Tests on production cryomodules Bob Kephart Sept 30, 2006.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
D.Proch, Thin film Workshop, Legnaro, Oct SC RF cavity technology: the possibility of mass scale production, a global review Remarkable production.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
5Feb07 Beijing GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
F February 27, 2006 Fermilab Budget Briefing 1 Fermilab Budget Overview International Linear Collider FY05 - FY08 Bob Kephart February 27, 2006.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
1 ILC Internal Cost Review Major Points from External Reviewers T. Elioff, J. Marx, V. Soergel, M. Yoshioka, and A. Yamamoto, (C. Wyss, absent) To be presented.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Road map of the workshop Machine availability: – “work-horse” in the injection chain – 100% availability not viable,.What is achievable? And at which cost?
October 23, 2007 GDE EDR Meeting 1 EDR Strategy and Timeline Cavities and Cryomodules Rich Stanek October 23, 2007.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
Rolf Lange DESY ILC Workshop 1-June-07 XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Module Industrialisation for XFEL How to proceed.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
Date Event Global Design Effort 1 Cryomodule Technical System Review N. Ohuchi, H. Carter, C.Pagani.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.
ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )
MICE Coupling Coil Test Proposal Ruben Carcagno Fermilab July 9, MICE CC Test Proposal7/11/2011.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
S2 Progress Report for EC H. Padamsee and Tom Himel For the S2 Task Force.
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Rev 0.3: Aug 7, Notes from TRISTAN Experiences N.Toge (KEK) for GDE RDB S2 Rev.0.3 Aug. 7, 2006.
The Evolving ILC Project
WP5 Elliptical cavities
Roadmap for triplet cryostats
Crab Cavities Contribution from the U.S.
Testing of SC Magnets Status - November 2010
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Project X: Cryogenic Segmentation Issues
S1-G cryomodule assembly status
Notes on Ramp-Up and Production
High Gradient Cavities: Cost and Operational Considerations
Industrialization of previous projects
UK RFD Pre-Series cryomodule
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
Nick Walker (DESY) EU GDE Meeting Oxford
SPOKE Cavities frequency preparation plan and RF control procedures
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Tests on production cryomodules Bob Kephart Sept 30, 2006

R. Kephart LCFOA Oct 06 2 Introduction The ILC cryomodule will evolve through several versions between now and the series production used to construct the machine The homework was: –investigate what tests are needed on the final production of industrial cryomodules –and what special tests are needed when the cryomodule design gets modified to make it cheaper to manufacture. –These tests may or may not be system tests our task force is responsible for planning.

R. Kephart LCFOA Oct 06 3 Types of changes Assuming we are starting with “working” prototype one can consider the types of changes that might occur Types of changes –Changes aimed at performance improvement –Changes driven by cost reduction Reduce labor Reduce M&S costs –Changes due to region of manufacture Availability of materials ( e.g. manufacturing standards) Regional vendors ( e.g. ceramic feed throughs)

R. Kephart LCFOA Oct 06 4 Performance Improvement Changes aimed at performance improvement –Typically these occur until the project management of an “approved” project “freezes” the specification –The number of objects tested is small –The tests are extensive but focused on performance validation –Performance validation leads then to industrial production and cost reduction This is ~ where XFEL is now –TTF is the test bed ILC is not yet to this point…

R. Kephart LCFOA Oct 06 5 Performance Improvement ILC will be pushing performance for at least several years –Currently several cavity and cryomodule variants –Seems unlikely that we could adopt an untested design variant ( e.g. cavity shape, HOM change, quad location, etc.) without both cryomodule test stand AND beam tests –At least one test facility needs beam, to validate cryomodule performance improvements –This will involve swapping modules in and out… probably not consistent with use of TTF as a user facility.

R. Kephart LCFOA Oct 06 6 Cost Reduction Changes driven by Cost Reduction –Typically these occur until the project management of an “approved” project “freezes” the design for series production –The number of objects tested is still small –The tests are less extensive, more comparative vs previous successful prototype –Many improvements to cryostat, mounts, seals, feedthrus, assembly procedures can be validated on a CM test stand without beam –Intertwined with industrial production which will produce regional differences in the cryomodule

R. Kephart LCFOA Oct 06 7 Regional manufacture When CM design is “final” the project can call for international tenders. This will lead to vendor selections and “preseries” production It will be very difficult ( but not impossible) to build identical cryomodules in all 3 regions –Manufacturing capabilities of vendors ( e.g. machine tools, weld technique, experience) –Materials availability ( standard thickness mill runs vs special order = cost, delay) –Regional availability of “specialty items… eg. Feed throughs, couplers, seals, sensors, etc.

R. Kephart LCFOA Oct 06 8 Regional manufacture Likely that we will end up with 3 different but plug compatible cryomodules Each preseries unit will require extensive testing to validate its performance and reliability prior to and during mass production of series units The number of units tested should be as large as possible (determines MTBF region that can be explored) Tests should be as realistic as possible

R. Kephart LCFOA Oct 06 9 Tests vs specific changes

R. Kephart LCFOA Oct How did other projects get burned ? Tevatron –Scrapped the first 10% of dipoles. ( constr. before complete design) – Discovered two later failures lead flexing during ramped operation cold mass sag  changing skew quad… during collider run SSC –costed and launched before they had a viable magnet design –Original magnet aperture too small –Quench protection OK for single magnet, not in string – contributed to cost escalation & ultimate project cancellation LHC magnets –LHC cost estimate based on early vendor estimates –Extensive test facility  performance seems not to be an issue –Vendor bids for series production were much larger than expected –CERN assumed part of work and much of the technical risk –Cost growth and delay (ie must validate cost for actual device built) –Transfer line… small untested vendor changes  big delays SNS –TJNL rushed delivery of modules to meet schedule –vacuum leaks during cooldown –unexpected HOM problems  rework

R. Kephart LCFOA Oct LHC String test History LHC String test was designed in 1991, in operation since It has tested several versions of the the LHC magnets and operated for 12 years.

R. Kephart LCFOA Oct Picture of LHC string test

R. Kephart LCFOA Oct Conclusions A range of Test facilities are required to validate likely changes aimed at performance improvements, cost reduction, and due to regional differences Tests should be as complete and extensive as affordable with designs frozen as soon as adequate performance is achieved These validations must take place before series production or the project faces large risks In the case of LHC ( and XFEL) the test facility is a long term investment that continues to operate well into the series production of components. Seems likely that ILC will require test facilities of similar scale.