The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Magway Region Office Priorities and Detailed Description.

Slides:



Advertisements
Similar presentations
The Power Grid ELEC 403 The Citadel Mark McKinney.
Advertisements

11 PUBLIC WORKS AND INFRASTRUCTURE DEVELOPMENT ENERGY & ELECTRICITY PROJECTS IN THE CENTRAL REGION Director: K.J Leepile SEPTEMBER 2011.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
1 SINGLE-PHASE METALLIC RETURN TECHNIQUE Presented by Moncef AISSA Senior Engineer STEG-Tunisia March 7, 2006 contributors - E. Cecelsky - A. Ounalli -
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Customer Meeting April 28, 2010 Torrington, WY. Agenda Introductions Accomplishments Update on Torrington Area PVVC Overview PVVC Schedule and Cost Estimates.
Outline of JICA’s Assistance prepared for
Electricity Transmission and Distribution. Transformer A device that transfers electricity from one circuit to another.
Policies.
SAUDI ELECTRICITY COMPANY (SEC)
ELG4125 Transmission and Distribution Systems
Pole Mounted Switch Disconnector NPS
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
Frankfurt (Germany), 6-9 June 2011 V Ramesh – India – Session 1: Network components – 1096 Integrated Switching Devices (ISD) V.RAMESH ABB Limited, Nashik,
What makes substation work?
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
Rural Electrification Access by Department of Rural Development
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
SWS and Electrification Lessons from Ghana’s Experience. By: Jabesh Amissah-Arthur, Managing Partner,
Utility Engineers, PC.  Generation  Transmission  Distribution.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Kayah State Office Priorities and Detailed Description of.
The Republic of the Union of Myanmar Ministry of Electric Power
POWER HOUSE.
PSE&G Confidential1 PSEG Electric System Overview Mackington Joseph, MSM, PhD.
Submitted to: Submitted by:
The Republic of the Union of Myanmar Ministry of Electric Power
1 Manufacturer’s Outreach Workshop, Thingaha Hotel, Naypyitaw Myanmar. October
Department of Electrical Engineering
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Ayeyarwady Region Office Priorities and Detailed Description.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
CHALLENGES AND INVESTMENT OPPORUNITIES: THE CASE OF ZESA By Mr Ikhupuleng Dube, System Development Manager – Zimbabwe Electricity and Transmission Company.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Mandalay Region Office Priorities and Detailed Description.
Submitted To:- Submitted By:- Mr.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
Economic Comparison off Grid System. Q1 : Sizing of Solar Panel System Let us consider that one house needs following loads; 10W, 2 lamps for 3 hours.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Rakhine State Office Priorities and Detailed Description.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Kayin State Office Priorities and Detailed Desription of.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Current Electrified Villages Sagaing Region Townships - 11 Villages - 91 Households Kayin State Townships - 5 Villages Households
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Eastern Shan State Office Priorities and Detailed Description.
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
Ministry of Electricity and Energy
Communications channels, tools and methodologies
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Applications of a Reference Network Model to Situations with a High Penetration of Distributed Energy Resources Claudio Vergara, PhD. Massachusetts Institute.
The Republic of the Union of Myanmar Ministry of Electric Power
Sub Station.
The Republic of the Union of Myanmar Ministry of Electric Power
SUB-STATIONS.
Electricity is produced at the power station.
The distribution grid Carcano & Cividini V A/AUTOMAZIONE
The Republic of the Union of Myanmar Ministry of Electric Power
Information about the resort recreation area "Kenderli"
Electric Utility Master Plan Update
Off-grid Electrification Department of Rural Development
The Republic of the Union of Myanmar Ministry of Electric Power
Basics of electrical engineering
AGRICULTURAL COOPERATIVES ACTIVITIES IN MYANMAR
The Republic of the Union of Myanmar Ministry of Electric Power
Installation And Estimation of Service Connection
Pacific Power Seismic Preparedness Update
Yangon Region Rural electrification plan
The Republic of the Union of Myanmar Ministry of Electric Power
The Republic of the Union of Myanmar Ministry of Electric Power
ENCLAVE POWER COMPANY LIMITED
Overview of Electrification Options
Presentation transcript:

The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Magway Region Office Priorities and Detailed Description of Electrification Plan For Magway Region Dated -21.Oct.2015

We always face and solve the case of compensate dealing with the field in construction of lines and substations. Although some farmers are agreed to get the suitable rate identified by the MOEP, some are not. When they want to get more than the suitable rate, we will face with many difficulties ( problems ) We want to construct new substations and upgrade the present distribution substation such as magway (Natmout Street) substation, Pakokku substation, Kanma substation, Pakhangyi substation, etc – according to the ratio of increasing electrification rate. In my opnion, Kanpyar, myothit, myinkin substation in Manway district, Myaing, Yesakyo (Tamartan) substation in Pakokku district, Thayet substation in Thayet district and Hnan khar substation in Gangaw township should be constructed extensively in magway region. As Per DE Idea after discussion with Local government 2

The additional electrification statement due to Newly and Replacement 66/33/11kV substation and related power line for Magway Region NoTownship To be constructedThe effective area Estimated cost (million kyats) Substation 66kV Line (mile) 33kV Line (mile) Total Villages Total House hold Total Popu lation Materia l Instal lation Total 1 Pakokku (Substation 1) Replacement 66/11 kV 10 MVA to 20 MVA Sustation Pakokku (Substation 2) Replacement 66/11 kV 5 MVA to 10 MVA Sustation Pakokku66kV Line Magway (KanPya) Newly 33/11 kV 10 MVA Sustation Magway (KanPya)33kV Line Magway (Myin Kin) Newly 33/11 kV 5 MVA Sustation Magway (Myin Kin)33 kV Line REMARK - The former 66/11 kV, 10 MVA TR; from Pakokku(1) is intended to use for Pakokku(2) 3

Pakokku District Number of Village- 209 Household Estimate Cost (Million Kyats) Transformer-232 Nos Magway District Number of Village- 203 Household Estimate Cost (Million Kyats) Transformer-236 Nos Thayet District Number of Village- 90 Household Estimate Cost (Million Kyats) Transformer-104 Nos Gangaw District Number of Village- 24 Household-2832 Estimate Cost (Million Kyats) Transformer-31 Nos Minbu District Number of Village-139 Household Estimate Cost (Million Kyats) Transformer-153 Nos Magway Region Number of Village-665 Household Proposal 11kV Line Transformer-756 Nos Estimate Cost (Million Kyats) Electrification Plan for Villages of Magway Union Territory (Within 2 miles from Existing 11 kV Distribution Line) 4

Detailed Electrification Plan for Magway Region (Within 2 miles from Existing 11 kV Distribution Line) NoDistrict Name Of Village to be Electri f- ied No of Hou se Hou se hold Popu lation To be constructed Estimat ed cost (Mil Kyates) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Lines (Mile s) Estimat ed Cost (Mil Kyats) mile Material Cost Tran sport Cost Const ructio n Cost TotalKVANo Materi al Cost Tran sport Cost Const ructio n Cost Total 1 Magwa y Min Bu Pakokk u Thayet Ganga w Total

Location Map Of Electrification Plan for Magway District (Within 2 miles from Existing 11 kV Distribution Line) Magway Township Number of Village-34 Household-6779 Estimate Cost (Million Kyats) Transformer-49 Nos Chauk Township Number of Village-30 Household-3525 Estimate Cost (Million Kyats) Transformer-35 Nos Salay Town Number of Village-8 Household-1221 Estimate Cost (Million Kyats) Transformer-8 Nos Myingon Town Number of Village-8 Household-1147 Estimate Cost (Million Kyats) Transformer-10 Nos Michaungye Town Number of Village-10 Household-1829 Estimate Cost (Million Kyats) Transformer-16 Nos Yenangyaung Township Number of Village-15 Household-2224 Estimate Cost (Million Kyats) Transformer-12 Nos Natmauk Township Number of Village-8 Household-1491 Estimate Cost (Million Kyats) Transformer-11 Nos Myothit Township Number of Village-44 Household-8545 Estimate Cost (Million Kyats) Transformer-49 Nos Taungdwingyi Township Number of Village-46 Household-6344 Estimate Cost (Million Kyats) Transformer-47 Nos Magway District Number of Village-203 Household Proposal 11kV Line Transformer-236 Nos Estimate Cost (Million Kyats) Minbu District 6

Detailed Electrification Plan for Magway Township(Within 2 miles from Existing 11 kV Distribution Line) No Town Ship Name Of Villag e to be Elect rified No of Hous e Hous e hold Popu lation To be constructed Estim ated cost (Mil Kyate s) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Lines (Mile s) Estimat ed Cost (Mil Kyats) mile Mater ial Cost Tran sport Cost Cons tructi on Cost TotalKVANo Mater ial Cost Tran sport Cost Cons tructi on Cost Total 1Magway Myyinco n Miechau ngyie Yaenanc haung Chauk Salay Taungtwi ngyi Myothit Natmauk Total

Location Map of Electrification Plan for Minbu District (Within 2 miles from Existing 11 kV Distribution Line)

Detailed Electrification Plan for Minbu District (Within 2 miles from Existing 11 kV Distribution Line) No Town Ship Name Of Villag e to be Elect rified No of House Hous e hold Popu lation To be constructed Estim ated cost (Mil Kyate s) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Lines (Mile s) Estima ted Cost (Mil Kyats) mile Materi al Cost Tran sport Cost Cons tructi on Cost TotalKVANo Mater ial Cost Tran sport Cost Cons tructi on Cost Total 1Min Bu Sagu PwintPhy u Salin Sinbyugy un Nga Pe Sidoktaya Total

Location Map Of Electrification Plan for Pakokku District (Within 2 miles from Existing 11 kV Distribution Line) Myaing Township Number of Village-50 Household-4417 Estimate Cost (Million Kyats) Pauk Township Number of Village-50 Household-6457 Estimate Cost (Million Kyats) Seikphyu Township Number of Village-14 Household-1357 Estimate Cost (Million Kyats) Pakokku Township Number of Village-58 Household-6598 Estimate Cost (Million Kyats) Yesagyo Township Number of Village-37 Household-5327 Estimate Cost (Million Kyats) Pakokku District Number of Village-209 Household Proposal 11kV Line Transformer-232 Nos Estimate Cost (Million Kyats)

Detailed Electrification Plan for Pakokku District (Within 2 miles from Existing 11 kV Distribution Line) No Town Ship Name Of Village to be Electrifi ed No of Hous e Hous e hold Popu lation To be constructed Estimat ed cost (Mil Kyates) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Lines (Mile s) Estimat ed Cost (Mil Kyats) mile Mater ial Cost Tran sport Cost Cons tructi on Cost TotalKVANo Mater ial Cost Tran sport Cost Cons tructi on Cost Total 1 Pakok ku Yesaky o Myaing Pauk SeikPh yu Total

Location Map of Electrification Plan for Thayet District (Within 2 miles from Existing 11 kV Distribution Line)

Detailed Electrification Plan for Thayet District (Within 2 miles from Existing 11 kV Distribution Line) No Town Ship Name Of Villag e to be Electri fi- ed No of Hous e Hous e hold Popu latio n To be constructed Estimat ed cost (Mil Kyates) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Line s (Mile s) Estimat ed Cost (Mil Kyats) mile Mate rial Cost Tran sport Cost Cons tructi on Cost Total KV A No Mate rial Cost Tran sport Cost Cons tructi on Cost Total 1Thayet Aungla n Sinpau ng wae Kanma Mintone Total

Location Map of Electrification Plan for Gangaw District (Within 2 miles from Existing 11 kV Distribution Line) No. of villages- 24 Household Proposal 11 kV Line Proposal 11/0.4 kV Tr;- 31 Estimate Cost (Mil kyats) Ganggaw Township No. of villages- 6 Household- 871 Estimate Cost (Mil kyats) Htilin Township No. of villages- 4 Household- 564 Estimate Cost (Mil kyats) Kyaukhtu Township No. of villages- 10 Household- 938 Estimate Cost (Mil kyats) Saw Township No. of villages- 4 Household- 459 Estimate Cost (Mil kyats) 14

Detailed Electrification Plan for Gangaw District (Within 2 miles from Existing 11 kV Distribution Line) No Town Ship Name Of Village to be Electrifi ed No of Hous e Hous e hold Popu latio n To be constructed Estimat ed cost (Mil Kyates) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Lines (Mile s) Estimat ed Cost (Mil Kyats) mile Mate rial Cost Tran sport Cost Cons tructi on Cost TotalKVANo Mate rial Cost Tran sport Cost Cons tructi on Cost Total 1Gangaw Htilin Saw Kyaukht u Total

Sr.N o Fiscal Year State/Region Capital Budget for ESE(mil, Kyats) State/Region Capital Budget for DRD(mil, Kyats) Electrified Connection Total Cost for 11kV Line & 11/0.4kV TR Total Cost for 400V Line TotalOff Grid ON GridOff Grid Villag e (Nos) Consum er (Nos) Village (Nos) Consu mer (Nos) Estimate (BE+RE) Estimate (BE+RE) Estimate (BE) Grand Total The Statement of Fiscal Year Budget and Electrical Connection for Magway Region 16

Main Materials List Transported to Magway Region Office Sr No DescriptionQuantitesTransported Site 1Distribution Transformer756 2Concrete Poles Medium Voltage Conductor Insulator Surge Arresters, Disconnectors, Fuses Other Assorted Accessories Total

Main Materials List Transported to Magway District Office Sr No DescriptionQuantitesTransported Site 1Distribution Transformer236 To Magway District 2Concrete Poles9123 3Medium Voltage Conductor7481 4Insulator Surge Arresters, Disconnectors, Fuses 711 6Other Assorted Accessories 18

Main Materials List Transported to Minbu District Office Sr No DescriptionQuantitesTransported Site 1Distribution Transformer153 To Minbu District 2Concrete Poles6855 3Medium Voltage Conductor4871 4Insulator Surge Arresters, Disconnectors, Fuses 459 6Other Assorted Accessories 19

Sr No DescriptionQuantitesTransported Site 1Distribution Transformer232 To Pakokku District 2Concrete Poles Medium Voltage Conductor7441 4Insulator Surge Arresters, Disconnectors, Fuses 696 6Other Assorted Accessories Main Materials List Transported to Pakokku District Office 20

Sr No DescriptionQuantitesTransported Site 1Distribution Transformer104 To Thayet District 2Concrete Poles4294 3Medium Voltage Conductor3296 4Insulator Surge Arresters, Disconnectors, Fuses 312 6Other Assorted Accessories Main Materials List Transported to Thayet District Office 21

Main Materials List Transported to Gangaw District Office Sr No DescriptionQuantitesTransported Site 1Distribution Transformer31 To Gangaw District 2Concrete Poles1513 3Medium Voltage Conductor991 4Insulator341 5 Surge Arresters, Disconnectors, Fuses 93 6Other Assorted Accessories 22

23