycler January 26 th, 2006 L. Prost, Recycler Dpt. personnel f Fermi National Accelerator Laboratory.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
RECYCLER REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
1 Instabilities and Phase Space Tomography in RR Alexey Burov RR Talk May
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Recycler Operations and Studies July 23-30,2008 Meiqin Xiao.
Recycler Pbar Transfer -Gattuso 1 Recycler weekly Summary This presentation will probably involve audience discussion, which will create action items.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
Cons Gattuso 2/23/10 Status/Changes to Pbar Transfer Program.
Recycler Operation and studies Week Nov. 10- Nov Meiqin Xiao.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
SDA- Shot Data Analysis Jean Slaughter DOE Review July 21, 2003.
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Space charge studies at the SPS
Electron Cooling Simulation For JLEIC
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Longitudinal beam parameters and stability
Wire, flat beams and beam-beam MDs in 2017
TMCI Observations in AD
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary of Week 16 G. Arduini, J. Wenninger
Beam dynamics requirements after LS2
Another Immortal Fill….
JLEIC Ion Integration Goals
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

Weekly Review of Operation Recycler departmental meeting November 14 th, 2007

2 Pbar Monthly Totals Perhaps an overestimate

3 Status Summary – Transfers from Accumulator  Pbars to the Recycler  10 Shot setups 657E10 Pbars received from the Accumulator (in RR) –Measured in MI (to compare with pre-shutdown analysis) : 712e10 (i.e. only 92% efficient) »Better than last week »Before the shutdown, we were assuming 95% efficiencies ! »Average efficiencies Historical Last weekThis week –ACC to MI 95% 94% 97% –MI to RR 95% 92% 92% –‘Beg to End’ 90% 87% 90% »‘Storage’ 85% 89% 89% (in/out measured in MI) Downward trend throughout the week though ! One very much sub-par transfer (w/o bunch loss)

4 Storage efficiency and mining Mostly because of the one bad transfer

5 Status Summary – Shots to TeV  Pbars to the Tev  4 shot setups: 500E10 transferred (measured in MI) 125e10 Average Intensity per shot (down from last week)  All were partial mining stores  Average emittances Last week This week –Trans. Schottky (in RR)* –Trans. FW (in RR) * [  mm mrad] –Longitudinal (in RR) * –Long. (bunch in MI) [eV s] Average mining efficiency : 99% 64% * Before mining

6 Operational Highlights/Machine Maintenance  Worked on consistent procedure for partial mining  Simplified (and improved) Excel spreadsheet used to calculate the appropriate bucket height  Hopefully, we are only a few stores away from normal operation  Adjusted RF correction timing after RF reboot  Upgrade in the works to avoid this manipulation in the future  The ‘flatness’ of the bunch is not as good as before the shutdown Should we consider reducing the maximum RF voltage to gain more head room for the feed forward system ?  Horizontal Schottky calibration with scraper  No evidence of coupling This is different from the vertical scrape done a few weeks ago to calibrate the vertical Schottky detector (!?)  The change to the calibration was +6.5%  Changed $2D mini-dip by -3 MeV  Seems to help with injections

7 Operational Highlights/Machine Maintenance (cont’)  Timed in new dampers  Has been in for almost a week (connected to inputs only, not the kickers) Ready for operation (implementation next week probably)  HV oscillations on the Pelletron went away by themselves (since Friday evening) !?  Prepared specific diagnostics to be installed inside the tank when we get a chance to access  Separation box (to replace faulty one at the 1 MV level) has been tested and is ready for installation  Loss monitors tripped the electron beam (sometimes) during multi-batch slip-stacking studies  Intensity (and protons losses) will only go up with time This will be the standard event soon  Need to look at this new loss pattern and devise a plan to mitigate the impact of these losses on the electron beam operation

8 Issues - Recycler  One un-explained emittance blow up event  Ops cooled the stash deeper than typically…  … however, the phase density was only 2.3 (Schottky) Our current stability limit is supposed to be higher (see later slide)

9 SDA transverse emittances reporting issue  Emittance measurements in SDA are reported from R:EMHANM and R:EMVANM  These devices do not report the correct emittances when stochastic cooling in on Was always true but it is worst now with the 1-2 GHz vertical system  Question: How should we report emittances in SDA now ?  R110 emittances (or slow emittances i.e. R:EMITHA and E:EMITVA) may be adequate for shot to TeV although we can not guarantee the timing In particular if R110 measurement frequency is set to 12 minutes ! On the other hand, pin switches are supposed to be open during shots –But not before mining, which is the emittance reported in the summary table  R110 emittances are not adequate for transfers from the Accumulator Emittances were reported after each injection Vaia has been informed that we no longer need/want these devices reported in SDA

10 Studies highlights  Recycler  ‘Old’ dampers stability limit in a single bunch Found to be ~2.7 (Schottky) or ~4.2 (FW) for the phase density No beam loss  Effect of state 11 (i.e. anti-bucket formation and 2.5 MHz buckets manipulation during injection) on the longitudinal profile of the stored beam Repeated twice No visible effect (in particular, no shoulder/wing formation)  Ecool  Drag rate w/ high number of pbars Failed to achieve the adequate equilibrium (namely, ~2  mm mrad transversely, while maintaining a small momentum width)

11 Plan/Upcoming studies  Near term  Test stability limit of the new dampers (Martin, Sasha)  Measure longitudinal distribution of the injected beam (Martin, Chandra) May be revisited  Drag rate measurement with ‘large’ number of pbars (Sasha, Lionel) Need to add transverse noise to achieve adequate emittances  Optics measurement with electron beam (Mary) Need one more set (may be tomorrow)  ‘Old’ items not marked as completed in studies list  Rapid pbar transfer scheme (Chandra)  Electron cooling in linear bucket (Lionel, Sasha)  Recycler impedance measurement (Martin)

12 From Stan’s startup list  Calibrate/check RF voltage with synchrotron frequency measurement (Martin, Chandra)  Adjust compensation loop for new $20 ramp (Stan)  Document chromaticity (Stan)  Needs protons  Run pbars in boomerang mode (Stan, Martin, Stan)  Document beam motion with tune changes and correct/reduce if necessary (Meiqin, Stan)  Started yesterday evening  Lattice studies at operating tunes and ‘low’ tunes (Meiqin)  What ‘low’ tunes means remain to be determined

13 Long(er) term studies list  In proton mode  Characterize Recycler abort (Dave Johnson) For Nova project