Manufactured Construction Alberta Infrastructure’s Perspective on Current Trends Canadian Center for Healthcare Facilities.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

ED Disaster Preparedness: Tertiary Medical Center Perspective Alisa Murchek, RN, MS, CEN Associate Director of Nursing, Critical Care and Emergency Services.
Lightweight Forming System and Roofs for Concrete Floors.
2008 Johns Hopkins Bloomberg School of Public Health Setting Up a Smoking Cessation Clinic Sophia Chan PhD, MPH, RN, RSCN Department of Nursing Studies.
From RTLS pilots to Enterprise-Wide Implementation: Some Lessons Learned.
HOUSING IS HEALTH CARE MARGARET FLANAGAN, LGSW DISABILITY AND CASE MANAGEMENT COORDINATOR Health Care for the Homeless (HCH)
The Greening of North Carolina Network NCSU IES: GNCN:
A more efficient you. Introducing EmployerAccess Anthem’s easy-to-use online benefits management system Anthem Blue Cross is the trade name of Blue Cross.
Sudan Community Development Fund: Preliminary Slice I Impact Evaluation Results and Needs for Future Evaluations Abdulgadir Turkawi, Krishna Pidatala,
Tel : Fax: P.O.Box : Dubai, UAE.
Copyright © All Rights Reserved. Carpédia International Ltd. Performance Excellence Approach Blake McDonell Sr, Director, Operations
Integrated Practice Management Systems. Learning Objectives After reading this chapter the reader should be able to: Document the workflow in a medical.
1 Reducing Waste and Improving Health Care Processes Through the Application of Lean Sheri Eisert, PhD Associate Professor University of Colorado Health.
Copyright © 2011, 2007, 2004 by Saunders, an imprint of Elsevier Inc. All rights reserved. 1 Medical Practice Marketing and Customer Service Chapter 26.
NORMA GOMEZ, MBA, MSN, RN, CNN Unique Challenges for the Nephrology Professional in Managing Change.
The Board of Governors of Exhibition Place June 2008 ENERGY ACTION PLAN.
Efforts to Sustain Asthma Home Visiting Interventions in Massachusetts Jean Zotter, JD Director, Office of Integrated Policy, Planning and Management and.
SW-PBS District Administration Team Orientation
Offered by Dave Scott & Associates, Inc.. TrendWall ® Interior Landscape Solutions TrendWall Flexible Fast Sustainable Economical.
INTRUSION ALARM TECHNOLOGY
1 Steam to Hot Water Conversion The University of British Columbia Paul Holt Director, Generation & Distribution.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Greater Lexington Park Health Enterprise Zone (HEZ) Project.
INTERIOR DESIGN BY DIANA LA. INTERIOR DESIGN ACTIVITIES Search for and bid on new projects Determine the client’s goals and requirements of the project.
Together.Today.Tomorrow. The BLUES Project Karen C. Fox, PhD Chief Executive Officer.
EVIDENCE-BASED DESIGN APPROACH IN A STUDIO BASED LEARNING ENVIRONMENT FOR GUIDING CONSTRUCTION OF KNOWLEDGE.
The Rural Medical Transportation Network A Project of the SIU Center for Rural Health & Social Service Development MedTrans: Healthier Patients and Happier.
1 Towards A Low Carbon Era Ms Anissa Wong, JP Permanent Secretary for the Environment The British Chamber of Commerce in Hong Kong Construction Industry.
CH 2 – Heat Rej. + Evap. Cooling Towards sustainable buildings…
Adoption and Use of Electronic Medical Records (in Federally Qualified Health Centers) and Supporting an ASP Community Care Network of Virginia, Inc.
The Alberta Physician Assistant Demonstration Project N.E Gibson MSc, MD FACP, FRCPC Medical Lead AHS PA Demonstration Project.
Facility supervision by the District Health Teams (DHTs) in Rwanda Track1 Meeting Maputo, Mozambique, August 10 th -12 th Dr. Ruben Sahabo.
Facilities for a Quality Child Development Program Child Services II.
VP Quarterly Report on Strategies Q3– February 2, 2016 Robbie Peters, Vice President, Financial Services & Chief Financial Officer Vision: Healthy people,
HTA Efficient Study Designs Peter Davidson Head of HTA at NETSCC.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Copyright © 2007 by Saunders, Inc., an imprint of Elsevier Inc. Medical Practice Marketing and Customer Service Chapter 25.
Estimating and Scheduling CEE 492
Care Coordination Collaborative Change Package Visual February 21, 2014.
Behavioral Health – Primary Care Integration. Odyssey House Overview Established in 1971 Integrated System of Care Substance Use Disorder Treatment Psychiatric.
POWERLINC A flexible, reconfigurable power distribution system designed specifically for control rooms. 1.
Case Costing at TBRHSC June 2015.
Permanent Supportive Housing: When It Is Time to Move On?
Digital Healthcare design studio arc 509 park / franqui - week 4
IT Solutions – Improving Timely Access to Health Care
The Design Team Carl James.
Foundations of Technology Construction
Oliver Chinganya African Centre for Statistics 27 September 2017
A more efficient you. Introducing EmployerAccess
WALLCLADDING SHEETING_
The NxtWall Advantage.
Report Prepared by: Sustainability Foresight
2017 DifferenceMaker $6K Idea Challenge
Developing Clinic Based Case Management & Care Coordination
Is part of The ENGIE Group
Kincaid Hall Renovation
The Ontario Experience National Immunization Conference
Integrated Bilateral Agreement (IBA) 2018 to 2028
Health Advocate Overview
The Asset Management Journey for Building Assets
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
British Columbia At approximately 950,000 square kilemetres, BC is Canada’s 3rd largest province. It is bordered by Alaska to the Northwest, the Yukon.
Carleton College Facilities Management
Foundations of Technology Construction
Optum’s Role in Mycare Ohio
Minuteman Vocational Technical Regional High School Progress
PreManage Pilot One way to address ED utilization:
MAKING QAPI PAINLESS It doesn’t have to hurt!! Joan Balducci, RN, BS
Alysia Bernicki – Case Coordinator Kayla Vick – Residential Supervisor
Zero Suicide Implementation in St Joseph’s Health Care London Dr
Presentation transcript:

Manufactured Construction Alberta Infrastructure’s Perspective on Current Trends Canadian Center for Healthcare Facilities

Health Facilities Branch introduces Manufactured Walls to an Edmonton Health project  Alberta Infrastructure delivers Health Facility Projects over $5 million for Alberta Health Services / Alberta Health  Northern Alberta Urology Center is a fit-out of a vacant floor in the existing Kaye Edmonton Clinic.  NAUC will provide state of the art urology care in an academic environment and will establish a single point of entry allowing for an integrated approach to assessment, diagnosis, education, treatment, follow-up, and support for urology services. 2

Drivers of Change Alberta Infrastructure’s new DESIGN PRINCIPALS for PUBLICLY FUNDED INFRASTRUCTURE Functionality Sustainability Flexibility & Adaptability Affordability & Form 3

Drivers of Change Government of Alberta’s Climate Leadership Plan Infrastructure funding will target outcomes that focus on measurable reductions in greenhouse gas emission. Program Design is currently being developed with the ministries of Infrastructure, Transportation and Municipal Affairs. 4

Drivers of Change Northern Alberta Urology Centre had an aggressive schedule to retain donor funding. Alberta was experiencing limited trade coverage for drywall tenders. 5

Choosing NAUC to pilot Manufactured Construction Half of the project space had repeated room designs such physicians office, clinical staff work rooms and exam rooms. The Kaye Edmonton Clinic is designed for clinic spaces. The project chose to have the walls constructed with conduit, but not wired by manufacturer to insure CSA Z32 requirements were met. 6

Project Implementation – Client Acceptance Infrastructure had to get the client to understand new technology: Perception of limitations based on standard office cubicle products. Infection Prevention and Control benefits during construction. Ability to adapt to changing needs over the lifetime of a facility. Maintenance benefits especially due to flood incidents. 7

Project Implementation - Design Glazing features were readily added to increase borrowed light in the clinic. 8

Project Implementation - Design Designer quickly utilized DIRTT functionality in design Glazing features were readily added to increase borrowed light in the clinic. 9

Project Implementation - Design 10

Project Implementation - Design 11

Project Implementation - Design 12

Project Implementation - Design 13

Project Implementation - Design 14

Project Implementation - Design 15

Project Implementation - Design 16

Project Implementation - Design 17

Project Implementation - Construction MEP + Ceiling in, base building painted, flooring down. 18

Project Implementation - Construction Pre-Engineered walls arrive on site 19

Project Implementation - Construction All the Flooring was down and the placement for each panel was labeled. 20

Project Implementation - Construction Wide open environment for the trades to work in 21

Project Implementation - Construction Walls on site, ready for tilt up construction. 22

Project Implementation - Construction Clean construction for the interior 23

Project Implementation - Construction Clean construction for the interior 24

Project Implementation - Construction Level II Electrical in the walls 25

Project Implementation - Construction First day of installation 26

Project Implementation - Construction All walls were up within 48 hours. 27

Next Steps – Finish the Project 28

Next Steps – Finish the Project 29

Other Benefits founds to date Easy to add Graphic feature walls 30

Other Benefits founds to date Easy to add Graphic feature walls 31

Graphics were utilized on another project Stollery Pediatric Ambulatory Clinic Utilized system to get a feature wall finished within schedule and budget. 32

Lessons Learned to date Can’t back this in – need to be at SD and everyone needs to be supportive of IPD and a new construction methodology. –Shop drawing review process was intensive for designer and project teams. –Review still did not catch all instances of utilities being run through glazing. –Coordination issues that are normally addressed on site during typical steel stud construction were not discovered until connections were attempted. 33

Lessons learned to date - Continued Installers were not prepared for construction in an active healthcare facility. Still need to address user perception of quality prior to seeing installation. –Users are concerned that floor wax will not be under walls. 34