Cleaning Methods of SRF Power Couplers Mircea Stirbet TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011.

Slides:



Advertisements
Similar presentations
Progress and Plan for Superconducting RF Cavity RF Group.
Advertisements

SSRF1 ALUMINUM ALLOY VACUUM CHAMBERS FOR SSRF L.X. Yin, D.K. Jiang, H.W. Du, X.L. Jiang SSRF Vacuum Group Shanghai National Synchrotron Radiation Center.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Vertical Test Area RF qualification of C100 cavities for 12 GeV project Mircea Stirbet Open Collaboration Meeting on Superconducting Linacs for High Power.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Cleaning Methods of SRF Power Couplers Mircea Stirbet Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
IFMIF Power Coupler for HWR Superconducting cavities SRF LINAC GROUP H. Jenhani 1, N. Bazin 1, P. Bosland 1, B. Branas 2, P. Brédy 1, P. Carbonnier 1,
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
JLab UHV omponent leaning and nitrogen blow off procedures and development Ari D. Palczewski JLab Ari D Palczewski, TTC topical 13Nov2014 Sacley France.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Status of the M-ECCTD F. Peauger - P. Bosland
Tongming Huang (IHEP) On behalf of the power coupler working group
Completion of the MICE-US construction project
Field Emission Minimization for LCLS-II
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
Spoke Cavity Power Coupler for the European Spallation Source (ESS)
Uppsala Commitment to ESS and FREIA Planning
Operating SRF systems reliably in a “dirty” accelerator
Fabrication of Nb and Cu SPL cavities and required tools CERN status
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Mathieu, Gabriel, Max, Spyros, Guillaume
Definition of work flow for string DESY Example on critical operation
Mircea Stirbet Jefferson Laboratory
12 GHz High Power RF components requirements for CEA activities
Manufacturing of the IFMIF series power couplers
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Replacement of coupler and recovery of cavity for BEPCII
SNS Fundamental Power Coupler History
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
HIE-LINAC status report
IMP Cryomodule Assembly and Alignment
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
System tests at CEA O. Piquet 19/03/2019
V. Veshcherevich Cornell University
SNS Coupler Shipping Plans
SNS-PPU upgrades the existing accelerator structure
Overview of the TARGET Monolith Rough Vacuum
SNS PPU Cryomodule Design Overview
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Cleaning Methods of SRF Power Couplers Mircea Stirbet TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

Principles TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar The FPC cleaning should start at the design stage - Continue during component manufacture, storage and transportation to the final destination. -The FPC components should be manipulated and cleaned using procedures specific for UHV components to be clean-room assembled on superconducting cavities - FPC’s component transfer to the assembly clean room. (Sash, glove box water basket) - Cleaning and surface control during preparation for and RF power qualification (RF conditioning and power tests on room temperature test stand) - Waveguide gas barrier on the air side of the FPC during RF operation. - Cleaning with RF during cavity qualification tests - Cleaning the external surfaces of FPCs for admission in clean room after RF qualification. - Airside RF contact preservation after FPC assemble on cavity - Cleaning with RF after a long period of machine shut down (if the FPCs are not exposed to RF for a long period of time – months)

FPCs for the SNS Project TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar  coaxial line - VSWR <1.1 at 805 MHz - required Q ext Range = 5 x 10 5 ± 20% - power ratings: 550 kW at 1.3 msec 60 Hz (for 1 GeV) - operating pressure: < mbar - ± 2.5 kV Bias Voltage - He gas cooling on the outer conductor (0.3 g/s, 3 atm, inlet 5K exit 300 K) - Water cooling on inner conductor extension (300 K) - Possibility to water cool the ceramic border (300 K) Two major components: - Vacuum side of the FPC - Air side of the PFC

FPC for SNS at design stage AB C A- FPC initial concept welded outer conductor impact on cleaning!!! B - FPC prototype independent outer conductor C - FPC final concept TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

SNS FPC – vacuum-side components Window assemble and instrumentation: electron pick up antenna and sapphire window for arc detector Outer conductor with two ports for vacuum gauges, He gas cooling channels, copper blocks for heater (ice-ball) and temperature Plenty of bolts, and different gaskets TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

SNS FPC – air-side components TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011 Waveguide for doorknob, outer conductor extension, inner conductor extension and Kapton foil for capacitor. Also on the air side optical view port for arc detector and protection cap for capacitor (“fez”).

- Visual inspection – controlled manipulation - gloves - CMM measurements-controlled manipulation - gloves - Copper plating - Vacuum sealing surfaces, eventual mechanical cleaning of scratches - Vacuum instrumentation ports - Cleaning (degreasing, cleaning UHV) for: a)Vacuum leak check of the window assembly b)FPC assemble in the clean room Operations done with SNS FPC – window assembly TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

Window transport and storage Initial with plastic protection cup ----> metallic cup TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

Operations done with SNS FPC – outer conductor TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar Visual inspection – controlled manipulation - gloves - CMM measurements-controlled manipulation - gloves - Copper plating - Vacuum sealing surfaces, eventual mechanical cleaning of scratches - Vacuum instrumentation ports - HWP rinsing for copper adherence – also cleaning -Acetone cleaning of cooling channels - Cleaning (degreasing, cleaning UHV) for: a)Firing under vacuum for blister test b)Vacuum leak check of the outer conductor internal volume, He gas cooling channels. c)FPC assemble in the clean room

Initial issues on window side TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

Mechanical cleaning TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

Dedicated tooling for FPC manipulation TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar π factor

SNS FPC degreasing UHV cleaning and HPR rinse TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

Outer conductor cleaning As received from plating (no brighteners!)Copper cleaned with micro-clean detergent Copper plated with blisters after firing. Outer conductor sent back to be re-plated. TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

Firing under vacuum TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

Cleaning the SNS FPC window assembly TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar Transport : plastic protections, metallic protection on the air side and air side of the window -Tooling (plastic tube) for initial visual inspection (gloves during CMM) - Instrumentation ports - UHV cleaning for initial qualification (vacuum leak check) - UHV cleaning for FPC clean room assemble on connecting waveguide for bake and RF qualification

Connecting waveguide and clean room FPC assemble TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar Initial cleaning after manufacture – degrease, acid etched, US, N2 dry - UHV sealing surfaces – issues and solutions - Millipore filter - FPC assemble on the connecting waveguide and vacuum leak check while in the clean room. Testing system for vacuum leak outside clean-room. - Transfer of connecting waveguide on the test stand, local laminar flow, vacuum leak check using RGA on the test stand - RF processing vacuum feedback assisted, Final vacuum in mbar - Bleeding to dry, filtered, particulate free nitrogen - External surface cleaning for admission to the clean room for FPC assemble on cavity. - Recover assembled UHV side of the coupler, examine the sealing surface and if issue free assembled on cavity. Purge cavity with filtered N2 gas during assemble. - Vacuum leak check Cavity – FPCs seal.

SNS FPCs during baking TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar Bake under vacuum: RGA information on gas “contaminants” and getting rid of H 2 O molecules…cleaning! - Protection of air-side RF contacts and RGA follow up during bake. - Vacuum after bake conform with UHV requirements (usually was better than mbar).

Typical bake temperature and vacuum profile for SNS FPCs Bake start (RT) After 3 h at 200 o C Bake finished (RT) Bake 24 h at 200 o C Temperature profile Vacuum profile. Final pressure better than mbar. TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

Demonstrate RF power capabilities Of each coupler before FPC assemble on cavity. Check functionality of almost all instrumentation: vacuum gauges, electron pick up antenna, arc detectors, water flow, temperature sensors, DC bias. RF qualification is done after bake, started in TW mode with RF conditioning as function of vacuum followed by RF power tests and then finalized with RF tests in SW mode mbar max vacuum allowed during RF conditioning SNS FPCs RF qualification on room temperature test stand TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011 All 81 FPCs for SNS RF power qualified by summer of 2004 ! €€€

805 MHz 1 MW pulsed RF test stand at JLAB TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

LabView operator interface for RF conditioning stand TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

RF conditioning in TW mode RF power, vacuum and eec vs time Vacuum and electron activity at the beginning of RF conditioning in TW mode TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

CCC test De-conditioning during high power RF tests TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

CW test – long run test CW in TW mode TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar hours run with constant pulse amplitude 650 kW 1 msec 60 Hz

Testing DC bias efficiency in TW mode DC bias test: a) No dc bias ; b) -2.5 kV c) +2.5 kV abc TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

RF power tests in SW mode Vacuum and electron activity in SW mode up to FWD 600 kW. DC bias at the end TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

Issues during SNS FPCs during RF power qualification TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar Normal RF qualification procedure using an “optimized” (administrative) timing: for RF conditioning in TW mode (defined as reaching the maximum klystron output 8 – 12 hours) the remaining power tests including SW mode, about 38 hours. - Enough RF time? NO! Had to use only day time RF… and fit the RF qualification of 2 FPCs in 5 days. Weekends were eventually used for bake. - RF qualification using CW or pulsed RF systems. BIG difference in FPCs RF cleaning efficiency. - What can go wrong during RF power qualification on room temperature test stand: A)On the vacuum side – arcing events B)On the air side – arcing events On room temperature test stand, lost one of the two, clean, already qualified coupler due to uncontrolled RF and subsequent arcing events on vacuum side. For the remaining 81 couplers the total number of arcing events less than 10. Arcing in waveguide and subsequent smoked the air side of the ceramic – cleaned and FPC is in used on cryomodule Arcing marks on the air side – can and should be mechanically cleaned.

FPCs storage after RF power qualification TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011 Storage on connecting waveguide under dry, dust free nitrogen. Use Millipore ® ceramic filter. Storage on outer conductor using protection cup, under dry dust free nitrogen.

Clean room assemble of SNS FPCs on cavity TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011 Avoid qualified FPC contamination during alignment on cavity port. Avoid cavity contamination

FPC air-side on cryo-module during qualification tests in CMTF TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

SNS Cavity Qualification in CMTF at JLAB TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011 FPC RF conditioning as function of vacuum

Last cryomodule delivered to SNS Oak Ridge In Spring of 2005, all 23 cryo-modules (with medium and high beta cavities) have been installed in the SNS SRF linac at Oak Ridge. TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

SNS FPCs Operation at Oak Ridge  World’s first high-energy superconducting linac for protons  81 independently-powered 805 MHz SC cavities, in 23 cryomodules  Space is reserved for additional cryomodules to give 1.3 GeV TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011 J. Mammosser: SPALLATION NEUTRON SOURCE STATUS AND UPGRADE PLANS in: SRF2009 – Berlin, September 2009

FPCs operation at Oak Ridge 6 days 1 day TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011 Conditioning and operation after long shutdown, in summer of No DC bias. Arcs count E acc Vacuum

SNS Operation: Beam to target 1 MW One Megawatt One Megawatt - The Spallation Neutron Source, which contains 23 cryomodules built at Jefferson Lab, has achieved 1 MW of beam power in routine neutron production operation. The first pulsed spallation neutron source to break the one-megawatt barrier, research conducted at the SNS is expected to lay the groundwork for the next generation of materials research. TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011 S. Henderson et al. : “ The Spallation Neutron Source Linac: Performance and Operational Experience” in 2009 Linear Collider Workshop of the Americas, 29 th September 2009

Other cleaning procedures A consommé avec moderation: He processing (done at low vacuum levels, delicate procedure to control the amount of He injected, can lead to ceramic metallization, high He gas levels are difficult to pump out, can make subsequent vacuum leak checks impossible). Plasma cleaning (if not properly controlled, leads to metallization of ceramic components) CO2 cleaning (attention to thermal shocks, adherence of anti-multipacting layer) TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011

Conclusions TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011 Adequate infrastructure: - Production chemroom - Clean rooms, PP - Specific tools: HWP systems, US cleaning baths, DI water, filtered, dry N2 gas, cleanroom carts, cleanroom moving devices, cleanroom supports, clean room particulate counters - Working space for UHV component qualification - Meticulous control of FPCs component cleanness, tooling and infrastructure at all production stages - Bake under vacuum - RF power test stand and adequate controls -Trained personnel Cleaning Recipes The importance of meticulously cleaning the power coupler before it is installed on a clean SRF cavity is widely accepted. Most labs use a combination of ultrasonic cleaning and deionized water rinsing with some high pressure water rinsing.