21/11/2002 Muon MeetingBurkhard Schmidt Envelopes and Clearances Outline: Definitions General situation Request of Calorimeter group.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

Beam-plug under M2 and HCAL shielding studies Robert Paluch, Burkhard Schmidt October 9,
Behaviour of MicroMega chambers in magnetic field: analysis of H2 June data Outline: (0) Introduction (1) Data set used and noise filtering (2)Cluster.
1 Acceptance & Scraping Chris Rogers Analysis PC
01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
M.apollonioMICE Analysis meeting 23/1/20071 M. Apollonio – University of Oxford Radius of diffuser and sizes for PID.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
December 3, 20031Muon Integration Meeting B. Schmidt Introduction: The present architecture of the Muon System is based on the assumption that the maximal.
5/10/20101GlueX Col meeting, A. Gasparian1 The PrimEx HyCal Calorimeter A. Gasparian NC A&T State University, Greensboro, NC Outline  HyCal calorimeter.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
M.apollonioCM17 -CERN- (22/2-25/2/2007)1 M. Apollonio – University of Oxford sizes for PID & shields.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
Detector studies, Radiation Simulations, Organization FCC Hadron Detector Meeting July 27 th 2015 W. Riegler.
Alice overview New detector and chamber ALICE TC.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Scintillating Tiles for the Muon Inner regions LHCb Muon Upgrade meeting, CERN May Wander Baldini for the Ferrara LHCb group.
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
1 IP Address Space Transfer between Existing Taiwan LIRs Dr. Ching-Heng Ku, TWNIC Policy SIG, APNIC 20, Hanoi, Vietnam September 8, 2005.
Mechanical Drawing (MDP 115)
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.
Performance of Shower Maximum Detectors Saori Itoh (Shinshu Univ.) GLC calorimeter group (KEK,Kobe,Konan,Niigata,Shinshu,Tsukuba) Introduction Detector.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
The interaction of the Laboratori Nazionali di Frascati– INFN with TE-MPE-EM Workshop G. Bencivenni LNF-INFN Frascati - Italy.
December 3, 20031Muon Integration Meeting Outline: Status of Calorimeter and Muon system Plug simulations Status of plug dimensions Conclusions Reminder:
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Hcal Geometry and Assembly Videoconference January 2008, 24th.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
QCG Report Francesco Forti University and INFN, Pisa.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
2 Dec 1998F Harris LHCb Trigger Meeting L0 Trigger - ‘Real Estate’ Considerations Current thinking for the size and location of L0 trigger electronics,
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Feasibility of the detection of D 0 mesons in the NA61/SHINE experiment: Vertex detector for NA61/SHINE P. Staszel and Yasir Ali Jagiellonian University.
DT-LHCb coordination meeting 18 April 2016
Test beams future plans - Discussion session-
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Dead zone analysis of ECAL barrel modules under static and dynamic loads Marc Anduze, Thomas Pierre Emile – LLR CALICE Collaboration Meeting.
Hcal Geometry and Assembly
The LHCb Installation Story
Dubna/JINR Status & Plans
Preliminary Y-chamber specifications – First draft
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Hcal Geometry (second version)
Guidance for hands-on exercise Detector
DET. Integration Inner detector envelope Radial clearances.
Interaction Region Design Options e+e- Factories Workshop
Buttons. Click on any particle type to display the relevant slide with animations. Clicking again will return to this slide. Recommend putting this slide.
QUIZ 7. What are the min number of pieces you will have to consider for determining the centroid of the area? 1 B) 2 C) 3 D) 4 8. For determining.
Beam Halo Considerations for Back Angle Running
S. Bettoni on behalf of the whole team
Presentation transcript:

21/11/2002 Muon MeetingBurkhard Schmidt Envelopes and Clearances Outline: Definitions General situation Request of Calorimeter group

21/11/2002 Muon MeetingBurkhard Schmidt Envelopes and Clearances Outline: Definitions General situation Request of Calorimeter group Definitions: (provided by our TC) Envelope of a detector consists of: +Mechanical dimensions +Mechanical tolerances, piled up if composite +Possible operational deformations (e.g.: bending, overpressure) Clearance: –Space between envelopes, this is "No-man's land" governed by the Technical Coordination -> These two issues were mixed up to now !

21/11/2002 Muon MeetingBurkhard Schmidt Envelopes and Clearances General situation: Tight, in particular around the calorimeters (only 1cm between PS, ECAL, HCAL and M2) Proposal: (of our TC) The only way to get more space is to shift the detector downstream by up to 10cm (maximum) ->The group to whom the space downstream the experiment is allocated (beam pipe) agrees ->What about us? Also for us the situation is tight!

21/11/2002 Muon MeetingBurkhard Schmidt Envelopes and Clearances Proposal (ctd.): (of our TC)

21/11/2002 Muon MeetingBurkhard Schmidt Envelopes and Clearances Proposal (ctd.): In order to adjust to the new mean station positions in the smoothest way, we should keep the pad dimensions of M3 essentially unchanged (6.75mm x 27mm in M3R1), which means negligible differences to the M2, M4 and M5 chamber sizes (<1mm). For M1 the R3/R4 chamber size would be in x=7.9mm less and in y=1.6mm. Concerning the muon filter, an envelope of 82cm seems indicated, given the present ideas on how to build up the walls. We have to be sure that we can make it with a chamber envelope of 36cm ! It leaves about 76mm for each chamber (including tolerances and fixation 79mm).

21/11/2002 Muon MeetingBurkhard Schmidt Request to change envelope at some points for M1

21/11/2002 Muon MeetingBurkhard Schmidt Request to change envelope at some points for M1 The SPD/PS people would like to get additional 5cm in z of M1 at |y|>335cm to avoid complications with the MaPMT and the FE-cards. As it is outside the muon chamber area (sensitive area ends at y=320cm), we have only the support structure there. I have the impression that we can accept this request. Comments ?