Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach :

Slides:



Advertisements
Similar presentations
Track quality - impact on hardware of different strategies Paola FTK meeting Performances on WH and Bs   2.Now we use all the layers.
Advertisements

UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
FTK poster F. Crescioli Alberto Annovi
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration (
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
OUTLINE TODAY (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings.
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
ATLAS Trigger Development
1 FTK AUX Design Review Functionality & Specifications M. Shochet November 11, 2014AUX design review.
FP7-People-IAPP-2012 FTK - Project number: Paola Giannetti – INFN & University of Pisa 1 st EU Mid-Term Review meeting Brussels, November 7 th,
OUTLINE (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings (scientific.
Software for tests: AMB and LAMB configuration - Available tools FTK Workshop – Pisa 13/03/2013 Daniel Magalotti University of Modena and Reggio Emilia.
Project number: Andreas Sakellariou – PRISMA ELECTRONICS 1 st EU Mid-Term Review meeting 7 November 2014.
Management: (1) Next GA, EB and trainings (2) Summary 2013 – Planning 2014 (3) AUTH recruitment.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be.
Calliope-Louisa Sotiropoulou C OGNITIVE I MAGING U SING FTK H ARDWARE M EETING ON M EDICAL I MAGING.
IAPP-FTK Status Report b e b b   e   hb b  1.5 MEuros 4 Years 6 Institutions.
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
Calliope-Louisa Sotiropoulou FTK: E RROR D ETECTION AND M ONITORING Aristotle University of Thessaloniki FTK WORKSHOP, ALEXANDROUPOLI: 10/03/2014.
IAPP - FTK workshop – Pisa march, 2013 Marco Piendibene – University of Pisa & INFN FTK and the AM system.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
The Monitoring Problem Firmware for the Lost Synchronization Detection Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name:
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Status of FTK Paola Giannetti INFN Pisa for the FTK Group ATLAS Italia November 17, 2009.
Costo ~ 600 kE ATLAS: Frascati, Milano, Pavia, Pisa CMS: Firenze, Padova, Perugia, Pisa, Trieste Applicazioni: FTK Phase II, L1 Track Trigger, outside.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
New AMchip features Alberto Annovi INFN Frascati.
The AMchip on the AMBoard Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
14.4. Readout systems for innovative calorimeters
Outline The Pattern Matching and the Associative Memory (AM)
Firmware development for the AM Board
The Associative Memory Chip
IAPP - FTK workshop – Pisa march, 2013
FTK: update on progress, problems, need
Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa
The Associative Memory – AM = Bingo
FTK Update Approved by TDAQ in april
More technical description:
LAMB: Hardware & Firmware
FTK infrastructure in USA15 Status and plans for 2015 A
Project definition and organization milestones & work-plan
Possible contribution of Pisa on pixel electronics R&D
Summary of Deliverables & reached Milestones
Wrap up Licia Florio AARC Coordinator
Calliope-Louisa Sotiropoulou on behalf of the IMPART Project
Design of the 64-channel ASIC: status
AM system Status & Racks/crates issues
An online silicon detector tracker for the ATLAS upgrade
* Initialization (power-up, run)
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
SEEDS Kick-off meeting May 6, Lausanne Bojana Tasic Renate Kunz
Pending technical issues and plans to address and solve
WP8 – Improvement and equipment of irradiation beam lines
StratusLab Project Status
T1 Electronic status Conclusions Electronics Cards:
Secondments & tasks Management meetings – Calendar
Early Stage Researcher: Panos Neroutsos
CMS RPC Endcap RE1 Status Report
A WRM-based Application
TMB, RAT, and ALCT Status Report
A Fast Hardware Tracker for the ATLAS Trigger System
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
KICK OFF meeting - project presentation
Pierluigi Paolucci & Giovanni Polese
PCS Technical Board 27th February 2018, Vienna.
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach : what’s done & to be Done

List of Work Packages & WP leaders 1) Prototype Construction & Production Validation (PRIELE, M1-M42) 2) Infrastructure & Integration (CAEN, M1-M48) 3) Commissioning (CERN, M12-M48) 4) Architecture Simulation (UniPisa, M1-M48) 5) Image Processing (UniPisa, M25-M48) 6) Silicon Detectors (CNRS,M1-M48) 7) Outreach (AUTH, M1-M48) 8) Workshops & Trainings (AUTH, M1-M48)

History: past, present, near future Demonstrator: AMBFTK, LAMBFTK and AMCHIP04 (14 mm 2 ); produced and tested It works but the AMchip package is unsuitable for large chips (>1 cm 2 ) → new package, new IP core, new serialized I/O → New AMBSLP → New LAMBSLP in two versions: 1. Mini_LAMBSLP for Miniasic Amchip to test the IP core 2. LAMBSLP for final BGA package for AMchip05 and 06. BGA 23x23 (new) PQ208 (old)

Milestone Name WP Delivery Comments IDLeader date M.4.1 Demo general simulation ok UniPisa M6 (July) Demonstrator: simulated architecture ok basic AMBFTK simulation ok M.1.1 Slp2 prototype ok at Priele PRIELE M12 (Jan) SLP2 prototype validated at PRIELE Ongoing work – boards available (Saverio-Pierluigi) M.1.2 Prototypes: Atlas review PRIELE M12 Atlas evaluation of FTK prototypes M.2.1 Demonstrator ok at Caen CAEN M12 Demonstrator must run flawlessly at Caen Integration with AUX card (Marco – Takashi) Status of Deadlines - Milestones in 2013 AMBoard (a) SSB: Final Fit-HW DF Proto AUX Milestones do not need separate documents – they will be mentioned in the periodic report

OUTREACH MILESTONES M.7.1 – M.7.3Open Days results verificationAUTH M8, M20,M32 M.7.4 – M.7.6Workshop days results verification AUTH M6, M18,M30 JULY M.7.7 – M.7.9Summer schools results AUTH M7, M19,M31 Summer School: VHDL language and ISE Xilinx CAD July 1 – Workshop DAY: July ? IAPP Open day: inside the Department “congressino” FTK communicates to students April

N.Title Nature /Dissemination Date D.2.1 (CAEN) VS infrastructure at CAEN for FTK demonstrator (Kostas-Daniel) R/RE M6 D.4.1 (UNIPI) FTK Demonstrator detailed simulation (Marco-Simone-Daniel) R/RE M9 D.4.2 (UNIPI) Test Vectors for the FTK demonstrator (Marco-Simone-Daniel) R/RE M10 D.2.2 FTK demonstrator fully integrated with old power supply (Saverio) Pub/PU M12 D.1.1 SLP2 prototype constructed at PRIELE (Daniel) Pub/PU M12 D.6.1 (LPNHE) Test bench at CAEN (Calderini) R/RE M12 D.7.1 IAPP project open days (Paola)R/PU M7, M19, M31, M43 D.7.2 Workshop days (Paola)R/PU M5, M17, M29, M41 D.7.3 Summer school weeks (Paola)R/PU M6, M18, M30, M42 D.7.4 & D.8.3 World wide web site for dissemination - status (Kostas)R/PU M6, M18, M30, M48 D.8.1. FTK Workshops (Paola)R/RE M1, M13, M30, M46 D.8.2. Trainings (Paola, CAEN) (AUTH is next)R/RE M1, M5, M9, M19, M29, M47 Move next training (M9) to march: ASSOCIATE TO THE NEXT WORKSHOP AT PRISMA DELIVERABLE SUMMARY Reports after secondments are inputs to Deliverables Deliverables are documents written by the WP leader

OUTREACH SCHEDULE Here you can find a description of the 2nd Workshop on Modern Circuits and Systems Technologies It will be associated with the AUTH IAPP training Immediately before or after we will have the FTK Workshop at Alexandroupoulis  travel to Greece!

Aree di lavoro presente-futuro WP1: Prisma  produzione, tests schede (Marco+?) WP2: CAEN integrazione  clustering (Calliope), AMSLP2, SLP1 (Christos), infrastrutture WP3: commissioning  a partire dall’anno prossimo WP4: simulazione, studi triggers  arriva Guido

New Ideas for the future - FTK could become smaller and smaller Multi-packaging FPGA & Amchip – mini FTK 9 (1)We have a very interesting quotation for FPGA bare dies to be packaged with AMchips (2)IMEC support for feasibility studies (3)FTK SIP (System In Package) becomes a real possibility – large impact on AM bank sizes Pattern matching & track fitting (TF) sqweezed in a SIP (BGA 23x23) TF highly parallelized

FTK miniaturization for long latency applications Few future LAMBs could cover the whole detector if used for long latency applications (simulation-offline) 10 FTK What about this size ? Goal : build a Lamb that can fit in a PC or can be accessed by a PC. FP7 IAPP - STREP PROGRAM Coordinated by University of Pisa and INFN-Pisa

SLP1 – occasione con Thales 3 anni di Ph.D. pagati Marie Curie, da spendere al 50% a Parigi presso la ditta. Multi-packaging del nostro SIP.

Nuova distribuzione di comandi/assunzioni Guido V. Rob. B. ???

ANNO III e IV

CONCLUSIONS TIME IS RUNNING FAST trying to keep the pace ‘:-P A LOT OF REPORTS TO PREPARE OUTREACH AND TRAININGS high rate trigger :-D WE HAVE AT HANDS THE EXPECTED RESULTS!