Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Affairs Net Load Peak ELCC 2016-02-18 Draft Results / Work.

Slides:



Advertisements
Similar presentations
2013 Statewide BIP Load Impact Evaluation Candice Churchwell DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco, California May 7, 2014.
Advertisements

R RA Phase II Proposals Workshop (day 2) January 25, 2011 Court Yard room 10:00 am- 2:45 pm.
1 R Phase I Resource Adequacy Workshop presentation March 30, am to 5 pm California Public Utilities Commission 505 Van Ness Ave.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Status Report: Resource Adequacy (RA) and Long Term Procurement Planning (LTPP) CPUC Energy Division Molly Tirpak Sterkel cpuc.ca.gov; Tel:
David Howarth MRW & Associates Oakland, California 1 JUST THE FACTS: RESOURCE PLANNING AND PROCUREMENT INDEPENDENT ENERGY PRODUCERS ANNUAL.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
BOSTON DENVER LONDON LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Effective Load Carrying Capability of Wind Generation: Initial Results.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
NERC LTRA Update / CDR Capacity Counting Issues
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
California Solar Initiative Public Forum Hosted by CCSE October 15, 2008.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Coincident Peak Load Forecasting Methodology Prepared for June 3, 2010 Meeting with Division of Public Utilities.
SM SOUTHERN CALIFORNIA EDISON® Page 1 Discussion on CEC’s and SCE’s Forecast Differences Presentation at CEC Preliminary Demand Forecast Workshop July.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
1 CPUC Avoided Cost Workshop Introduction and Overview.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
Leading the Way in Electricity TM Tariff Programs & Services Customer Services Business Unit Overview of Demand Response At Southern California Edison.
California ISO – Internal Use Only Flexible Capacity Requirement CPUC RA Workshop March 30, 2012 Mark Rothleder Executive Director Market Analysis and.
1 Part 74 Material Control and Accounting (MC&A) Rulemaking Update NMMSS Users Annual Training Meeting Las Vegas, NV – May 20, 2010 Thomas Pham Material.
Southern California Edison SM Southern California Edison Company Proposed AB920 Net Surplus Compensation Rate [NSCR] July 9, 2010.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
Generation Adequacy Task Force Update to WMS November 18, 2009.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
2016 Attachment O Projected Net Revenue Requirements Customer Meeting October 29, 2015.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
2010 Work Plan Steering Committee January 29, 2010.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Summary of Astrapé Reserve Margin Impact Analysis for the PUCT Pete Warnken WMS February 4, 2015.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
LOLEv Methodology Details GATF April 5, Calculation of the Target Reserve Margin in the LOLEv study The reserve margin is calculated by the following.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Policy SCE Discussion on the Relationship Between NQC and EFC.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Affairs Demand Response and Local RA Criteria Discussion
1 R Workshop on 2016 RA proposals Energy Division Staff Procurement Oversight and Resource Adequacy California Public Utilities Commission Thursday,
AES HUNTINGTON BEACH ENERGY PROJECT
GATF Loss of Load Process (or How to Make Sausage) October, 2012.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Capping Local RA Requirements at System RA Requirements February 9, 2015 Karl Meeusen California ISO.
May 9 th, 2016 California Public Utilities Commission Power Charge Indifference Adjustment (PCIA) Workshop.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
Multifamily Working Group Announcement Webinar
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Variable Energy Resource Capacity Contributions Consistent With Reserve Margin and Reliability Noha Abdel-Karim, Eugene Preston,
Compliance Report to ERCOT BOD December 2006
Self-Generation Forecast CED 2017 Preliminary
Calculation of Payments for Renewable Energy Systems
COPS MAY 2014 UPDATE TO TAC 5/29/2014
Generation Adequacy Task Force Update to WMS
Proposal for Distribution Group Studies
Performance Process STEP PROCESS GUIDELINE DATES ACTION
Resource Adequacy Demand Forecast Coincidence Adjustments
CMPLDWG Composite Model with Distributed Generation Approval
For more information, please see our methodology at: 
CMPLDWG Composite Model with Distributed Generation Approval
City of Enumclaw Shoreline Master Program Periodic Update
DER Growth Scenarios and Load Forecasts Working Group
Resource Adequacy Steering Committee Meeting October 4, 2011
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Presentation transcript:

Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Affairs Net Load Peak ELCC Draft Results / Work in Progress

Group Name SOUTHERN CALIFORNIA EDISON SM Regulatory Affairs SM SOUTHERN CALIFORNIA EDISON® Exceedance Methodology Gap Problem 1 Reserve Margin Net Load Need Gap Peak Load Need How Much Solar and Wind Reduce Net Peak Wind and Solar QC Non-Solar and Non-Wind RA Resources Using a single month of load/wind/solar data we can determine what ELCC of solar and wind is needed to eliminate the gap problem (i.e. make the gap 0). RA Requirement after Solar and Wind Draft Results / Work in Progress

Group Name SOUTHERN CALIFORNIA EDISON SM Regulatory Affairs SM SOUTHERN CALIFORNIA EDISON® Net Load Peak based ELCC could provide a useful data point to help validate LOLE ELCC results Comparison of ELCC Methods –Loss of load event based ELCC analysis, such as that performed using SERV-M, calculates a resource’s contribution towards reducing the frequency of loss of load events (LOLE-ELCC) –A Net Load Peak based ELCC calculates a resource’s contributions towards reducing the net load peak (NLP-ELCC) A NLP-ELCC may not exactly match the results of a LOLE-ELCC, but SCE believes it provides intuitive results that will be useful data points when validating ELCC values of resources. SCE is interested in party feedback on the idea of using a NLP-ELCC to validate the efficacy of LOLE-ELCC results. 2

Group Name SOUTHERN CALIFORNIA EDISON SM Regulatory Affairs SM SOUTHERN CALIFORNIA EDISON® July 2017 Solar Results Comparison 3 Energy Division ELCC Results: 57.8% Gap Created: 2,000 MW ELCC to Eliminate Gap: 31.2% Draft Results / Work in Progress

Group Name SOUTHERN CALIFORNIA EDISON SM Regulatory Affairs SM SOUTHERN CALIFORNIA EDISON® April 2017 Solar Results Comparison 4 Energy Division ELCC Results: 57.8% Gap Created: 4,000 MW ELCC to Eliminate Gap: 0% Draft Results / Work in Progress

Group Name SOUTHERN CALIFORNIA EDISON SM Regulatory Affairs SM SOUTHERN CALIFORNIA EDISON® July 2017 Wind Results Comparison 5 Energy Division ELCC Results: 12.6% Gap Created: 0 MW ELCC to Eliminate Gap: 25.0% Draft Results / Work in Progress

Group Name SOUTHERN CALIFORNIA EDISON SM Regulatory Affairs SM SOUTHERN CALIFORNIA EDISON® Solar ELCC Results Comparison 6 Month 2017 Weighted ELCC / Technology Composite 2018 Weighted ELCC / Technology Composite Annual ELCC Result 2017 Net Load Peak ELCC 119% 38% 58% 0% 220% 39% 58% 0% 323% 40% 58% 0% 466% 62% 58% 0% 568% 63% 58% 34% 669% 63% 58% 35% 765% 61% 58% 31% 865% 61% 58% 41% 966% 61% 58% 14% 1056% 58% 16% 1119% 38% 58% 0% 1219% 38% 58% 0% Draft Results / Work in Progress

Group Name SOUTHERN CALIFORNIA EDISON SM Regulatory Affairs SM SOUTHERN CALIFORNIA EDISON® Wind ELCC Results Comparison 7 Month 2017 Weighted ELCC / Technology Composite 2018 Weighted ELCC / Technology Composite Annual ELCC Result 2017 Net Load Peak ELCC 17% 10% 13% 8% 212% 13% 20% 317% 15% 13% 7% 416% 14% 13% 1% 525% 19% 13% 11% 622% 17% 13% 20% 716% 14% 13% 25% 815% 14% 13% 17% 911% 12% 13% 27% 109% 11% 13% 2% 116% 9% 13% 2% 128% 10% 13% 3% Draft Results / Work in Progress

Group Name SOUTHERN CALIFORNIA EDISON SM Regulatory Affairs SM SOUTHERN CALIFORNIA EDISON® Next Steps SCE is interested in party feedback on the idea of using a NLP-ELCC to validate the efficacy of LOLE-ELCC results. SCE is planning on submitting this proposal during the March 11 th “Optional Revisions to Proposals” filing For questions and comments, please contact: Martin Blagaich 8