Vacuum: 12GeV Hardening Anthony DiPette Installation / Vacuum Group Leader 7/16/2015.

Slides:



Advertisements
Similar presentations
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Advertisements

Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
G2P Target installation and Beyond. Schedule Pivot before.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
NLC Beam Delivery Area Engineering: Vacuum System Cost Model Presentation by Leif Eriksson, 02/09/99.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
Proton Source Repairs Dan Bollinger 2/1/10. Cockcroft-Walton accelerators FNAL has 2 Cockcroft-Walton Pre-accelerators (Pre-acc) that provide beam to.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Proton Source Vacuum Plan By David B. Augustine Ben Ogert Jr. August 30, 2011.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
MTA Installation Meeting February 21, 2007 Agenda 1)Progress report (Fernanda+Carol) 2)Floor Plan layout (Fernanda+Larry) 3)AOB Key Red – critical Orange.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
ELENA installation progress F. Butin / ELENA collaboration.
S A Griffiths CM42 June 2015 Electrical & Control.
Report Technical Director Storage-Ring-Installation Completed
PETRA III, Status and Upgrade
Introduction and Goals
TE-MSC-SCD EYETS th September, 2017.
Spin Precession At CEBAF
ELENA installation and commissioning status
CEBAF Accelerator Status
NL C100 Vacuum Spikes and Valve Trips
Cornell ERL Prototype Injector DC Photocathode Gun Design Review Vacuum Systems Yulin Li, January 5th– 6th, /5-6/2011 Cornell Gun Review.
Jefferson Lab Reliability Task Force and Initiatives
Long Shutdown for the LHC: Vacuum Beam Pipes
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
Vacuum System Failures at HERA
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
352MHz Klystron Control for the 3MeV Linac test stand
SNS Operational History
Tuesday 11th September LHCb dipole presently fault off
Control systems plans & activities for HL-LHC during LS2
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
Joseph Meyers Magnet Measurement Facility
Regular cryomodule maintenance plans (radiation damage, seals, etc)
SB Packing Automatic Downpuller Power Unit
Accelerator status after the 12 GeV upgrade
BLM planning 03/03/2014.
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Strategy for operation and recovery of performance at SNS -Background -History of performance -What is our operational strategy -Performance recovery.
Performance Recovery at CEBAF
LS1 status 17/03/2014.
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
Injector / Linac Installation Current Status
Warm Region Radiation Damage and Plans
Installation and Beam Test Schedule
StayTreat Wrap Up OPS 2015 StayTreat.
Extraction Michael Bevins May 17, 2007
SNS PPU Cryomodule Design Overview
Linac4 Connection Broken Line 07/08/19
Isotope Readiness Review Run Plans
Presentation transcript:

Vacuum: 12GeV Hardening Anthony DiPette Installation / Vacuum Group Leader 7/16/2015

Page 2 Vacuum: 12GeV Hardening Vacuum Improvements & Status Synchrotron Radiation Effects Vacuum Spares

Page 3 Vac Improvements - Linac Viewer Bellows 9 of 11 Done Viewer Location New Bellows 1L02 1L06 1L10Done 1L14Done 1L18Done 1L22Done 2L02Done 2L06Done 2L10Done 2L14Done 2L18Done Viewer Bellows

Page 4 Vac Improvements - Air Lines Air Lines changed from Poly to Copper – 100% Complete Copper Air Line

Page 5 Vac Improvements - VBV Pigtails New Connectors & Cables to replace Rad damage –100% Complete North and South VBV Pigtail upgraded for Radiation environment

Page 6 Vac Improvements - Position Switches VBV Position Switches from Plastic to Metal –41% Complete All-Metal Switch w/pigtail

Page 7 VBV Position Switches (A,B) Replaced Metal switches Steve's Rad Survey List 1L02 1L03 1L04 1L05 1L06 1L07 1L08 1L09 1L10 1L11 1L12 1L13 1L14 1L15 1L16 1L17 1L18 1L19 1L20 1L21 1L22 1L23 1L24 1L25 1L261L26A1L26 2L02 2L03 2L04 2L05 2L06 2L07 2L082L08A 2L09 2L10 2L11 2L12 2L13 2L14 2L15 2L162L16A2L16 2L172L17A 2L18 2L19 2L20 2L21 2L222L22B2L22 2L232L23A & B2L23 2L242L24A2L24 2L252L25A2L25 2L26 Vac Improvements - Position Switches VBV Position Switches from Plastic to Metal VBV Position Switches (A,B) Replaced Metal Switches 1L02 1L03 1L04 1L05 1L06 1L07 1L08 1L09 1L10 1L11 1L12 1L13 1L14 1L15 1L16 1L17 1L18 1L19 1L20 1L21 1L22 1L23 1L24 1L25 1L261L26A 2L02 2L03 2L04 2L05 2L06 2L07 2L082L08A 2L09 2L10 2L11 2L12 2L13 2L14 2L15 2L162L16A 2L172L17A 2L18 2L19 2L20 2L21 2L222L22B 2L232L23A & B 2L242L24A 2L252L25A 2L26 VBV Position Switches (A,B) Replaced Metal switches Steve‘s Rad Survey List Mike's Data Avg Radial Mike's Data Max Radial Mike's Data Avg BL Mike's Data Max BL 2L242L24A2L L222L22B2L L232L23A & B2L L L252L25A2L L L261L26A1L L L L L082L08A L L162L16A2L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L172L17A L L L Replace during SAD L24B 2L22A 2L03A & B 2L25B 1L05A & B 1L26B 1L21A & B 1L17A & B 2L11A & B 2L08 B 2L26A & B 2L16B 1L24A & B 2L15A & B 1L11A & B 2L07A & B 2L12A & B 1L12A & B 1L13A & B Switches Replaced: PreSAD9 SAD32 Total41 Remaining59$38k

Page 8 Vac Improvements – VIP’s VIP Recovery -Goal is 100% SAD Start VIPProblemStatusCounts 3A17Pump ShortedRed0Green 4S00BRailedRed37Red 4S01ARailedRed0Yellow 4S03ARailedRed37Total VIP's 4S00CRailedRed BS00Clean High Volt Feed through. Install pwr suppliesRed 3S02Clean High Volt Feed through. Install pwr suppliesRed 9S01Clean High Volt Feed through. Install pwr suppliesRed 7S01AClean High Volt Feed through. Install pwr suppliesRed AT02RailedRed 6E03RailedRed AT05BRailed plus Small Leak foundRed 0L10Suspect leakRed AA05Spurious Burps in Pressure needs investigationRed AA06Spurious Burps in Pressure needs investigationRed AA08Spurious Burps in Pressure needs investigationRed AA09Spurious Burps in Pressure needs investigationRed 2L24ALeak checkRed 1L18Adegraded due to leaking ITVRed 1L22Abuggered out widen trip levelRed 0102not communicating with epics- had been intermittentRed 1P01Configuration issue-KetchumRed 1A24Railed needs investigationRed 1A26Railed needs investigationRed 2A16Railed needs investigationRed 4T09ARailed needs investigationRed 6S03ARailed needs investigationRed 6E01ARailed needs investigationRed 6E02Railed needs investigationRed 6T06ARailed needs investigationRed 6A01Railed needs investigationRed 8A25Yellow needs investigationRed 8R01Yellow needs investigationRed 5C03Intermittant grn, yellow, railed. InvestigateRed 9A22Railed needs investigationRed 9R07ARailed needs investigationRed 1R09Railed newRed

Page 9 Vac Improvements – VIP’s VIP Recovery -81% Complete VIPProblemStatusCounts 3A17Pump ShortedGreen30Green<80 uA 4S00BRailedRed3 ≥100 uA 4S01ARailedRed0Yellow80-99 uA 4S03ARailedGreen4OFF 4S00CRailedRed37Total VIP's BS00Clean High Volt Feed through. Install pwr suppliesGreen 3S02Clean High Volt Feed through. Install pwr suppliesGreen 9S01Clean High Volt Feed through. Install pwr suppliesGreen 7S01AClean High Volt Feed through. Install pwr suppliesGreen AT02RailedGreen 6E03RailedGreen AT05BRailed plus Small Leak foundGreen 0L10Suspect leakGreen AA05Spurious Burps in Pressure needs investigationGreen AA06Spurious Burps in Pressure needs investigationOFF AA08Spurious Burps in Pressure needs investigationOFF AA09Spurious Burps in Pressure needs investigationOFF 2L24ALeak checkGreen 1L18Adegraded due to leaking ITVGreen 1L22Abuggered out widen trip levelGreen 0102not communicating with epics- had been intermittentGreen 1P01Configuration issue-KetchumGreen 1A24Railed needs investigationGreen 1A26Railed needs investigationGreen 2A16Railed needs investigationGreen 4T09ARailed needs investigationGreen 6S03ARailed needs investigationGreen 6E01ARailed needs investigationGreen 6E02Railed needs investigationGreen 6T06ARailed needs investigationGreen 6A01Railed needs investigationGreen 8A25Yellow needs investigationGreen 8R01Yellow needs investigationGreen 5C03Intermittant grn, yellow, railed. InvestigateOFF 9A22Railed needs investigationGreen 9R07ARailed needs investigationGreen 1R09Railed newGreen Joint effort troubleshooting by Vac & Vac ICN to include cables, connectors, cards, VIP hi-potting, VIP repair, and power supply replacements. Additional improvements made by Vac ICN to Rad harden the VIP power supplies with upgraded HV diodes.

Page 10 Synchrotron Radiation Effects –Analysis of Thermal effects* Synchrotron radiation heating was evaluated in the higher energy arcs (x-direction) and the higher energy spreader/recombiner dipoles (y-direction). Arc’s max temperature at girder bellows flange is 70 deg C (158F) ZA’s max temperature at top of chamber is 39 deg C (102 F). Reports indicate these are conservative temps higher than expected and indicate the synchrotron radiation heating will not be a problem for 12GeV CEBAF. –Run Experience During our Spring run some vacuum excursions were noted in the 2R and 2S regions. As a precautionary measure additional Turbo pumps were added to the common vacuum in 2R and 2S (unexpected synchrotron radiation effect?). The pumps provided no change in the vacuum state and were valved out. The machine settled out and the Turbo’s remained valved out for the duration of the run. –Actions Taken The turbo pumps were removed and serviced, if needed they are ready to be deployed. *”Synchrotron Radiation Power at CEBAF 12 GeV Upgrade” B Yunn and Eduard Pozdeyev. TN *“Synchrotron Radiation Thermal Effect on the 12 GeV CEBAF” - June 20, 2006, M. Wiseman, S. Slachtouski, K. Wilson, and B. Yunn *“Synchrotron Light Radiation Heating in 1 st Spreader” – 2010 (unreleased), C. Dubbe

Page 11 Vacuum Spares –Position Switches, Metal - 0 ($640 ea), Plastic - 24 –VBV’s Linacs – 4 General Accel – 20 –VIP’s New 11 L/s – 2 New 25 L/s – 1 ($1800 ea) 11 L/s ready for rebuild ($600 ea) 11 L/s on Rad Hold – 21 (approx. 6 mo to 1 yr to release) –VIP Ion Packs/ Power Supplies - 11 –Tunnel Pump Carts - 4

Page 12 Vacuum: 12GeV Hardening - Conclusion –Proactive improvements have been made to the Vacuum System based on downtime and repairs and is ready for the 12 GeV run. –Vacuum Improvements will continue during upcoming SAD’s.

Page 13 Vacuum: 12GeV Hardening Thank You!!! Anthony Dela Cruz George Greenfield John Heckman Leo Ketchum Jim Kortze Mark Lester Greg Marble Elliott Smythe Joshua Thomason