07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Quality assurance and tests  Quality assurance should include:  Before arriving to CERN.

Slides:



Advertisements
Similar presentations
. TYPICAL SUPERCONDUCTING MAGNET TEST SEQUENCE. PREPARATORY TESTS AT ROOM TEMPERATURE Lyre Test: Simulate Effect of Thermal Contraction in Cold condition.
Advertisements

Daikin Altherma™ Troubling Shooting
Quad Plus Shredder Drive Maintenance Joe Kowalkowski Engineering Manager – Recycling Industry
Properties of cast resin transformers
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s: Power Engineering 1 WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s Power Engineering Department of.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS Charging System tests & Voltage information Checking the charging system with just a volt meter.
Pulse Width Modulation (PWM) LED Dimmer Circuit
8/10/20151 THE BASICS OF INFRATECH HEATER CONTROLS.
National Highway Traffic Safety Administration Electrical Safety William Joel Sánchez.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Copyright © 2008 Rockwell Automation, Inc. All rights reserved. Direct-to-Drive Technology Product Feature Overview.
Stephen Pemberton TE-MPE-EE 1 DQLPUR Prototype Testing Initial Results: Thermal Tests Voltage Drop Off Tests.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Generating and Using Electricity
PROEDIT WRITING A PROCEDURE USING THE BUILT-IN PROCEDURE WIZARD.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Controls and Electrical Preferred Technologies Steve Pavis PH-DT-DI CERN Advel Power Supplies and ABB Circuit Breakers.
41 st LSC – March 21, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report The upgrade of 600 A Energy Extraction Systems.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
MPE-TM 17/10/2013 G.J. Coelingh TE-MPE-EE ENERGY EXTRACTION Development of Semi-Conductor Switches Alexandre Erokhin, Gert Jan Coelingh, Bozhidar Panev,
Intelligent Boiler Sequencing
CUE – Make Any Pump an E-Pump
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Beam Loss Monitor Production. IHEP (Protvino) V. Grishin, A. Koshelev, A. Larionov, V. Seleznev, M. Sleptsov, A. Sytin At IHEP manufactured: Ionization.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
30kA Energy Extraction Semi-Conductor Switch SM18 - CLUSTER D Recall Gert Jan Coelingh on behalf of all team members TE-MPE-EE.
AND Gate Inputs Output Input A (Switch) Input B (Switch) Output Y (Lamp) 0 (Open) 0 (OFF) A B Lamp.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
Angelo Orlando for the NEMO collaboration VLV T08, Toulon, France April International Workshop on a Very Large Volume Neutrino Telescope for.
Technical English Unit 45: Circuits and components Dr. Basil Hamed Technical English Islamic University of Gaza April, 2016.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
World Leaders in Combustion Management Solutions OverviewExplanationFurther Information Application Further Information Explanation Introduction Application.
Inner Triplet Protection Strategy LHC & HL-LHC Daniel Wollmann with Inputs from B. Auchmann, G. Ambrosio, R. Denz, P. Fessia, E. Ravaioli, F. Rodrigues.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
S A Griffiths CM42 June 2015 Electrical & Control.
2013 CHIGO Product CHIGO CMV VRF Control System.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Doble Power Factor Bushing Test
Power Supply and Energy Extraction System for the CBM magnet
IBBelle: Status & Plans
The New C55* CPVSd 10-20hp People. Passion. Performance.
CHIGO VRF System Commissioning.
Outcome of BI.DIS Fast Interlocks Peer Review
SUB-STATIONS.
Unit 45: Circuits and components Dr
Circuits and components Chapter 45
Unit 45: Circuits and components Dr
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
Mersen’s Fused Coordination Panelboard
LS1 TE/MPE/EE CABLE ACTIVITIES
Reduction in Downtime via Interlocking
Auto-Control street lights
Power Supply and Energy Extraction System for the CBM magnet
SHANGHAI ROTORCOMP COMPRESSOR ONLY USE.
Universal Dim Actuator UD/S
November technical stop activities:
Condition Monitoring for Power Electronics Reliability (COMPERE)
Series 5300 Lithium Cell Formation System
Unit 45: Circuits and components Dr
Its strengths, your benefits
Presentation transcript:

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Quality assurance and tests  Quality assurance should include:  Before arriving to CERN - Factory Acceptance Tests on the manufacturer’s premises are the obligatoire!  Input control of the components. Travellers, responsibilities  Input test of the delivered parts (quality test, electrical tests, pressure tests). Travellers, responsibilities  Approved test program  Complete test documentation, responsibilities  Maintenance programme  List of the spare parts

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Parts input control  Input control for the parts Heatsinks: Surface test under 25 bars Correct printing of the grease Mounting Check “pattern” after dismounting

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE What should not be accepted Parts input control

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Busbars: Surface check (especially for the connection flags) Pressure tests with 25 bars Correct lamination and hi-pot test Parts input control

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Test programme  Visual control  Insulation test – 2.5kV. Dry conditions  Complete system pressure test – 25 bars  Insulation test – 2.5kV. With the water running  Interlock tests  Functional tests without current  Functional tests for each IGBT separately  Functional test for the groups of GBTs  Faults simulation – reaction control  Complete system functional tests  Heat run

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Functional tests without current Test programme Auxiliary voltages control IGBTs commutation cycles ON – Off Oscilloscope measurements for the gate side Interlock tests Analogue channels: noise, offsets, calibrations

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Test programme Functional tests with current Tests of 1 IGBT: DC 0 – full current, opening, transients, overvoltages… 3 rd level snubber calculations and implementation for all IGBTs Introducing IGBTs one by one. Master – Slave configuration

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Test programme Functional tests with current Complete system: Introducing delays for the switching Off for different IGBTs reaction control: oscillations overcurrents safe triggering Switching Off in normal conditions: oscilloscope shots for the transients DC test: Current sharing, analogue measurements, thermos scans

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Test programme Heat run Complete system: Ultimate current heat run for 1-2 hours Ultimate current heat run for 8 hours All temperatures should be monitored: Input and output water Heatsinks Laminated busbars Distribution busbars Ambient temperature Vce monitoring versus current and temperature Thermo scans every 30 minutes.

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Test documentation EDMS document – complete test programme All results to be saved in MTF

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Maintenance, spares Regular maintenance programme – regularity, volume, procedure… Regular check programme – regularity, points to checked, procedure… Spares – XX%, availability… Still to be determined!

07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Thanks for your attention!