Introduction Malte Backhaus CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus1.

Slides:



Advertisements
Similar presentations
SAP Jam Kickoff Meeting (your name here) April 11, 2013 © Copyright All rights reserved.
Advertisements

Lunch & Learn – Session 9 What does good look like? 17 th April 2014.
<<replace with Customer Logo>>
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Viking Project Team Assignment 5 K15T2 - Team 21 1/17/2012.
Design Reviews Peer Reviews. Agenda Peer Reviews Participants of Peer Review Preparation for a Peer Review Session The Peer Review Session Post-peer Review.
> Blueprint Kickoff >. Introductions Customer Vision & Success Criteria Apigee Accelerator Overview Blueprint Schedule Roles & Responsibilities Communications.
Kick-off meeting EL2421, Automatic Control, Project Course.
TARGET2 Information Session September 3rd, 2009 Geert Bakker – Project Manager NL.
Welcome to the San Bernardino County Coach Quarterly Meeting.
Introduction to CS Senior Design Project I / II Prof. Dr. H. Altay Güvenir.
Oral Progress Report on ATRs’ Task Force Young-Woo Yun Leader of the ATRs’ Task Force World Intellectual Property Organization.
Task 2.1: Software Specifications Markus Kissler-Patig.
Blackboard Learn 9.1 © 2010 Blackboard Inc. All rights reserved. Advanced Communication.
Jigsaw Activity. * The room has 3 sections: * Elementary * Middle * High * Please move to the section for your grade level and take your electronic device(s)
Blackboard Learn 9.1 © 2013 Blackboard Inc. All rights reserved. Advanced Communication.
Submission January 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Closing.
Oct 2004 Jon Edney, Nokia Slide 1 doc.: IEEE /1176r0 Submission AP Function Capture Call for input Jon Edney, Nokia.
ACES User Interface Workshop #1 Prototype Inspection 22. November 2011.
Doc.: IEEE /0382r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOAlliedtelesis R&D.
Submission May 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Status Report.
E-Learning Advisory Group Workshop
CRM Project: Requirements Analysis and Definition
Equality & Diversity Leadership Group
Using Technology with under-represented adults
The Vertically-Integrated Projects (VIP) Program: Integrating Undergraduate Education and Graduate Research Bloom, B. S. (Ed.). (1956). Taxonomy of educational.
CUCSA Workgroup Chair Orientation
Implementation Review Team Meeting
Working in Groups in Canvas
Delphi or C++ Builder, with Subversion and Jenkins
ECE361 Engineering Practice

Session Title Session Subtitle
QUALITY IMPROVEMENT FINAL QUARTERLY COLLABORATIVE WORKSHOP
Low Level Road Project – Traffic Management Meeting August 2012
SACM Virtual Interim Meeting
HITSP Project 2007 Work Plan and Schedule Contract HHSP EC
<Location> – <Project Name>, Sponsor: <name>
Professional Writing Introduction.
OSOR - new opportunities for sharing statistical software


<month year> <Sept 2018>


ESSA Monitoring: Existing Resources
Integration of Variable Generation Task Force (IVGTF): Status
COMP390/3/4/5 Final Year Project Introduction & Specification
Presenter #1 • Presenter #2 • Presenter #3 Presenter #4 • Presenter #5
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
<Project Name> Milestone Summary Report
Professional Learning

<month year> doc.: IEEE < e> <November 2018>
Bulloch Information Session
<month year> doc.: IEEE < e> <Mar 2018>
Rotational Assignment Program
CIC BIM Competition Presentation Template & Content Guide
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4n Chinese Medical Band Closing.

<month year> doc.: IEEE < e> <November 2018>
Working Party on Pollution and Energy (GRPE) General information
doc.: IEEE <doc#>
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
September 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802 Tutorial – 15.4g Overview Date Submitted:
Milestone 2 Milestone 4 Milestone 1 Milestone 3 Milestone 5
March 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted:
Milestone 2 Milestone 4 Milestone 1 Milestone 3 Milestone 5
Presentation transcript:

Introduction Malte Backhaus CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus1

Thanks Thanks to all participants Thanks to the CPPM team for the spontaneous workshop organization CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus2

Aims of the workshop Improve development efficiency Get to know each other (!!!) Get an overview of the systems to be developed and their status Point eager new forces to system documentation and code Compile a ToDo list Define milestones Assign tasks CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus3

CPIX demonstrator program schedule CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus4 ABCD Submission of designs Feb 2015 – June 2015 Characterizat ion in Laboratory Sep 2015 – Oct 2015 Test beamsNov 2015 –March 2016 –Nov 2015 – This schedule naturally drives the test system development timeline To be completed and extended with more milestones:

Some Links To be completed during the workshop: HV/HRCMOS Twikis: Main page PCB section USBpix SVN (C++ and PCBs) USBpix Homepage Bonn redmine (to be ported to Git-Hub) Basil: Docs: Examples: pyBAR: Docs: Examples: CCPDv4: Malte Backhaus5 CPIX test system developers workshop 31/03/2015 to 01/04/2015

More Links Malte Backhaus6 CPIX test system developers workshop 31/03/2015 to 01/04/2015

Spirits No “hierarchical” coordination All of us responsible for the test systems Organization Development Documentation User support Success of workshop depends on everyone's contribution to the Agenda + discussion Hands-on session Breaks + Social Dinner ToDo list preparation  Please give your comments + ideas as well for the workshop organization/schedule Social dinner “most important contribution” to the workshop  Thanks Marlon and Angelique CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus7

Workshop schedule Plenty of hands-on and “free time” on purpose Lively discussion guided by slides rather than talks  much time reserved for each contribution Today: Detailed introduction to USBpix and CaRIBOu Code installation and hands-on Social Dinner Tomorrow: Short personal introduction of everyone Compilation of Milestone and ToDo list Task assignment Time for discussion, questions, face to face development start… CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus8