IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Risk Monitoring tools: Requirements of Risk Monitors, relation with the Living.

Slides:



Advertisements
Similar presentations
Operation & Maintenance Engineering Detailed activity description
Advertisements

More CMM Part Two : Details.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
PSAEA – CNRA Conference on OEF (Köln, 29-31/05/2006) The relationship between risk analysis and event analysis – PSA based Event Analysis P. De Gelder.
The Australian/New Zealand Standard on Risk Management
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Protection Against Occupational Exposure
Codex Guidelines for the Application of HACCP
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
BASIC PRINCIPLES IN OCCUPATIONAL HYGIENE Day ASSESSMENT OF HEALTH RISKS.
San Diego Workshop, 11 September 2003 Results of the European Power Plant Conceptual Study Presented by Ian Cook on behalf of David Maisonnier (Project.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Irina Sanda Education and Training in the Area of Safety Assessment Irina Sanda Safety Assessment Section Division of.
Diablo Canyon NPP Risk-Informed In-service Inspection
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making System Analysis Workshop Information IAEA Workshop City, Country XX - XX Month,
Risk-informed On-Line Maintenance at Cofrentes NPP IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA.
Human Reliability HUMAN RELIABILITY HUMAN ERROR
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Common Cause Failure Analysis Workshop Information IAEA Workshop City, Country.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Temelin NPP Risk Panel A PSA and Safety Monitor Application Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making PSA Applications Methodologies and Approaches. Status in OECD Countries Workshop.
Safety Assessment of General Design Aspects of NPPs (Part 2) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Proposed Fire Risk Meter Workshop Information IAEA Workshop.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making PSA Quantification. Analysis of Results Workshop Information IAEA Workshop.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Initiating Event Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Practical examples of RIDM application.
Qualitative and Quantitative Criteria for RIDM Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department INFRA.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making “Overview of Level 2 PSA” Workshop Information IAEA Workshop City, Country.
Risk Assessment: A Practical Guide to Assessing Operational Risk
International Atomic Energy Agency Implementation of a Risk-Informed Approach into the Legislative and Regulatory Framework SNRCU Annual Topical Meeting.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
MANAGEMENT INFORMATION SYSTEM
NFPA 805 AND CONFIGURATION MANAGEMENT JIM LECHNER JUNE 7, 2016.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making PSA Fundamentals and Overview Workshop Information IAEA Workshop City, Country.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
Auditing Concepts.
Principles of Information Systems Eighth Edition
PRA: Validation versus Participation in Risk Analysis PRA as a Risk Informed Decision Making Tool Richard T. Banke– SAIC
NON-CONFORMITIES AND EXEMPTIONS AERONAUTICAL STUDIES
Probabilistic Safety Assessment for I&C Systems in NPPs
SYSTEM SAFETY AND THE TECHNICAL AUTHOR
SYSTEM ANALYSIS AND DESIGN
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
Air Carrier Continuing Analysis and Surveillance System (CASS)
Software Engineering (CSI 321)
HSE Case: Risk Based Approach.
Diversity analysis for advanced reactor design
Regulatory Oversight of HOF in Finland
Education and Training in the Area of Safety Assessment Irina Sanda
BASIC PRINCIPLES IN OCCUPATIONAL HYGIENE
TRTR Briefing September 2013
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Presentation transcript:

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Risk Monitoring tools: Requirements of Risk Monitors, relation with the Living PSA, applications of Risk Monitors Workshop Information IAEA Workshop City, Country XX - XX Month, Year Lecturer Lesson IV 3_11.6 Lecturer Lesson IV 3_11.6

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 1 “A PSA of the plant, which is updated as necessary to reflect the current design and operational features, and is documented in such a way that each aspect of the model can be directly related to existing plant information, plant documentation or the analysts’ assumptions in the absence of such information. The LPSA would be used by designers, utility and regulatory personnel for a variety of purposes according to their needs, such as design verification, assessment of potential changes to the plant design or operation, design of training programmes and assessment of changes to the plant licensing basis” Living PSA: Definition

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 2 – –The basis for the LPSA model should be comprehensively documented so that each aspect of the model can be directly related to existing plant information or to the analysts' assumptions of how the plant and the operating staff behave. – –It must be possible to update the LPSA as changes are made to plant design and operation, feedback is obtained from internal and external operational experience, understanding of thermal-hydraulic performance or accident progression is improved, and advances are made in modelling techniques – –A “Living PSA” can only be developed and maintained successfully by a team of qualified analysts with the full support of the plant management and the involvement of different plant departments. Living PSA: General Requirements

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 3 PSA updated as necessary to reflect the current design and operation of the plant Calculates the average risk from the plant - averaged over all modes of operation/ plant configurations Used for design verification, assessment of changes to design or operation, risk informed applications, etc. Used off-line by PSA specialists Living PSA - Definition

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 4 – –A significant part of the PSA applications require near prompt knowledge of the actual risk caused by the actual situation at the plant. This requirement can be satisfied by using a special tool called a Risk Monitor. – –A Risk Monitor is “a plant specific real-time analysis tool used to determine the instantaneous risk based on the actual status of the systems and components. At any given time, the safety monitor reflects the current plant configuration in terms of the known status of the various systems and/or components, e.g., whether there are any components out of service for maintenance or tests. The risk monitor model is based on, and is consistent with, the LPSA. It is updated with the same frequency as the LPSA. The safety monitor is used by the plant staff in support of operational decisions” Risk Monitors

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 5 “Real time” analysis tool ???? Consistent with the LPSA, updated with the same frequency Used to determine the instantaneous risk based on the current mode of operation/ plant configuration Used by plant staff to support operational decisions Risk Monitor - Definition

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 6 – –Provide information on acceptability of point-in-time and annual average risk – –Assist in compliance with Operating Rules (Tech Specs) for unplanned plant unavailabilities – –Advise on the acceptability of future planned plant unavailabilities – –Assist in planning multiple plant unavailabilities – –Provide advice on-line – –Advise with respect to both Deterministic and Probabilistic criteria Uses of Risk Monitors

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 7 – –Risk changes versus time due to several reasons: Component outages Different Plant alignments Maintenance activities Testing External factors: Likelihood of offsite power, increased number of flights over the plant, etc. Plant transients Equipment degradation, plugging, ageing Human factors: The operator is tired today or the new one is on duty etc. – –Neither LPSAs nor Risk Monitors account time dependently for all the influencing factors Why is Risk Time Dependent ?

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 8 – –More flexibility with allowed outages – –Reduced likelihood of reactor shutdown being required – –Forward planning capability helps to reduce average risk – –Rapid response Some Advantages of a Risk Monitor

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 9 Real average risk Estimated average risk Instantaneous risk Risk Versus Time

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 10 – –Analysis of the past: Event incident analysis (PSA-Risk Monitor) Plant Performance, risk profiles (Risk Monitor) etc. – –Analysis of present situation: IST, Technical Specification Analysis (PSA) Exemption to Tech. Specs (Risk Monitor) Plant configuration Control, Risk Management (Risk Monitor) etc. – –Analysis of the future: Maintenance Planning (Risk Monitor), etc. Maintenance Rule (Risk Monitor)   Risk Monitors can be used on and off-line, by PSA experts   and other staff (Operation, Maintenance)   PSA is used off-line and by PSA experts   Uses depend on type of Regulatory Regime PSA / Risk Monitor Uses/Users

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 11 – –With risk monitors we try to assess the effect of plant alignments, component outages and testing and some other factors on instantaneous risk. – –Some other factors affecting risk remain treated as average. Therefore, properly speaking, it is wrong that risk monitors provide real time risk measures. – –However, this doesn’t diminish the usefulness of risk monitors. It is not intended to assess time dependently all the factors affecting risk. – –We only need to make sure that such factors cannot make such an influence at given time, so that adverse decisions can be made based on risk monitor results. In other words, we have to make sure that we treat adequately some factors time dependently and that it is acceptable to consider such other factors as average. Average and Instantaneous Risk Considerations in Risk Monitors

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 12 – –Risk monitors don’t provide real instantaneous risk estimates – –We want to approach to instantaneous risk by taking into account: plant configuration/alignment component outages, testing important factors affecting risk that cannot be obviated, e.g. increased likelihood of initiating events, that could seriously affect decisions based on instantaneous risk estimates. other affordable factors Average and Instantaneous Risk Considerations in Risk Monitors AOTs of deterministic Tec. Specs. don’t consider other factors affecting risk, and don’t even consider simultaneous outages

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 13 – –What are the differences regarding modelling between PSA and risk monitors? – –How to convert a LPSA model to a Risk monitor model? How to keep both updated? – –What applications should be done with each tool? – –Do the requirements of a risk monitor should be different depending on the intended use of it ? Joint IAEA - NEA /OECD Work Technical Differences Between Risk Monitor and PSA

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 14 Accident Sequence Development Initiating events: – –Initiating event frequencies are time dependent in reality: Low time dependent events: LOCA Events governed by outside factors: LOOP (grid instability, severe weather, external events), LOHS (leaves plugging the intake station), etc. Events driven by internal factors (predictable or not): Operational transients, component (conventional or safety related) outages, maintenance and testing activities, etc. How risk monitors could account for that? Is it necessary to account for all this factors? Accident sequence development: Can accident sequences be affected by plant configuration, e.g. Validity of modelling assumptions, probabilities of human errors, etc.?

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 15 – –At the PSA only some particular system configurations are modelled. – –How should the models be modified to account for different configurations?. – –Which solution is adopted by the different risk monitors?. System Analysis

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 16 – –How human actions should or could be assessed depending on plant configuration or time ? – –Which performance shaping factors should be modified? – –Are factors affecting human errors considered as part of the plant configuration? – –How are type 1 and type 3 human errors treated? Human Reliability

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 17 – –Some important events not further analysed can be reassessed given the actual plant status, e.g. LOOP frequency – –Parameters affecting standby models, e.g. last surveillance test time point could be taken into account. –. –etc. Reliability Data

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 18 – –Before an outage the CCF estimate remains the same. What happens when a component of a CCF group fails or is taken out of service? Common Cause

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 19 Pre-Solution – –Large number of runs of the PSA carried out for different plant configurations and stored in a database Cut Set Manipulation – –Cut-set files obtained from solving the PSA to a very low cut off level manipulated to model plant outages ???????? Re-Solution – –RM contains a PSA logic model which is solved for each new plant configuration Hybrid Quantification

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 20 –Removal of asymmetries –Model running and standby trains explicitly –Model cross-connections explicitly –Remove maintenance basic events –Review grouping of initiating events –Replace initiating events screened out in LPSA –Model all safety systems Removal of Simplifications

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making Heysham 2, Essential Systems Status Monitor (ESSM) 1990 – Torness, LINKITT 1994 – San Onofre, Scientech Safety Monitor TM 2002 – >100 plants have RMs in use or under development Development of Risk Monitors

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 22 Planning maintenance outages/configuration control Compliance with US NRC maintenance rule Requires plant operators to assess the risk prior to entering a planned maintenance configuration and after entering a non-voluntary configuration Other Precursor analysis Sensitivity studies Other risk informed applications Frequent Uses of Risk Monitor

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 23 Risk criteria required to distinguish: NORMAL OPERATION no restriction on maintenance MODERATE RISK maintenance needs to be completed urgently time restrictions imposed CAUTION maintenance completed very urgently/ severe time restrictions compensatory measures UNACCEPTABLE RISK immediate action required to reduce the risk Risk Criteria Used in RM

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 24 CORE DAMAGE FREQUENCY UNACCEPTABLE RISK per year CAUTION 1 to 3x10 -4 per year MODERATE RISK ~average risk calc in LPSA NORMAL OPERATION CDF x TIME IN CONFIGURATION < Typical Risk Criteria

IAEA Training Course of Safety Assessment of NPPs to Assist Decision Making 25 – –Development and use of RMs during nuclear power plant operation is now a “mature” practice – –RMs are in day to day operation in a large number of plants worldwide – –RMs accepted by plant managers and station staff – –Safety of nuclear plants is enhanced by the ability to monitor risk on-line – –Use of a RM is a good way of demonstrating that the risk is ALARP Conclusions