Silicon detectors Other components from previous speakers Run and Preparations Overall impression:  heroic and lucky job, because we assembled exp during.

Slides:



Advertisements
Similar presentations
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Advertisements

D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
DESIGN OF THE HATCH OF THE INSTRUMENT BOOTH OF EUSO-BALLOON version v1.2 Writer : SYLVIE DAGORET- CAMPAGNE Final tests and Health tests1
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
Measurement of Ge detector by New cooling system KEK May 30 th K.Shirotori.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Ge Test-stands at MPI Munich Xiang Liu 1.General 2.Crystals, Test-stands & Results 3.Outlook.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Gain stability and the LYSO beam radiation monitor measurements
DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
Dec
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
R&D Plan on Light Collection Takeyasu Ito Los Alamos National Laboratory.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
Stereo Collab Meeting | CEA Saclay July-2015 Conclusions.
VELO Replacement Girish Patel University of Liverpool.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
Florian Buchsteiner (HEPHY Vienna)
Berkeley status Aug 10th, 2012.
PADME Front-End Electronics
Chris Booth Sheffield 29th March 2006
DT-LHCb coordination meeting 18 April 2016
Mr Ángel Perea Martínez
Completion of the MICE-US construction project
Plans for this week MWPC: wire stretching today
INSIDE in-beam PET system assembly and test at INFN Torino
Jaak Lippmaa HIP, Helsinki University
GEM DAQ-Chamber Integration Test Stand for GE2/1 & ME0 at Florida Tech
G0 Detector Working Group Meeting
Status of 100Mo based DBD experiment
News and brief overview of Beamline plans for the next few months
2K CB FDR Overview:  Agenda, Charge, Review Process
Operations Department
CLAS12 Timing Calibration
BESIII EMC electronics
Operations Department
Advanced Research Electron Accelerator Laboratory
Current Module LT Capability
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

Silicon detectors Other components from previous speakers Run and Preparations Overall impression:  heroic and lucky job, because we assembled exp during beamtime  but stability, consistency compromised Hardware Upgrade Summary 1 Peter Kammel

Si Detector Improvements I 2 Natural setup  SiL/SiR each on separate MSI8 try to improve TFA shaping or modify that sum is 1-4 only prepare attenuator modified Osaka flange  Si16 on MSI16 prepare cables prepare attenuators Accuglas sub-d feedthrough Needs testing Who wants to get involved ? How to organize

Si Detector Improvements II Improve noise stability  Improve feedthrough and cables: high quality BNC cables and lemo  Mount shielded boxes on flange to protect preamp and feedthroughShort cables UW/OU  Other ideas ? In vacuum requires effort, but interesting, if we can use sub-d feedthrough  Build new FADC crate with linear power supply (UW)  Dedicated test set-up for Si16 with MSI16, noise, cables, dynamic range 3

Other system improvements DAQ  500 MHz FADC for muSC and other scintillators or muSC on TDC FADC  Stability of new firmware, better crate, losses under study Alignment  Prepare better alignment laser set-up Ge detector  In good shape, some puzzles, better measurement position? Neutron detectors  Still some work ahead Scintillators  Vacuum seals (better gluing or no aluminum pipe), improve strain relief 4

Run Planning PSI will only run 6 months during the next 2 yrs  Director’s decision to increase funds for new light source construction piE1 was one of the most competitive areas I think it will be difficult to get more than 2 weeks in piE1 (request 4?), neutron measurement in piM1? Final MuSun run. Would 2 weeks be enough ? Run first in cycle with >2 weeks advanced on site preparations, to be ready ? Preparation time in area not a problem, if properly scheduled, separating wall 5