Belle II Science and Overall Project Tom Browder University of Hawaii.

Slides:



Advertisements
Similar presentations
M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
Advertisements

ACHIEVEMENTS OF THE TEVATRON FIXED-TARGET PROGRAM Heidi Schellman Northwestern University 1 6/11/12.
KAGEYAMA, T. Open Meeting for Proto-Collaboration March 19, 2008.
Super B factory plan at KEK Masa Yamauchi KEK Super B Factory Workshop April 20-22, 2005 Honolulu Why, how, what, who, when and how much?
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Jan 28th, 2009Colin Jessop at Notre Dame An experiment to measure CP violation in B mesons Colin Jessop University of Notre Dame.
June-10 th, 2005 WIN05 Super B factories Shoji Uno ( KEK) Super B factories Shoji Uno ( KEK) June-10 th, 2005 WIN05 Delphi, Greece Contents 1. Physics.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
June 2000Status of BELLE1 Beyond e + e - Workshop The Homestead Glen Arbor, MI Daniel Marlow BELLE Princeton University June 17, 2000.
July 2000Results from BELLE1 IV th Rencontres du Vietnam Hanoi, Vietnam Daniel Marlow BELLE Princeton University July 22, 2000.
March 2000The First Data from BELLE1 First Data from BELLE HEP Seminar University of Chicago Daniel Marlow Princeton University March 13, 2000.
1 Optics and IR design for SuperKEKB Y.Ohnishi 1/19-22, 2004 Super B Factory Workshop in Hawaii.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Super B KEK - Super KEKB -
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
B. Golob, Belle II 1/23Epiphany Conference, Cracow, Jan 2012 Boštjan Golob University of Ljubljana/Jožef Stefan Institute & Belle/Belle II Collaboration.
Status and Physics Prospects of the SuperKEKB Project Y. Horii Tohoku Univ. (Japan) 1 5th March 2011, La Thuile 2011.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Scientific Highlights : CDF Experiment 1.Introduction 2.CDF Run-II detector 3.Phyiscs highlights B Physics, Top, Higgs, … to be continued by Rob October.
The BELLE II project and other … B.A.Shwartz Budker Institute of Nuclear Physics of SB RAS, Novosibirsk, Russia.
The Belle Experiment at KEK Christoph Schwanda Institute of High Energy Physics (HEPHY) Austrian Academy of Sciences Symposium Wissenschaftliche Kooperation.
What are we made of ? Neutrinos Building a Particle Collider The ring is 27km round and on average 100m underground CERN – LEP, LHC.
Welcome to the 1 st Open Meeting of the Super KEKB Collaboration. (T. Browder, University of Hawaii) [All talks and discussions about the detector, physics.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
Discovering the Higgs Boson J. Pilcher Talk for Graduate Students January 9, 2004.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Neutral Current Deep Inelastic Scattering in ZEUS The HERA collider NC Deep Inelastic Scattering at HERA The ZEUS detector Neutral current cross section.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
New Ideas for Super B Factories for Flavour Physics Steve Playfer University of Edinburgh, Future Directions, BEACH 2006 Lancaster, July 2006.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Synergy between Energy and Luminosity Frontiers (Summary) 1 Y.Sakai (KEK)
1 Recent results from Belle and Status of SuperKEKB/Belle II Chengping Shen Univ. of Hawaii, Belle collaboration.
1 Experimental Particle Physics PHYS6011 Fergus Wilson, RAL 1.Introduction & Accelerators 2.Particle Interactions and Detectors (2) 3.Collider Experiments.
ECLOUD’12 (the 5 th electron-cloud workshop) Kyo Shibata (on behalf of KEKB Vacuum Group) SuperKEKB Vacuum System KEK Tsukuba site SuperKEKB Linac.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Belle II and LHCb upgrade IITBBS Dec 14-21, 2015 Gagan Mohanty TIFR, Mumbai.
Future Colliders Gordon Watts University of Washington/Seattle APS NW Meeting May 12-14, 2016.
J.W. ASEPS KEKB Upgrade Plan: SuperKEKB J.W. Flanagan ASEPS
Prospects for quarkonia at SuperKEKB Stephen Lars Olsen Seoul National University Heavy Quarkonium 2011, 4-7 October, GSI, Darmstadt.
Pavel Pakhlov ITEP, Moscow For the Belle/Belle-2 Collaborations Belle-2 experiment at SuperKEKB New Physics P h y s i c i s t Unlike the cat we can build.
Project Overview James Fast Pacific Northwest National Laboratory.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Future e + e - Flavor Facilities (Tom Browder, University of Hawaii) Apologies: Borrowed slides from many hardworking Belle II, SuperB, SuperKEKB collaborators.
H.-G. Moser, Jennifer Consortium Meeting, Rome, June 10-12, B factories - results and motivation for upgrade SuperKEB - how to reach 40x more luminosity.
Belle II status and plans
Belle II at SuperKEKB Kurtis Nishimura University of Hawaii
The Software Library of the Belle II Experiment
The Belle II Experiment at SuperKEKB
Report on WP2 Activities
New Physics Prospects in Mixing and CP Violation at Belle II
International Collaboration at KEK
Belle II - Introduction
Lecture 2 Live Feed – CERN Control Centre
Utilization of KEKB for ILC R&D
BINP Tau-Charm Project
Super-KEKB Collaboration
Overview of SRF system of Ring and Linac (1)
LAL meeting on e+ studies, Oct. 2010
Status of SuperKEKB May 11, 2007 SuperB Workshop Masa Yamauchi KEK.
Interaction Region Design Options e+e- Factories Workshop
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 6th May 2009 Fergus Wilson, RAL.
B Factories: a truly remarkable story of competition and collaboration
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 28th April 2008 Fergus Wilson. RAL.
Experimental Particle Physics PHYS6011 Joel Goldstein, RAL
Summary of Washington DOE Review
SuperKEKB Proto-collaboration
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

Belle II Science and Overall Project Tom Browder University of Hawaii

19-20 March 20142T. Browder, US Belle II Independent Project Review B Mesons: “Laboratory Rats of the Weak Interaction” Exotic bound state of matter and antimatter (hydrogen-like) b quark mass ~ 5x proton mass Lifetime ~ 1.5ps 1987: A neutral B meson can transform into its anti- particle, “B-Bbar mixing” 2001: Asymmetry between matter and anti-matter found in B meson weak decays. (B Factories)

e + source Ares RF cavity Belle detector World record: L = 2.1 x /cm 2 /sec SCC RF(HER) ARES(LER) Starting point: Belle and The KEKB Collider (A facility located in Tsukuba, Japan) 8 x 3.5 GeV 22 mrad crossing angle March 2014US Belle II Independent Project Review3 ~2 Billion B Mesons produced

19-20 March 20144T. Browder, US Belle II Independent Project Review A history of rich, diverse and productive science outcomes B Factories: BaBar and Belle each produced >400 journal publications across a broad range of physics topics (b, c, tau, 2-photon, ….) Many important discoveries: – New matter-antimatter asymmetries, new weak interaction couplings (b  s, d, u); new states of matter etc. Recognition: the 2008 Nobel Prize in Physics

19-20 March 20145T. Browder, US Belle II Independent Project Review M. KobayashiT. Maskawa 2008 Discoveries about weak interactions of quarks  Nobel Prizes J. CroninV. Fitch T.D. LeeC.N. Yang

19-20 March 20146T. Browder, US Belle II Independent Project Review To explore new physics: SuperKEKB/Belle II is the new international intensity frontier facility for B mesons, charm mesons and tau leptons. Different and complementary capabilities compared to existing facilities: e + e - vs proton-proton (LHC) From the movie “Particle Fever”

7 40 X higher luminosity KEKB to SuperKEKB Redesigned lattice to reduce the emittance (replaced short dipoles with longer ones, increase wiggler cycles ) Replace 3.1 km of LER with TiN-coated beam pipes with antechambers 8 new superconducting final focus magnets Upgrade positron capture section e - 2.6A e + 3.6A Injector Linac upgrade DR tunnel Low emittance RF electron gun Reinforced RF systems for higher beam currents $400M facility upgrade Belle II Detector is $50M US Belle II Independent Project Review Beam size is reduced to 50 nm in vertical, 1 micron in horizontal. Accelerator Facilities March 2014

8T. Browder, US Belle II Independent Project Review Overview of Belle II Detector electrons (7GeV) positrons (4GeV) KLong and muon detector: Resistive Plate Counter (barrel outer layers) Scintillator + WLSF + MPPC (end-caps, inner 2 barrel layers) Particle Identification Time-of-Propagation counter (barrel) Prox. focusing Aerogel RICH (fwd) Central Drift Chamber He(50%):C 2 H 6 (50%), small cells, long lever arm, fast electronics EM Calorimeter: CsI(Tl), waveform sampling (barrel) Pure CsI + waveform sampling (end-caps) Vertex Detector 2 layers DEPFET + 4 layers DSSD Beryllium beam pipe 2cm diameter ++Background commissioning detector

19-20 March 20149T. Browder, US Belle II Independent Project Review High Level Schedule including US Milestones Key dates at KEK: Phase I (No Final Focus Quads, No Belle Detector): Jan 2015 Phase II (Final Focus, Belle, no vertex detectors): Feb 2016 Phase III (Final Focus, Belle, vertex detectors): October 2016

19-20 March T. Browder, US Belle II Independent Project Review Belle II: A Truly International Team 599 Collaborators, 97 institutes, 23 countries

19-20 March T. Browder, US Belle II Independent Project Review U.S. Leadership in Belle II D. Asner, EB and FB rep from US J. Fast, TOP leader M. Schram, network coordinator, US rep CSG A. Schwartz, speakers committee

19-20 March T. Browder, US Belle II Independent Project Review Summary SuperKEKB upgrade construction nearing completion – First beams in 2015 – First physics run starts in late 2016 – ~$400M Japanese investment to upgrade accelerator Belle II – $50M upgrade so detection systems can operate with the much more intense particle beams and backgrounds – U.S. contributions target areas in which we have historically had leadership and which are vital to the physics program A diverse and productive science program awaits us – Unique international facility that will operate for over a decade

19-20 March T. Browder, US Belle II Independent Project Review Backup slides

19-20 March T. Browder, US Belle II Independent Project Review Latest Belle II Schedule

19-20 March T. Browder, US Belle II Independent Project Review SuperKEKB luminosity profile Goal of Belle II/SuperKEKB 9 months/year 20 days/month Commissioning starts in early Shutdown for upgrade Integrated luminosity (ab -1 ) Peak luminosity (cm -2 s -1 ) Calendar Year Belle/KEKB recorded ~1000 fb -1. Now change units to ab -1

19-20 March T. Browder, US Belle II Independent Project Review SuperKEKB is the e + e - intensity frontier 40 times higher luminosity   KEKB PEP-II

KEKB Design KEKB Achieved : with crab SuperKEKB Nano-Beam Energy (GeV) (LER/HER)3.5/ /7.0  y * (mm) 10/105.9/ /0.30  x * (mm) 330/ /120032/25  x (nm) 18/1818/243.2/5.3  y  x (%) 10.85/ /0.24  y (  m) /0.062 yy / /0.081  z (mm) /5 I beam (A)2.6/ / /2.6 N bunches Luminosity (10 34 cm -2 s -1 ) Parameters for KEKB and SuperKEKB Nano-beams are the key (vertical spot size is ~50nm !!) 17US Belle II Independent Project Review19-20 March 2014