Energy efficiency considerations in cryogenics Philipp Arnold Section Leader Cryogenics www.europeanspallationsource.se Proton Driver Efficiency Workshop.

Slides:



Advertisements
Similar presentations
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Advertisements

ESS Cryogenic System Design
ITER Cryoplant System Status
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
CRYOGENICS FOR MLC Cryogenic Cooldown Scheme Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
N.Delruelle (CERN)31-May-2007 Cryogenics for ATLAS and CMS Experimets N. Delruelle on behalf of AT-ECR group.
The ESS Cryogenics System J. G. Weisend II, P. Arnold, J Fydrych, W. Hees, J. Jurns, A. Lundmark, X. T. Su, X.L. Wang June 2015.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
Superconducting Electronics and Detectors Workshop “Jefferson Lab Cryogenic Operation” Mathew C. Wright December 1,
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
N.Delruelle, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Design choices.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
The ESS Cryogenics System J. G. Weisend II, P. Arnold, J Fydrych, W. Hees, J. Jurns, A. Lundmark, X. T. Su, X.L. Wang February 2016.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic refrigeration for the XFEL facility. Current status of the commissioning. Wilhelm Hanspeter Grenoble, June 4th, 2015.
Design of cold compressor systems. Operational and economical aspects. Decker L. Tucson, June 29, 2015.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Jonathan Creel Electrical / Cryogenics Engineer Cryogenics.
L Design and Optimization of Helium Liquefaction System with Targeted Capacity of 50 lph without LN2 T Maiti, S Pal, A Mukherjee, U Panda Variable Energy.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Overview of the ESS Linac Cryogenic Distribution System
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
2K Cold Box FDR Introduction
Process Simulation for the LCLS-II Cryogenic Systems
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
FRIB Cryogenic Support
Innovative He cycle Francois Millet.
Cryoplant Installation Scope
N. Hasan1, P. Knudsen2 and V. Ganni2
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
CRYOGENICS OPERATIONS 2008 Organized by CERN
ESS Target Cryogenic System European Cryogenic Days CERN
Mathew C. Wright October 2016
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
Mathew C. Wright January 26, 2009
ILC Experimental Hall Cryogenics An Overview
Cryogenic System Commissioning Summary Report
Overarching Commissioning Plan
SNS Cryoplant Commissioning Past Experiences
Cryomodules Challenges for PERLE
ESR2 Process Cycle Design
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
ESR2 Process Cycle Design
Presentation transcript:

Energy efficiency considerations in cryogenics Philipp Arnold Section Leader Cryogenics Proton Driver Efficiency Workshop March 02, 2016

Outline 1)Introduction 2)Cryogenic Design Choices – Some theory – Cooling below 4.5K – Thermal shield – Part-load operation – Staging – LN2 pre-cooling 3)Heat Recovery 4)Helium Inventory Management 5)Summary 2

(1.1) View of the Southwest in Max IV – a national research facility, under construction, opens up in 2015 Science City – a new part of town Lund ( ) Malmö ( ) Copenhagen ( )  MAX IV  ESS

(1.2) ESS Cryogenic System Pure Helium Gas Storage 1 20 m 3 LHe Tank Standalone Helium Purifier Helium Recovery System Pure Helium Gas Storage 2 Accelerator Cryoplant Test & Instrument Cryoplant 5 m 3 LHe Tank Target Moderator Cryoplant LHe Mobile Dewars Test Stand Distribution System Instruments & Experiments LN2 Storage Tanks LN2 Mobile Dewars Cryogenic Distribution System Cryomodules Cryomodule Test Stand Target Distribution System Hydrogen Circulation Box Hydrogen Moderator

(1.3) ESS Energy high level goals 5

Outline 1)Introduction 2)Cryogenic Design Choices – Some theory – Cooling below 4.5K – Thermal shield – Part-load operation – Staging – LN2 pre-cooling 3)Heat Recovery 4)Helium Inventory Management 5)Summary 6

(2.1) Power consumption - Theory – Remember Carnot (theoretical efficiency): 7 Desired cooling temperature Ambient temperature Heat load Electrical input power – Actual consumption: Efficiency of Carnot: depending on Q and T Normalising all heat loads to 4.5K load: ACCP ~ 250 W/W  P/Q = K

(2.1) Refrigeration vs. liquefaction 8 Figures from CERN Divisional Report CRYOGENICS FOR PARTICLE ACCELERATORS AND DETECTORS (2002), U. Wagner, Ph. Lebrun, L. Tavian et. al. 4.5K isothermal refrigeration Liquefaction

(2.2) Cooling below 4.5K – Cooling below 4.5K means sub-atmospheric pressures need to be created Vacuum pumps (rotary vane + roots) for smaller capacities Cold turbo compressors for bigger capacities – Impact on system reliability and operability Helium purity must be ensured (purification, helium guards) Serial rotating equipment Spares 9

(2.2) Cryomodule cooling at 2K 10 Production of 2 K helium in 2-4 K heat exchanger and a sub-sequent JT valve in each of the cryomodule–valve box assemblies  Heat load on CDS only on 4.5K, not 2K level

(2.3) Thermal shield Thermal shield pressures and temperatures depend not on ideal COP w.r.t. Carnot but on entire cryogenic system Temperature level where appropriate expansion stage is Shield Pressure = HP of cryoplant Temperature spread = expansion turbine temperature step 11 TypeTempMax. loadExergy CMs and CDS2 – 4 K3060 W79% Thermal shields33 – 53 K W11% Coupler cooling4.5 – 300 K9.0 g/s10% 300 K 115 K 70 K 53 K 33 K 24 K 9 K 6 K 4.5 K

(2.4) Part load operation 12

(2.5) Cryoplant staging 13 Two sets of flow parts for cold rotating equipment -turbine expanders -cold turbo compressors Variable frequency drives for SP and LP compressors

(2.6) LN2 pre-cooling TICP WITH LN2 PRE-COOLING -CM testing: “constant level liquefaction w/o internal freeze- out purification” -Liquefaction for LHe consumers: “rising level liquefaction w/ internal purification” -  Turbo-expanders can be optimized to perform efficiently in both operation modes -Much better plant fit with easy adapting when higher rate needed (switch pre-cooling on) 14 ACCP WITHOUT LN2 PRE-COOLING -~80% of the load is at 2K  with cold compression translated to 4-20K refrigeration -~20 tons of cold mass max do not impose tough cool-down requirements -No substantial CAPEX impact -Downsides of LN2 usage like dependency on regular supply and increased traffic at ESS more severe

Outline 1)Introduction 2)Cryogenic Design Choices – Some theory – Cooling below 4.5K – Thermal shield – Part-load operation – Staging – LN2 pre-cooling 3)Heat Recovery 4)Helium Inventory Management 5)Summary 15

(3.1) Oil flooded screw compressors Adiabatic compression 16 ESS high pressure stage: Suction pressure: 4 bar(a) Discharge pressure: 20.5 bar(a) NOT FEASIBLE! Quasi-isothermal compression by oil injection T>300°C for ESS HP stage discharge In fact: inlet ~40°C, outlet ~80°C

(3.2) Heat from screw compressors 17 ESS high pressure stage: Helium flow: kg/s Oil flow: kg/s Electrical consumption: 1.45 MW Heat into oil cooler: 1.13 MW

(3.3) Heat Recovery 18 No elevated oil or helium temperatures out of compressor suppliers specs Dedicated cooling water circuit for cryoplant (quality constraints of available cooling water in the building) Slow temperature control on cooling water side, fast temperature control on oil side Cooler design state of the art e.g. for Kaeser compressors Cooling function has priority over heat recovery return Compr. motor Middle temperature Return Middle temperature Supply Oil vessel Helium compressor Helium cooler Oil cooler He to fine oil removal He from cold box High temperature Return Middle temperature Return 27° C 30°C 39°C 71°C 39°C 83°C 49°C 74°C 40°C 69° C 37°C

Outline 1)Introduction 2)Cryogenic Design Choices – Some theory – Cooling below 4.5K – Thermal shield – Part-load operation – Staging – LN2 pre-cooling 3)Heat Recovery 4)Helium Inventory Management 5)Summary 19

(4) Helium Inventory Management 20 (1)Helium inventory in CMs and CDS ~ 2 tons during normal operation (2)20 m 3 LHe tank as second fill – Another 2 tons when 80% full – Facilitate helium management in transient modes (3)Battery of warm storage tanks Try to Never warm up the entire system Leave as much helium liquid as possible (less purification) Recover helium as much as possible Guard sub-atmospheric systems (less purification)

Outline 1)Introduction 2)Cryogenic Design Choices – Some theory – Cooling below 4.5K – Thermal shield – Part-load operation – Staging – LN2 pre-cooling 3)Heat Recovery 4)Helium Inventory Management 5)Summary 21

(5.1) Summary Conceptual phase Cryogenics is expensive and energy demanding Select carefully the operation temperature  by far the biggest impact Keep in mind that a large load portion is static  always substantial energy consumption regardless of beam Talk early to cryoplant vendors to define best technology (cold compression, LN2, 2K heat exchanger position) Consider heat recovery if clients are around 22

(5.2) Summary Purchasing the cryoplant Consider OPEX over several years Consider OPEX particularly for turn-down scenarios Define shield conditions w.r.t. overall efficiency Think about flexibility (VFDs, staging) Specify exactly LN2 and heat recovery set-up Consumption measurement and penalisation Acceptance tests of turn-down automation 23

(5.3) Summary Start up and operations Plan long acceptance testing Focus on stable controls, otherwise turn-down will be controlled with heaters for stability reasons Spend long time on initial drying and cleaning Try to adapt the plant to actual loads as good as possible (look for pressure drops, bypass valves, temperature mixing) Watch helium inventory closely (leaks) 24