Status of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting KH.

Slides:



Advertisements
Similar presentations
Operation TCR 2 nd of July to 10 th of September 2001 More than 20 major events Events grouped by equipment group and zone affected.
Advertisements

LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
Update on the PSB Cooling and Ventilation Systems
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review
1 ) Infrastructure consolidation (TS/FM and TS/CE groups)
SPS LS1 Planning meeting (N019) 04/09/13
SPS Winter stop Planning meeting (N06) 05/01/2011
NA61 news and plans (May 2013-October 2013) Publications:
PS status 10 August – 17 August 2017
BE-ICS Activities during the LS2 Period (15 min)
Ongoing consolidation of magnets
Review of the Machine Protection System in the PS complex
EYETS David Hay EN-OSS.
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Saturday :12 Stable beams fill 3351 Initial luminosity
The LHC - Status Is COLD Is almost fully commissioned
Planning and Installation
Installations, modifications, consolidation in 2005:
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
RF operation of REX-ISOLDE
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
EN-CV interventions during EYETS for PS and PSB
YETS PS + PS SWY + TT2 Facility Coordinator:
Summary of week 7 Hardware Commissioning:
James Ridewood BE-OP-SPS
TE-MSC activities in SPS during YETS
Alexander Herlert, CERN (PH-SME-IS)
K. Foraz on behalf of OSS members
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Monday 11/07: Recovery Plenty of accesses.
Power cut 18kV cable for EMD404/E9 is heating
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Bernhard Holzer, Joerg Wenninger
Friday 31st August & night
Thursday 10th January 9:30 Network routers restart, all went fine, but only just. 12:00 All power converters from the arcs on at standby 12:00 ELQA test.
Wire almost entirely through beam before BLM triggers dump
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
Monday 24 October hours of 25ns MD
Experimental Areas – LS2 planning
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
LHC - Week 38 Technical stop: Katy Foraz
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Guidelines defined early Dec 2012
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Presentation transcript:

status of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting KH

cooling circuits require kW heat load in order not to freeze circuits of the equipment must not be separated from the main cooling circuit for the temperature surveillance (BE/OP/TI) alarms must be available cooling circuits KH facilitycooling circuitload (present or required) Linacs and LEIRFDED-00049enough heat load PSB + TT2FDED-00065need to generate load PSBF$FSEG-00361need to generate load PSFDED centre anneau need to generate load PSFDED aimant PSneed to generate load PSF$FSEG-00355need to generate load PSFTEB POPSneed to generate load SPS enough heat load North Area enough heat load

MachineCircuitsStatusRem : LEIR - LINACFDED-00049RunningSource of Linac 3 running PSMain magnet FDED Stopped and drained Difficult to keep it loaded PSCentral building FDED RunningLoad from EPC PSPOPS FTEB Stopped and drained Difficult to keep it loaded PS + LinacChilled water PS F$FSEG RunningLinac3 running PSBBooster + TT2 FDED RunningLoad from EPC PSBChilled water Booster F$FSEG RunningLoaded with the ventilation SPSSPS ring FQSTR RunningCryo machine sector 1-2 North areaNA FQSTR-0002 RunningCryo North Area cooling circuits - IEFC 19/10/12

CV will intensify the rounds during the closure especially if the weather is cold. On Monday January 7 th, CV will restart : PS : FDED PS Magnet POPS: FTEB POPS will be fully operational on Tuesday. S.Deleval – IEFC 19/10/12 cooling circuits - IEFC 19/10/12

6. February 2012: a good example Extremely cold and windy weather All the primary circuits were running with a reduced load. Large amount of problems on drinkable and fire hydrant circuits but the primary circuits had well resisted POPS start up was delayed because the filling circuit was frozen → corrective work acheived. IEFC 19 October 2012 S.Deleval – IEFC 19/10/12

Linac2 (see EDMS ): source pulsing, beam on source beam stopper most converters on RF off vacuum maintained PSB: some TT2 converters on all other converters off RF off vacuum maintained PS: converters off RF off vacuum maintained SPS: power converters off RF power amplifiers on (dampers, TWC800, TWC200, IOT prototype in BB3) vacuum maintained cooling stays on proton machines, status KH

machineBE/OPBE/ABPTE/EPCBE/RFBE/CO, IT TE/VSCaccessRPEN/CV*EN/EL* Linac2TISVXXXXXXX PSBTI + SVXXXXXXX PSTI + SVXXXXXXX SPSSVXXXXXXX proton machines, services KH * EN/CV and EN/EL provide always piquet service ‘best effort’ service during working hours, but somebody must be reachable piquets which are not required (magnets, kickers, LL RF, … do not appear) magnets: in case of water leaks best effort OP: TI plus support from beam operators plus supervisor

Linac3 (see EDMS ): source pulsing, beam on source beam stopper most converters on RF off vacuum maintained LEIR: all converters off RF off magnetic cycle prepared in case of re-start vacuum maintained ion machines, status KH

machineBE/OPBE/ABPTE/EPCBE/CO, IT TE/VSCaccessRPEN/CV*EN/EL* Linac3TISVXXXXXXX LEIRTI + SVXXXXXX ion machines, services KH * EN/CV and EN/EL provide always piquet service ‘best effort’ service during working hours, but somebody must be reachable piquets which are not required (magnets, kickers, LL RF, … do not appear) magnets: in case of water leaks best effort

GS: roads cleared fire brigade informed lifts DSO coverage references: Linacs: EDMS other services KH

2013 start-up KH 06-Jan07-Jan08-Jan09-Jan10-Jan11-Jan12-Jan13-Jan14-Jan L2 set upbeam 2 PSB PSB set upbeam 2 PS PS set upbeam 2 SPS SPS set upbeam 2 LHC L3source re-fillset upbeam 2 LEIR LEIR set upbeam 2 PS PS set upbeam 2 SPS SPS set upbeam 2 LHC beam to be given downstream as soon as ready beam parameters to be confirmed well before X-mas