Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?

Slides:



Advertisements
Similar presentations
L1 Track Trigger for ATLAS at HL-LHC
Advertisements

Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
The ATLAS Upgrade Programme Thorsten Wengler ECFA High Luminosity LHC Experiments Workshop 1 st – 3 rd October 2013 Aix-les-Bains, France.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Real Time 2010Monika Wielers (RAL)1 ATLAS e/  /  /jet/E T miss High Level Trigger Algorithms Performance with first LHC collisions Monika Wielers (RAL)
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee.
L1Calo Intro Cambridge Group, Dec 2008 Norman Gee.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
ATLAS upgrades Xmass meeting Current ATLAS Operations ATLAS has been working very well  First beams in Sept recorded successfully by all sub- detectors.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Valeria Perez Reale University of Bern On behalf of the ATLAS Physics and Event Selection Architecture Group 1 ATLAS Physics Workshop Athens, May
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Mark Thomson University of Cambridge WP6: L1Calo Upgrade.
CMS Week Sept '07Leonard Apanasevich (UIC) Pedrame Bargassa (Rice) 1 Physics Priorities for Trigger Development Leonard Apanasevich (UIC) Pedrame Bargessa.
Monitoring of L1Calo EM Trigger Items: Overview & Midterm Results Hardeep Bansil University of Birmingham Birmingham ATLAS Weekly Meeting 11/11/2010.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
Towards a Phase-II ‘Strawman’ …work in progress… R.Middleton, on behalf of B.Barnett I.Brawn N.Gee W.Qian D.Sankey 1.
A Fast Hardware Tracker for the ATLAS Trigger System A Fast Hardware Tracker for the ATLAS Trigger System Mark Neubauer 1, Laura Sartori 2 1 University.
Upgrade intro and report on DESY Upgrade Meeting 5 May 2010 Norman Gee.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Phases: to be 2 or to be B? The question of new timescales ● L1Calo phase 2 → phases B and C? ● Implications for design ● Example timescales ● Organising.
L1 Technical Proposal: Phase 2 ● Slow progress on writing TP phase 2 – Distractions with beam and calibration – Also some things are still unclear ● Hence.
Phase2 Level-0 Calo Trigger ● Phase 2 Overview: L0 and L1 ● L0Calo Functionality ● Interfaces to calo RODs ● Interfaces to L0Topo Murrough Landon 27 June.
Multi-step Runs – an L1Calo Perspective
Rainer Stamen, Norman Gee
ATLAS calorimeter and topological trigger upgrades for Phase 1
The Totem trigger architecture The LONEG firmware archtecture
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
LHC during week 45 LHC delivered ~0.837 fb-1 in week 45
UK Simulation Planning
Machine-Experiment Interface
L1Calo upgrade discussion
Optical data transmission for
Japan Participation in Phase-II TDAQ Upgrade
ATLAS L1Calo Phase2 Upgrade
Francesco Forti University and INFN, Pisa
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
The First-Level Trigger of ATLAS
ATLAS: Level-1 Calorimeter Trigger
Commissioning of the ALICE-PHOS trigger
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Installation, Commissioning and Startup of ATLAS & CMS Experiments
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Upgrade Intro 10 Jan 2010 Norman Gee

N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?

N. Gee – Upgrade Introduction 3 LHC Plans LHC Machine used to plan two steps of luminosity increase –Now seems to be more of a continuous evolution –Exact dates very uncertain, tending to move later –But for ease of planning, ATLAS is still talking about two phases of upgrade “Phase I” : Ultimate luminosity ~3 x –Requires changes to collimators and new Linac (being built) –Main change in ATLAS is insertion of new inner detector b-layer (IBL) –Needs 6 month shutdown. ATLAS plans this for 2014, but must coincide with integration of new Linac into LHC “Phase 2” : Ultimate luminosity 5-10 x Beam in 2020? –10 35 very hard to handle; we prefer machine with “Luminosity Levelling”, detunes machine to reduce peak luminosity and retunes as beam current & quality decline – gives 5 x –ATLAS Major rework -18 month shutdown: new inner detector & forward calorimetry, digital calorimeter readout, muon chambers & electronics

N. Gee – Upgrade Introduction 4 TDAQ Upgrade Activities TDAQ R&D Proposal developed in 2009 –Agreed by TDAQ Institute Board, Signed by 90% of TDAQ institutes –Submitted to ATLAS Upgrade Steering Group, now under review When they agree, final step would be approval by ATLAS Exec Board –Defines 9 work package areas (One common, 5 Phase I, 3 Phase II) First All-of-Level-1 Meeting to start cross-Level-1 discussions (like RD27) –Identify missing details – e.g. what signals come from Muon into Topo Processor, what exactly is required from upgraded CTP –New TDAQ Upgrade Twiki area under development (T Perez) ATLAS Letter of Intent (to LHCC) describing ATLAS Phase-II plans TDAQ chapter in LoI partly written –Currently based on R&D proposal text; needs more definite strawman –To be included in TDAQ Open meeting 18 Jan –Second draft to be circulated mid-February

N. Gee – Upgrade Introduction 5 Phase I – Level-1 Issues Luminosity 3x. No change to most detector electronics (not enough time) –Keep within same maximum trigger rate – or less (readout limits) –Must stay in 2.5  s latency envelope (less is better for LAr) –Events per bunch crossing rises from 20 events at design luminosity to ~60. Isolation thresholds may have to be raised to control rates –But raising trigger thresholds kills physics signatures No change in analogue info from calorimeters –Possibility of improved pulse handling (MCM upgrade studies) Proposal to add topological processing (also involves L1Muon and AFP) L1Muon studying addition of Tilecal rear sampling to muon trigger CTP firmware upgrade to accept more input bits (faster input links) Hence current studies –Monte Carlo studies (what benefit do topological algorithms bring?) Monte Carlo has difficulties with pileup. Results essential for Ph I & II design –Architectural studies –Technology demonstrators

N. Gee – Upgrade Introduction 6 Phase II: Level-1 Muon Trigger Rate Kunihiro Nagano (Rome TDAQ week) CSC rates for b/c/W are well reproduced by this resolution convolution method The determining factor is resolution L2 muFast: better resolution than L1 by using MDT L2 muComb: better resolution than muFast by combining to ID track L1 rate is >100kHz with MU20, >50 kHz with MU40 How the rate improves with resolution improvement can be guessed from this plot

N. Gee – Upgrade Introduction 7 Phase II – Level-1 Triggers L1Muon proposals to add additional chambers to improve P T resolution –Use of MDTs needs more latency? L1Calo Upgrade plan is to use finer-grain calo signals –This will allow some selection algorithms like those used today in Level-2 (use shower profile) Need to produce isolation signals for L1Muon –Not obvious that jets are best for this Proposals to add a Level-1 Track Trigger –Primary aim to help with muon trigger rate –May also help with electron identification

N. Gee – Upgrade Introduction 8 L1Track – Two Options Track trigger needs (partial) tracker readout, but can’t read out selected layers at 40MHz Either : Standalone, using radially-adjacent silicon layers –Layers are electrically connected (radial chips) –Coincidence logic identifies high-PT tracks –Coincidence data are read out for every bunch crossing, & processed off detector Or (preferred): Regional tracker readout round RoIs from L1Calo/L1Muon –L1Calo/L1Muon reduce rate from 40MHz to ~400kHz “L0A” –A few (~4) Regions of Interest (RoIs) identified, readout requests sent to tracker modules within the RoIs –Only a few % of tracker is read out per L0A In both cases, readout is priority multiplexed into main silicon readout 8

N. Gee – Upgrade Introduction 9 Current Level-1 Hardware Trigger

N. Gee – Upgrade Introduction 10 Possible Phase I Level-1 Trigger

N. Gee – Upgrade Introduction 11 Possible Phase-II Hardware Trigger

N. Gee – Upgrade Introduction 12 Activities in L1Calo reporting today Monte Carlo Simulation Hardware R&D & Technology Demonstrators Architecture Studies This evening… Management discussion of institute responsibilities