Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.

Slides:



Advertisements
Similar presentations
Evaluation Independent Monitoring Presented at: LPSC Staffs Technical Conference and ESIs Bidders Conference for the Fall 2006 Limited-Term RFP September.
Advertisements

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
2004 Congestion Costs. 2 Transmission Congestion Occurs when analysis shows a given outage of a transmission element (contingency) will result in the.
Critique of Proposal to Designate SAPS-Shrew as CRE Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) June 4, 2009.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Lyndonville Electric Department Feasibility Analysis Review December 2,
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Review of Proposed Zonal Market Improvements ERCOT Board of Directors Meeting February 17, 2009 Dan L. Jones Potomac Economics Vice President Director,
ERCOT PROGRESS REPORT Board of Directors Austin, Texas October 15, 2002.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
LAREDO RMR EXIT STRATEGY Presentation to Technical Advisory Committee March 4, 2004 Transmission Services Operations.
RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.
Unit-Specific Bid Limits based on Modified Generic Cost.
1 TAC Report to the ERCOT Board February 21, 2006.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 12, 2006.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Long Term Study Transmission Results May 21 st, 2013.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
ERCOT – MISO DC Tie Study Comments
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
RMR Exit Strategies Update TAC November 6, RMR UNITS.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
2009 ERCOT CSCs and Congestion Zones (10/8/08) C. Richard Ross American Electric Power Service Corporation.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
WMS UPDATE CMWG n CMWG has completed their data collection and evaluation of congestion n Based on this evaluation WMS recommends that the same CSCs with.
OOM During Alerts ERCOT TAC June 7, 2007 Dan Jones Potomac Economics.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Reliability Must Run Workshop Introduction May 24, 2016.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Houston Import Study Update
Protocol Revision Subcommittee
Description of Project
TAC Report to the ERCOT Board
TAC Report to the ERCOT Board
Initial ERCOT Parking Deck Prioritization Recommendation
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Status Update for Reliability/Market Power Mitigation Assessment
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
TAC Report to the ERCOT Board
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Warren Lasher Manager, Long-Term Planning and Policy
RMR Update November 6, /05/2002.
Initial ERCOT Parking Deck Prioritization Recommendation
Status of the Planning Working Group’s (PWG) Efforts
(Additional materials)
ECEN 460 Power System Operation and Control
Presentation transcript:

Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station

Frontera Proposal – Presentation Outline Presentation of the Frontera alternative to the Bates RMR –A “market solution” (Greg Ramon, Juan Villa) ERCOT presentation of its modeling efforts and analysis of the Frontera proposal to assess the technical and economical feasibility of the proposal (Dan Woodfin) Discussion question: Does ERCOT have to delay further development of the Frontera proposal until the new PRR on non-transmission alternatives has been implemented? (Greg Ramon, Bill Bojorquez, TAC)

Frontera Plant Background Purchased by TECO in March 2001 in the CSW/AEP Merger Located in Mission, Texas (Mc Allen Area) next to the Bates Plant 450 MW Output – GE Combined Cycle 2 x 1 Commercial Operation - May 1999/2000 AC Tie with Mexico at 138 kV allows 150 MW of transfer (one CT)

Bates RMR Exit Strategy Background Current Recommendations –Build DC Tie with Mexico –Continue Bates RMR until DC Tie is available (Q ) Assumptions –Bates modeled out –Frontera modeled out One CT out supplying to Mexico (150MW) Second CT out on first Contingency (150MW), and The ST out without either CT generating (150MW) Thus Bates and the total Frontera plant is modeled out for reliability purposes and consequently the DC Tie has been identified as a transmission solution to resolve resulting transmission problems and to allow for the removal of the Bates RMR contract

Bates RMR Exit Strategy Background (Contd) Under this assumption and until the 345 kV loop is completed in 2008: –Bates RMR $20.0 Million/year ( ) –DC Tie with $ XX Million/year ( )

Potential Benefits Frontera could provide immediate service in 2004 Frontera could replace Bates RMR and DC Tie Frontera may postpone the 345 kV Valley Loop

Potential Solution (How ?) Frontera agrees to forego sales into Mexico to change underlying assumptions – 225 MW remains in ERCOT even upon first Contingency ERCOT and Frontera agree on technical requirements (scheduling requirements, communications, ramping rates, outage coordination, etc.) Frontera runs economically - “market based solution” ERCOT OOM Frontera OOM Vs. Bates RMR

ERCOT Modeling Model should consider plant dispatch and schedule for transmission upgrades in the region Quantify frequency and magnitude of OOM deployment for Frontera, and Determine potential cost of deployment

Potential Savings – At Least Two Options 1.Sharing of Savings on Uplifted Costs (50/50) Example: (For Discussion Purposes Only) Bates Projected Costs: $20.0 M/yr Frontera Forced Deployments: $10.0 M/yr Savings: $10.0 M/yr shared 50/50 Savings in Uplifted Costs: $5.0 M/yr Settlements proposed to be based on actual costs at end-of-month 2.Fixed Cost Option –Structure a fixed price with savings to uplift Additional Potential Benefits –Avoidance of DC Tie, Delay of 345 kV loop, additional Bates upgrades/maintenance

Should ERCOT Delay Further Development of the Frontera Proposal? Uniqueness of proposal –Limited non-transmission alternatives –Existing Frontera generation alternative is unique in ERCOT for RMR Exit Strategies One 150 MW CT is essentially new capacity to ERCOT for planning purposes If ERCOT analysis is positive then delay is preventing implementation of potentially, a much more cost effective solution to the near term SW Valley congestion problems Does the new PRR policy issues justify delay?

Questions?